Loading...
HomeMy WebLinkAboutCO 3 CITY OF RENTON Community Services Department CONTRACT CHANGE ORDER AGREEMENT IV33/2022 CONTRACT: City of Renton CAG-12-143 CONTRACTOR: Native Green landscapes CHANGE ORDER: No.3 SUMMARY OF PROPOSED CHANGE: Reason/Justification: 1. Revisions to plan;owner requests Contract Change: 1. Irrigation credit;irrigation add;gravel fill;tree felling(see attached) DESCRIPTION: Item Qty. Description Unit Price Amount No. w/WSST 1 1 Irrigation;gravel;tree felling ($215.00) ($235.43) Total this Change Order. ($2'5. 3) ORIGINAL CONTRACT CURRENTCONTRACT NETCHANGE REVISED CONTRACT AMOUNT(W/WSST) AMOUNT THIS ORDER(W/1NSST) I TOTAL AFTER CHANGE $ 152,506.25 $181,770.13 ($235.43) $181,534.70 Additional Calendar Days: None All other conditions of the original contract are a part of this change order.The payments and/or additional time specified and agreed to in this change order include every claim by the contractor for any extra payment or extension of time with respect to the work described herein,including delays to the overall project.The work covered by this change order must be performed under the same terms and conditions as at included in the original contract. SIGNATURES- Contractor: / '► LQi LZ Date: LCIZ Project Manager: Date 2 ✓� ���-. 1 L Approved By: al �- �- Date: (Community Services Administrator) P.O.Box 4109 N �• ,, Bellevue,WA 9800g at� �e _Green e- Office-425.481.6889 LANDSLAPS g n _ Fax-253-735-7841 Cell-253.334.4005 Design. Install.Maintain 12/29/2012 Change order/Credit request City of Renton May Creek Trail project: Credit for irrigation rework, for the subtraction of Alternate zones 1&2 Credit: 3001ft 1 1/2" sched 40 pipe @ $.47 per $141 700 lft 1" sched 40 pipe @ $.29 per $203 82ct 1804 heads @ $.99 ea $81.18 82 nozzles @$2.41 ea $197 2ct 1"valves inc tbos pressure reducers $152 2/3 day labor $300 Total: $1,075 Add: Additional 4 strands of wire for future zones $120 Additional gravel fill, est 2 yards, for signage $180 Three man hours for sleeve dig out &locate $45 ea $135 Four man hours for tree felling and clean up @ $45 ea $180 Add 1.5"master valve with DC solenoid inc labor $245 Total: $860 Grand Total credit: $215.00 This change order will be added/credited to the total project on your approval. Thank you,