HomeMy WebLinkAboutCO 4 • • CAG-12-091, CO #4-13 CHANGE ORDER # 4 (NON-FAA ELIGIBLE) AIRPORT.•Renton Municipal Airport DATE:6-05-13 LOCATION:Renton,Washington GRANT#:3-53-0055-023 CONTRACTOR:ICON Materials This change order was prepared in accordance with FAA Program Guidance Letter 12-03.A price analysis was prepared and it is recommended that the FAA accept the analysis as evidence of cost reasonableness. You are requested to perform the following described work upon receipt of an approved copy of this document or as directed by the Engineer: Item# Description Unit Unit quantity Amount Price Temporary Threshold Lighting for North 1 Bridge Replacement L.S. $9,786.00 1 $9,786.00 Subtotal $9,786.00 State Sales Tax(9.5%) $929.67 This Change Order Total $10,715.67 Previous Change Order Amount $48,807.12 Original Contract Amount $2.364.463.61 Revised Contract Total $2,423,986.40 Recommended by., Date: Eng eer, Reid Middleton, Inc. Approved by: (� `7 3 Date: Owner, ty Of enton Accepted by: Date: v 3 4�,rtrpctor, ICO ateria Accepted by.• Date: Fed ral Aviation Administration H:00023Ap1101007 Renton rw a&SignageMo„fn Taxiway Const\Change Orders\CO 4.docx I CHANGE ORDER# 4 (NON-FAA ELIGIBLE) AIP PROJECT NO. 3-53-0055-023 - AIRPORT Renton Municipal Airport LOCATION Renton, WA JUSTIFICATION FOR CHANGE This justification for change was prepared in accordance with FAA Program Guidance Letter 12-03 1. Brief description of the proposed contract change(s) and locations(s). This change order consists of the following: Installation of 12 temporary threshold lights and modification of 6 existing edge lights to serve as temporary threshold lights for the North Bridge Replacement including: - Provide and installation of base cans - Provide and install new 5kV cable and splice kits - Install Airport provided threshold lights - Provide and install threshold lens - Equipment and labor - Site restoration including soil disposal and removal of excess materials - Allowable contractor mark-up 2. Reason(s) for the change(s) (Continue on reverse if necessary). Temporary Threshold Lighting The imminent nature of the North Bridge project requires installation of 18 threshold lights for continued airport operations. The Electrical subcontractor is on-site and is familiar with the specific airfield lighting systems. The Electrical subcontractor is able to accelerate installation by rapid acquisition of the necessary parts, and able to reduce construction costs through the use of taxiway light fixtures salvaged from the edge light system demolition. 3. Justifications for unit prices or total cost: Justification was prepared in accordance with FAA program guidance letter 12-03. 4. The sponsor's share of this cost is available from:Port Funds 5. If this is a supplemental agreement involving more than $2,000, is the cost estimate based on the latest wage rate decision? Yes No NA X 6. Has consent of surety been obtained? Yes Not Necessary X 7. Will this change affect the insurance coverage? Yes No X 8. If yes, will the policies be extended? Yes No X 9. Has this Change Order been discussed with FAA Officials? Yes X No When 06/05/13 With Whom Peter Doyle H 00CQ3APt1M0r7 Renton rw 8 Signagel'Nodh Taxiway Const\Change Orders\CO 4.docx EMMU 1CON Materials 1508'Valentine Ave.SE Pacific WA 98047 2fl: 5'75-3ZOO 0 Fax 20 575-031 1�''4� 0&0 c � � � www.teon.materials.com QU 3R E OEIMdL4N!•IA�Yi6 COE7lt1HC8� Cost Detail with Categories Project Name: Taxiway B System Rehabilitation Customer: City Of Renton Sob Number: 512309 Billing Address: 3555 NE 2ND STREET Bid As: PRIME Renton,WA 98056 Estimator: David Gent Phone: 425-430-7400 Project Address: Renton Municipal Airport, Renton,WA Contact: Completion Date: Unit Total Desc7tion Quantity UM Direct Cost Direct Cost Unit Price Total Price MU% 904-Codvico 1.00 LS $8,737.50 $8,7 37.50 $9,786.00 $9,786.00 12.00% mporary Thting For North Bridge Replacement UWE Equipment Material Subcontracted Trucking Miscellaneous PW9 ET $0.00 $0.00 $0.00 $8,737.50 $0.00 $0.00 $0,00 $0.00 $0.00 $0.00 $8,737.50 $0.00 $0.00 $0.00 CEC-5/31/2013 9:06 AM:Allowable M/U on Subcontracted work 12%=$1,048.50 0 Temporary Threshold Lighting 1.00 LS $8,737.50 $8,737.50 JobCostaD: For North Bridge Replacement 5131/2013 9:10:12 AM Page i of 2 1 s Wam Percent of Percent of Amount Direct Cost Amount Indirect Cost Labor. $0.00 0.00% 7MLabor: $0.00 0.00% Equipment Owned: $0.00 0.00% Equipment Owned: $0.00 0.00% Equipment Rented: $0.00 0.00% Equipment Rented: $0.00 0.00% Materials Owned: $0.00 0.00% Materials Owned: $0.00 0.00% Materials Purchased: $0.00 0.00% Materials Purchased: $0.00 0.000/0 Subcontracted: $8,737.50 100.00% Subcontracted: $0.00 0.000/0 Trucking Owned: $0.00 0.00% Trucking Owned: $0.00 0.00% Trucking Hired: $0.00 0.00% Trucking Hired: $0.00 0.00% Miscellaneous: $0.00 0.00% Miscellaneous: $0.00 0.00% Plug: $0.00 0.00% Plug: $0.00 0.00% Direct Cost: $8,737.50 Indirect Cost: $0.00 Percent of Amount Bid Price Total Direct Cost: $8,737.50 89.29% Total DC Adds/Cuts: $0.00 0.00% Total Indirect Cost: $0.00 0.00% Total Bond: $0.00 0.00% Total Overall Cost: $8,737.50 89.29% Total Overhead: $0.00 0.00% Total Profit: $1,048.50 10.71% Total Margin: $1,048.50 10.71% Total Bid Price: $9,786.00 5/31/2013 9:10:12 AM Taxiway 8 System Rehabilitation Page 2 of 2 2812 N. Pittsburg Phone: (509) 536.1875 Spokane WA 99207 Fax (509)534-3551 Date: May 30 , 2013 To: Icon Materials Attention: Chuck Coffey Reference: City of Renton Taxiway B System Rehabilitation Subject: Design Directive# Change Order#7 18 EA Temporary Threshold Lights $ 8737.50 Total $ .8737.50 Excludes: 1.) Tax 2.) Threshold Lights 18 ea. 3.) Site Restoration 4.) Removal of installation of lights and assoc.equipment. Contract Time Extension: Colvico Inc. will require a 0 calendar day extension to the contract. If you have any questions regarding the above information,please feel free to contact me immediately. Respectfully submitted, Gre g McBride I Estimator/Project Manager i Colvico Inc. Email: gmcbride @colvicoinc.com PH: 509-201-0232 i Washington Contractor's License: COLVII*134D6 JOB NAME:CITY OF RENTON TAXIWAY B REHABILITATION CO #7 Change Proposal Request#7 18 ea. Tem ora Threshold lights ITEM QTY. UNIT PR. EXT. PR. LAB UNIT EXT. LAB 0 $ - $ - 0 0 EXCAVATION 12" X 12" 240 $ 5.00 $ 1,200.00 0.05 12 EXPORT SPOILS YDS 1 $ 6.00 $ 6.00 0.2 0.2 12" CAN EXTENSIONS 12 $ 25.00 $ 300.00 0.5 6 #8 5KV CABLE 6 X75' 450 $ — 1.15 $ 5_17.50 0 0 #8 SPLICE KITS 24 - $ 16.35 $ 392.40 0.2 4.8 THRESHOLD LIGHTS 18 $ - $ - 0.5 9 THRESHOLD LENS 18 $ 63.95 $ 1,151.10 0.3 5.4 $ - a a MISC. 1 $ 50.00 $ 50.00 0 0 0 $ - $ - 0 0 . ,0 -$ _ $ _ 0 0 0 $ $ EQUIPMENT 0 $ - $__ - _ 0 0 BACKHOE _ 1 $ 247.86 $----247.86- 247.86_ 0 0 DUMP TRUCK 0 $ - $ - 0 _ 0 314 TON PICK-UP 4X4 1 $ 98.61 $ 98.61 0 0 - 0 $ - $ - 0 0 — - -- 0 $ _ $ 0- -...0 0 01 0 -$ - $ - 0 0 _ ---- MATERIAL TOTALS — _ $_3,963.4_7_ _ _ 0 LABOR TOTAL HOURS 0 37.4 LABOR $ PER H_ OUR 75 LABOR TOTAL $ 2,805.00 QUOTES -- TESTING - MOBILIZATION $ - GARBAGE HAULOFF STORAGE PER DIEM PERMIT TAX SUB TOTALS $ 6,768.47 Overhead 12% $ 812.22 Sub total $ 7,580.69 Profit 13% $ 985.49 JOB TOTAL $ 8,566.18 BID BOND 2% —— $ 171.32 -- Job Total - $ 8,737.50 i I Renton Airport Change Order Cost Analysis/Backup for Taxiway B System Rehabilitation—North Portion Reconstruction and Airfield Signage Modifications Change Order#4(Non-FAA Eligible) This cost analysis is prepared in compliance with Program Guidance Letter 12-03. Comparative costs have been taken from bid prices for other projects,from construction cost guides and from quotes from suppliers. The quantities to complete each of the activities listed below are small in comparison to the quantities for a typical project,therefore unit prices for the items listed will be higher than expected for a large quantity. 1) Temporary Threshold Lighting for North Bridge Replacement This activity consists of the following tasks. • Excavation and Haul The excavation and hauling(exporting)of spoils is the equivalent of the WSDOT bid item Structure Excavation Class B Incl. Haul. From the Unit Bid Analysis WSDOT web site for this item and for small quantities, unit bid prices ranged from $1.00 to$500.00 per cubic yard (CY). Using engineering judgment, both of these values are outliers and the practical range for unit bid prices ranges from $21.50 to$300. For the estimated quantity of 10 CY,the cost for Excavation and Export can be expected to range from $200 to$3,000. • 12-Inch Can Extensions Provide and install 12-inch Base Can extensions for mounting of the temporary threshold lights. The contractor's unit price of$25 per unit is within the industry standard for this item of work. For the estimated total quantity of 12 each,the cost for the Base Can Extensions is$300. • SkV Cable and Splice Kits Provide and install approximately 450 LF of cable and 24 splice kits. The contractor's unit prices of$1.15 per LF of cable and $16.35 per each for splice kits are within the industry standard for this item of work. For the estimated quantity of 450 LF of cable and with splices,the cost is$909.90. • Threshold Lights Install 18 Airport provided threshold light fixtures. For the element of work,there is not cost for materials. • Threshold Lens " Provide and install 18 threshold lenses. The contractor's unit prices of$63.95 per each is within the industry standard for this item of work. For the quantity of 18 Each of threshold lenses,the cost is$1,151.10. • .Labor The labor effort matches the contractor's effort to accomplish this task. The labor rate of$75 closely matches the labor rate of$77.91 from the 2012 Friday Harbor Airport project. • Equipment Equipment rates were established using the 2003/2004 NECA Tool and Equipment Schedule. On-site durations match field observations. Equipment total charge of$346.47 is lower than the billing rates from the February 2013 NECA rates schedule. Temporary Threshold Lighting change order price from ICON Materials $10,715.67 Conclusion: The requested change order amount is a fair and reasonable estimate for completion of the Temporary Threshold Lighting system. H:doc/23ap/10/007 Renton TW B&Signage/'North Taxiway Constr/Change Orders/Renton CO#4 Cost Justification.doc.mjc