HomeMy WebLinkAboutCO 2 CITY OF RENTON Public Works Department CONTRACT O CT CHANGE ORDER AGREEMENT CONTRACT: CAG 12-083 Liberty Lift Station C.O.# 2 CONTRACTOR: Equity Builders, LLC. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: Additional Items Under This Change Order Unit Quantity Unit Price Total Price ITEM A01: Electrical Equipment Shelter—Pre-Manufactured LS 1 $8,500.00 $8,500.00 As part of the original bid, the City solicited bids on two alternate items (A01 &A02). These items were not included in the"Total Bid Price"for the determination of the low bidder and the award of the contract. While the project was under construction,the contractor was authorized to proceed with the construction of"Alternate Bid Item A01 —Electrical Equipment Shelter—Pre-Manufactured"per the specifications and at the bid price provided. Total ITEM A01 $8,500.00 Sales Tax(9.5%) $807.50 Total Additional Work $9,307.50 ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET CHANGE ESTIMATED CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE $362,554.50 $365,560.22 $9,307.50 $374,867.72 I SIGNATURES: Contractor: O wr►tr- '- S le A o-1, Date: 3 Project Engineer: Date: 2­1122-113 Approved By: JAl) Date: (Utili ies s tem Director) H:FileSys\WWP-Wastewater\WWP-27-3628\CO-2-Liberty Lift Station.doc/MB