Loading...
HomeMy WebLinkAboutCO 30 J CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 12 -150 2012 Sewer Telemetry Upgrades C.O.# 3 CONTRACTOR: Systems Interface, Inc. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: Additional Items Under This Change Order Unit Quantity Unit Price Total Price ITEM 013: Relocate Hazen Radio Repeater LS 1 $5,378.03 $5,378.03 Additional work necessary to relocate the radio repeater panel at the Hazen Reservoir Site to improve safety for maintenance access per Change Order Request SII -3a. ITEM 014: East Renton Lift Station Credit LS 1 ($1,110.00) ($1,110.00) During this project, the East Renton Lift Station was taken off line. The contractor had already purchased hardware and begun prepwork to upgrade the site when the City abandoned the station. The City is being credited for work not performed pertaining to that site and the parts delivered to the City as spares. Total Change Order #3 Sales Tax (9.5 %) Total Additional Work $4,268.03 $405.46 $4,673.49 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE THIS ORDER ESTIMATED CONTRACT TOTAL AFTER CHANGE $299,924.49 $308,849.69 $4,673.49 $313,523.18 SIGNATURES: Contractor: Project Engineer: Approved By: fL.o) e0X' S4140WAelk System Director) H:FileSys \W W P- Wastewater \W W P -27- 3656 \CO -3 -2012 sewer telem.doc /MB Date: 10111/U13 Date: i GIZ 5-�i-7 Date: