HomeMy WebLinkAboutAdden 4 CAG-12-086, Adden #4-14 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ADDENDUM # 04-14 TO CAG-12-086 Between CITY OF RENTON and EA ENGINEERING, SCIENCE, AND TECHNOLOGY, INC. ADDENDUM #04-14 This addendum ("Addendum # 04-14") to CAG-12-086 is agreed to on this l�0 day of January, 2014 ("Effective Date"), by and between the City of Renton, a noncharter code city under RCW 35A, and a municipal corporation under the laws of the State of Washington ("Renton"), and EA Engineering, Science, and Technology, Inc., licensed to do business in the State of Washington ("Consultant"). Renton and Consultant are collectively referred to as the "Parties". The Parties mutually agree to amend their Consultant Agreement related to Quendall Terminals Phase 313 FEIS and Mitigation Agreement work, under CAG-12-086. Prior Addenda to CAG-12-086 Addendum #01-12 increased the Original Contract Sum of Thirty Nine Thousand Seven Hundred Sixty Five dollars ($39,765.00) set forth in Paragraph 4 of the original Agreement by One Thousand Six Hundred dollars ($1,600.00)to an Amended Contract Sum of Forty One Thousand Three Hundred Sixty Five dollars ($41,365); Addendum #02-13 increased the Amended Contract Sum of Forty One Thousand Three Hundred Sixty Five dollars ($41,365) set forth in Paragraph 4 of the Addendum #01-12 by Forty 1 Three Thousand Two Hundred Twenty Five dollars ($43,225.00) to an Amended Contract Sum of Eighty Four Thousand Five Hundred Ninety dollars ($84,590); Addendum #03-13 increased the Amended Contract Sum of Eighty Four Thousand Five Hundred Ninety dollars ($84,590) set forth in Paragraph 4 of the Addendum #02-13 by Seventeen Thousand Two Hundred Eighty Five dollars ($17,285.00) to an Amended Contract Sum of One Hundred One Thousand Eight Hundred Seventy Five dollars ($101,875) and extended the term set forth in Paragraph 3 of the Addendum #02-13 to December 31, 2013. NOW, THEREFORE, in consideration of the mutual terms and covenants previously exchanged and to be exchanged in the future, the Parties agree to the following amendments: SECTION 1. Paragraph 1, entitled Scope of Services, shall be amended as follows: Exhibit A of the Consultant Agreement is edited to the extent required to add additional services for Consultant to perform. Thus, Exhibit A's language shall remain the same except for the additional language contained in Exhibit A of this Addendum. SECTION 2. Paragraph S, entitled Consultant Agreement Sum, shall remain the same except for the following modification: The total amount of this Agreement shall not exceed the sum of Ten Thousand Four Hundred and Fifteen Dollars and no cents ($10,415.00) (with a 5% contingency). SECTION 3. Paragraph 4, entitled Term of Consultant Agreement, shall be amended as follows: The Parties mutually agree to extend the term of this Consultant Agreement to 5:00 p.m. on December 31, 2014. The Parties may agree to extend this Consultant Agreement with another Addendum, if necessary. IN WITNESS WHEREOF, the Parties agree that this addendum, once executed, takes effect on the Effective Date noted above. 2 CITY OF RENTON EA ENGINEERING, SCIENCE, AND CHNOLOGY, INC. C.E. "Chip" Vincent, Administrator Vivanne Knight, Department of Community and Economic Seattle Operations Manager Development 2200 Sixth Avenue, Suite 707 1055 South Grady Way Seattle, WA 98121 Renton, Washington 98057 Z� zoo 6 Date Date Approved as to Legal Form Attest Lawrence J. Warren Bonnie I. Walton Renton City Attorney Renton City Clerk Ll Date Date 3 EXHIBIT A ® 2200 Sixth Avenue,Suite 707 Seattle,WA 98121 Telephone:(206)452-5350 Fax:(206)443-7646 EA Engineering,Science,and Technology,Inc. www.eaest.com December 2, 2013 Vanessa Dolbee, Senior Planner City of Renton Department of Community& Economic Development 1055 South Grady Way Renton, WA 98057 RE: Quendall Terminals, Phase 3B: Prepare and Issue FEIS and Mitigation Document Contract Amendment Dear Vanessa: In April 2013, the City of Renton authorized EA's most recent contract amendment to prepare and issue the Quendall Terminals FEIS and Mitigation Document (Phase 3B of the EIS). To date, EA and our team have prepared two versions of the FEIS for the City of Renton's and Century Pacific's review and comment. We have also assisted the City and Century in finalizing the list of mitigation measures and initiated preparation of the Mitigation Document. However, our Scope of Work for these services has expanded beyond what we anticipated in our last contract amendment and substantial schedule delays have occurred. As of November 15th, we had approximately $6,060 remaining in our Phase 3B budget. We do not anticipate that this budget will be sufficient to complete and issue the FEIS and Mitigation Document. As such, EA is proposing a contract amendment to complete our services on Phase 3B. This amendment is required for several reasons, including: 1) the substantial time and effort required to finalize the list of mitigation measures for the FEIS and the Mitigation Document (we had previously assumed publication of the FEIS and Mitigation Document in spring 2013); 2) the City's desire for the FEIS to be a very robust document, with minimal cross-referencing (we had previously assumed a more stream-lined document, as allowed by SEPA); and, 3)the additional printing costs required by the increased size of the FEIS (the current document is at least 100 pages longer than the Preliminary FEIS). Following is our proposed Scope of Work and Budget for the additional work that will be required for EA to complete and issue the FEIS and Mitigation Document. Scope of Work EA will complete the following tasks in Phase 3B - Prepare and Issue FEIS and Mitigation Document: • Task 1: Prepare the For-publication FEIS for the City's final review. This document will address the City's comments on the 2nd FEIS, include the final list of mitigation measures, and, as appropriate, provide references to the final mitigation measures. We assume that the City's comments on the For-publication FEIS will be minimal/edit level (i.e. limited to very minor corrections and clarifications). Quendall Terminals Mixed-use Redevelopment 1 Phase 3C- Complete&Issue FEIS & Mitigation Document Contract Amendment • Task 2: Coordinate printing and CD production of the published FEIS. We assume preparation of 25 hardcopies of a one-volume, approximately 600-page document, and 46 CDs. We will also assist the City in placing the FEIS on their website. • Task 3: Prepare the 15t Preliminary Draft Mitigation Document for review and comment by the City and Century. • Task 4: Revise the Preliminary Draft Mitigation Document based on comments received, and prepare a 2nd Preliminary Draft Mitigation Document for the City's and Century's review. • Task 5: Revise the Draft Mitigation Document based on comments received, and prepare a For-publication Mitigation Document for the City's final review. We assume that the City's comments on the For-publication Mitigation Document will be minimal/edit level (i.e. limited to very minor corrections and clarifications). • Task 6: Coordinate printing and CD preparation of the Mitigation Document. We assume preparation of 25 hardcopies of a one-volume, approximately 35-page document, and 46 CDs. We will also assist the City in placing the Mitigation Document on their website. • Task 7: Meetings. Participate in up to two (2) additional, up to 2-hour meetings with the City and Century associated with the FEIS and Mitigation Document. • Task 8: Coordinate and communicate with the City, Century, and EA's technical team via telephone and email throughout Phase 3B. Budget Based on the above Scope of Work, we will need an adjustment of $10,415 to our Phase 3B — Prepare and Issue FEIS and Mitigation Document budget (see the budget breakdown below). We propose to continue to provide services on an hourly basis during Phase 3B according to our current Fee Schedule (see Attachment A). We will bill you for labor and expenses on a monthly basis. Professional Labor Hours Hourly Rate Total R. Schipanski 2 200 400 G. Brunner 26 165 4,290 J. Ding 52 100 5,200 Administration 5 55 275 Subtotal 10,165 Reimbursable Expenses (including additional mileage, copying, Subtotal 250 printing, etc.) Total $10,415 Quendall Terminal EIS 2 Phase 3B—Prepare & Issue FEIS & Mitigation Agreement, Contract Amendment Schedule If the Quendall Terminals mitigation measures list is finalized in early December, EA will submit the For-publication FEIS and Draft Mitigation Document to the City and Century by late- December. Publication of the FEIS and Mitigation Document could occur in February, assuming minimal comments from the City and Century on these two documents. If there are substantial delays in the schedule that are beyond the control of EA, further adjustments to our Scope of Work and Budget could be necessary. All of the terms and conditions specified in our Phase 3B Contract with the City still pertain unless modified herein. If the Scope of Work and Budget in this proposed contract amendment are acceptable to the City and Century, please proceed with authorizing this adjustment. We are prepared to continue with our Phase 3B services upon your authorization. Please call either of us if you have any questions. Sincerely, EA Engineering, Science, and Technology, Inc. Rich Schipanski Gretchen Brunner Manager, Planning, and Environmental Review Senior Planner Quendall Terminal EIS 3 Phase 3B-Prepare&Issue FEIS & Mitigation Agreement, Contract Amendment ATTACHMENT A EA Engineering, Science, and Technology, Inc. 2014 Billing Rates R. Schipanski Manager, Planning & Environmental Review 200 T. McCann Senior Planner 195 G. Brunner Senior Planner 165 K. Swenson Senior Planner 145 M. Sarlitto Senior Planner 135 J. Ding Planner 100 K. Hollinger Planner 90 K. Cherney-Chipman Planner 70 J. Weitz Administrative 55 Other Rates Auto mileage, per mile $0.55 In-house photo copies, per page $0.15 Handling charge on subcontractors and expenses 10% Rates are good through September 2014. Quendall Terminal EIS 4 Phase 3B-Prepare &Issue FEIS & Mitigation Agreement, Contract Amendment