Loading...
HomeMy WebLinkAboutCO 2 CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 12-106 Sanitary Sewer Rehabilitation 2012 and C.O.# 2 Lake Washington Blvd Pipe Rehabilitation CONTRACTOR: Insituform Technologies, Inc. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work performed in 2013 calendar year as outlined below: ITEM Additional Quantities Under This Change Order Unit Quantity Unit Price Total Price SCHEDULE A A13. NEW ITEM:Additional Costs to Install 6"CIPP liner in Sewers that were originally LS 1 $9,289.48 $9,289.48 shown on plans to be 8". (Insituform Technologies,Inc.Request for Change Order#1 dated 11412013) SCHEDULE B 1310. NEW ITEM:Additional work to Clean and CCTV Inspect 24"Storm Culvert LS 1 $165.00 $165.00 located at Taylor PI NW and Lind Ave NW. (Insituform Technologies, Inc.Request for Change#3 Dated 214 12013) 1311. NEW ITEM:Additional work to install 24"CIPP in Storm Culvert LS 1 $36,055.86 $36,055.86 located at Taylor PI NW and Lind Ave NW. (Insituform Technologies,Inc.Request for Change#5 Dated 2113 12013) 1312. NEW ITEM:Asphalt Road Restoration cost associated with 12"Culvert LS 1 $39,310.84 $40,482.50 replacement performed under item B09 in Change Order No. 1 work performed in 2013 Sub Total Schedule A $9,289.48 Sales Tax (9.5%) $882.50 Total Schedule A $10,171.98 Sub Total Schedule B $76,703.36 Total Schedule A&B $86,875.34 ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET CHANGE ESTIMATED CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE $247,327.03 $302,794.80 $86,875.34 $389,670.14 SIGNATURES: f,2, J � May 7, 2013 Contractor: Date: Denise Carrrol , on ing an ttesting icer Project Engineer: 4 Date: A11W 20i3 Approved By: Date: MA+ VO Z49i-3 Utilitie em Direc or) H:FileSys\W WP-Wastewater\W WP-27-3624&SWP-27-3618\CO-2-Sanitary Sewer Rehab 2012 and Lk Wash Pipe Rehab/JDH