HomeMy WebLinkAboutCO 1CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 12 -150 2012 Sewer Telemetry Upgrades C.O.# 1 CONTRACTOR: Systems Interface, Inc. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: Additional Items Under This Change Order Unit Quantity Unit Price Total Price ITEM 011: Change Order #1 LS 1 $7,556.22 $7,556.22 Additional work necessary at eight stations to install the upgrade radio components due to lack of available space in the existing telemetry panels as described in attached Change Order Request S11 -1 a. Total ITEM 011 Sales Tax (9.5 %) Total Additional Work $7,556.22 $717.84 $8,274.06 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE THIS ORDER ESTIMATED CONTRACT TOTAL AFTER CHANGE $299,924.49 $299,924.49 $8,274.06 $308,198.55 SIGNATURES: Contractor: Project Engine Approved By: F -- H:Fl[eSys%W W P- Wastewater\W W P- 27- 3656%CO -1 -2012 sewer telem.doc 1MB Date: q(2-s- Z- ) Date: T-/Z / /Z-C "J Date: G �� Purchase Order No: Contract Change Order No: SII -1 a Customer: City of Renton Date Issued: 4/22 /2013 Project Name: Telemetry System Upgrades SII Project No: S121_01 C :\Documents and SetlingsWbenoit\Local Settings \Temporary Reason for Change: At eight lift stations, there is not enough available space within the existing telemetry panels to add the larger radio, power supply, communications gateway, and other miscellaneous components. We propose to ugrade these sites by adding a small (16 "x16 "x8 ") external enclosure to house these the components which will not fit. At these six sites a new, 16 "x1 4 "x8" fiberglass telemetry panel will be built , installed, and wired: Baxter, Devil's Elbow, Kensington, Lake Washington Flush, Long, and Stonegate. At these two sites anew, 16 "x1 6 "x8" stainless steel telemetry panel will be built, installed, and wired: Lake Washington Beach and New backpans will also be provided for temporary installations at two sites: East Renton and Lind. At each of the eight sites with new panels, the following items will be needed: 4 feet of unistrut ($20), four to six conduit/ pipe clamps ($20), mounting bolts, nuts, washers ($5), conduit LBs, junctions, and covers ($10), conduit ($10), additional wire ($10), Additional scope of work includes creating electrical schematics, panel layout drawings, purchase orders, Hardware Design Submittals, wire label databases, UL listing documentation, along with the change control revision logs for each of these items. Our engineers and managers also need to review the requested changes, understand the implications, archive the revisions as a new Summary Material and Expenses $2,485.40 6x Fiberglass panels, 2x stainless panels, 10x backpans, wire duct, bonding, freight, etc. Project Manager $172.50 1.5 hrs to research, revise our scope of work, process the change order, & manage changes. Project Engineer $784.00 8 tours to create design drawings, BOM, POs, & project docs for 8x new panels CAD $450.00 6 hrs to create drawing sets for 8 new control panels. Admin $120.00 2 hrs to process and document the change, issue as-built revisions Shop / Field Wire Tech $1,800.00 24 hrs to build the 8 new panels (3 hrs each) In our shop Field Wiring Credit 42,108.64 16 hrs credit for original time to field- install these devices into existing panels Electrical Sub - Material $690.00 8 sites x $75 (+ markup) for Unistrut, Conduit, Wire, Fittings, Mounting Hardware, & misc. compor Electrical Sub -Labor $3,162.96 8 sites x 3 hrs avg per site to install, run conduit, & additional field wiring to these panels Total $7,556.22 (Note that this pricing averages to -$900 for each of the 8 new panels). Cost of This Change: Plus(Minus) $7,556.22 EXCLUDING SALES TAX Total of Previous Changes: $0.00 Original Purchase Order Value: $273,903.64 EXCLUDING SALES TAX Current Purchase Order Value: $281,459.66 EXCLUDING SALES TAX prova s Systems Interface I»c. Robert H. Schommer, P.E. fttk____ 04/19/2013 Name Print Signature Date Purchaser Authorized Representative Name Print Signature Date Revision: G 6/13/02 CNGAWALS