HomeMy WebLinkAboutCO 1 CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 12-078 Earlington Sewer Replacement Phase II C.O.# 1 CONTRACTOR: SHORELINE CONSTRUCTION CO. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: ITEM Additional Quantities Under This Change Order Unit Quantity Unit Price Total Price 007. DELETED ITEM:Delete Furnish and Install 12"PVC Sewer Pipe LF 1194 $75.00 ($89,550.00) (This item to be replaced by New Item 023.) 008. DELETED ITEM:Delete Furnish and Install 8"PVC Sewer Pipe LF 845 $70.00 ($59,150.00) (This item to be replaced by New Item 024.) J 017. DELETED ITEM:Delete CIPP Main to Lateral Rehab.8"x6" EA 22 $4,300.00 ($94,600.00) 018. DELETED ITEM:Delete CIPP Main to Lateral Rehab.6'x6" EA 14 $5,600.00 ($78,400.00) 023. NEW ITEM: Install 12"HDPE Sewer Pipe using Pipe-Bursting Method LF 1194 $79.10 $94,445.40 024. NEW ITEM: Install 8"HDPE Sewer Pipe using Pipe-Bursting Method LF 845 $79.10 $66,839.50 025. NEW ITEM: Installation of new Clean Out in place of proposed MH#7. LS 1 $1,014.92 $1,014.92 (Shoreline Construction Co.EWO#1) 026. NEW ITEM: Relocate existing side sewer near MH#6. LS 1 $1,019.17 $1,019.17 (Shoreline Construction Co. EWO#2) 027. NEW ITEM: Remove existing Romac couplings to allow Pipe Burst. LS 1 $1,070.52 $1,070.52 (Shoreline Construction Co.EWO#3) 028. NEW ITEM: Replace failed exisiting outside drop at intersection of SW LS 1 $7,731.76 $7,731.76 Langston Rd and Bagley PL SW with new inside drop. (Shoreline Construction Co. EWO#4) 029. NEW ITEM: Repair 2 broken side sewers tees at 408&501 SW Langston Rd. LS 1 $6,697.37 $6,697.37 (Shoreline Construction Co. EWO#5) 030. NEW ITEM: Repair broken side sewer tee at 209 Lind Ave SW. LS 1 $1,808.21 $1,808.21 (Shoreline Construction Co. EWO#6) 031. NEW ITEM: Reconnect side sewer for 602 SW Langston Rd. LS 1 $3,963.10 $3,963.10 (Shoreline Construction Co. EWO#7) 032. NEW ITEM:Pothole previously unknown gas main and remove existing sewer LS 1 $6,660.21 $6,660.21 main repairs prior to Pipe Burst. (Shoreline Construction Co. EWO#8) 033. NEW ITEM:Additional work to install new 12"PVC around unknown gas main. LS 1 $6,957.73 $6,957.73 (Shoreline Construction Co. EWO#9) 034. NEW ITEM: Repair two main line defects in Lind Ave SW prior to CIPP. LS 1 $12,285.90 $12,285.90 (Shoreline Construction Co. EWO#10) 035. NEW ITEM: Rechannel MH 5318-138. LS 1 $1,404.40 $1,404.40 (Shoreline Construction Co. EWO#11) Sub Total ($109,801.81) Sales Tax (9.5%) ($10,431.17) Total ($120,232.98) ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET CHANGE ESTIMATED CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE $714,844.47 $714,844.47 ($120,232.98) $594,611.49 SIGNATURES: Contractor: Date: �O S.41 Project gineer: Date: ell-7,a If Approved By: Date: System D' H:FileSys\W W P-Wastewater\W W P-27-3615\CO-1-Earlington Sewer Replacement Phase II/JDH