HomeMy WebLinkAboutCO 18 CAG-12-021, CO #18-14 C.O.#18 CITY OF RENTON Page 1 of 1 Public Works Department CHANGE ORDER NO. 18 CONTRACT CHANGE ORDER AGREEMENT CONTRACT: South Lake WA Roadway Improvements(Garden Ave.Widening) CAG-12-021 CONTRACTOR: ICON Materials DATE: September 22,2014 SUMMARY OF PROPOSED CHANGE: Reason/Justification: It was determined that a change in mast arm mounted vehicle signal heads,from Type L to Type M,is required on all mast arm mounted vehicle signal heads at the Lake WA Blvd/Garden Ave N/N Park Dr/Logan Ave N intersection to maintain a minimum vertical clearance of 16.5'.This change order establishes payment under lump sum for the Contractor to furnish and install Type M mast arm mounted vehicle signal heads and back plates.See response to RFI#41. Contract Change: On Drawing No.27,SIGNAL HEAD ASSIGNMENT NOTE#1,change TYPE"L"to TYPE"M".This work is to be performed on a lump sum basis including all material(including back plates),labor,equipment and coordination to complete the work. Two additional working days are requested to complete this work.The unit price and amount include the prime Contractor's 12% markup. Add the following bid items and quantities to the schedule of prices. Approx Item No. Qty Units Description Unit Price Amount 113A 1 LS Type M Traffic Signal Heads $7,987.90 $7,987.90 Washington State Sales Tax(9.5%): $758.85 Total this Change Order(Subtotal Plus Sales Tax): $8,746.75 2 Additional Working Days are Granted to complete this work All work,materials and measurement to be in accordance with the provisions of the Standard Specifications and Special Provisions for the type of construction involved. ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATE NET CHANGE ESTIMATED CONTRACT AMOUNT AMOUNT THIS ORDER TOTAL AFTER CHANGE $1,968,690.65 $2,114,962.28 $8,746.75 $2,123,709.03 SIGNATURES: Contractor: / Date: Project Manager: _/�//,�}/ r7 Date: //Z 3/2-6/ Approved By: Date: (Transportation Design Supervisor) - _ \TS-01 Alibi I 1 N _,_.._5-.7,- 44,,,,,;_ , ---hwan . .,, , ,,. . January 25,2013 Darci Morris ICON Materials 1508 Valentine Ave SE Pacific, WA 98047 City of Renton Contract: CAG 12-021 Project: South Lake Wash. Roadway Improvements(Garden Avenue Widening) Serial Letter No.: 237-033 Subject: Request for Change—Signal Mount Brackets& Backplates Dear Darci, After careful review of the plans and specifications, it has been determined that the mounting hardware for the traffic signal heads is wrong. The signal detail chart indicates the mounting style and that is how our supplier provided the signal head mounts. The traffic signal heads have been built at our shop and are being stored there. In order to make the revision as requested by the City of Renton,we will have to purchase new mountings, and back plates to fit the new mounting style. Once we are able to pick up these parts we will take the signal heads apart and install the new signal mounting hardware. I would like to remind everyone, it takes approximately 4 to 6 weeks to procure the material from the manufacturer. Our lump sum cost proposal is set at$9,869.17. Please see the attached breakdown. I am requesting an additional two days be added to the contract beyond those already requested to complete our work for this change. We await your written direction before proceeding. This proposal is based solely on the usual cost elements such as labor, material and normal markups and does not include any amount for changes in the sequence of work,delays, disruptions,rescheduling,extended overhead,acceleration and/or impact costs. We expressly reserve our right to make claim for any and all of the aforementioned items or other items associated with this change prior to any final settlement of this contract. If you have any questions, please feel free to contact me at your earliest convenience. Sincerely, Transpo ation Systems,Inc (—) Bryson - Bryson Huie,P.E Transportation Systems,Inc 3218 142nd Ave E, Sumner,WA 98390 Phone (206) 259-9804. Fax(253) 863-9626 Washington&Oregon Licensed General Contractor ID# TRANSSI923BP- Electrical Contractor ID#TRANSSI927NO- UBI# 602-726-209 TRANSPORTATION SYSTEMS, Inc CHANGE REQUEST PROJECT NAME :South Lake Washfasten Roadway Improvements TRANSPORTATION SYSTEMS it:223 REQUEST FOR CHANGE :004 DATE 2115113 RFP @: Signal Hood Raman&Height Changan Revise Signal Head Wanting Styles and 5aok Plates.Mounts b91Maen lop and middle signal head section. UNIT DESCRWTION LABOR MATERIAL EQUIPMENT 51119CONTRACTOR 14 3 Sesta,Backplates 0.75 10.50 $ - 3 4 Section BodElses 0.75 2.25 14 Type M Mounting Hsloare 1.50 21.00 14 Remove Type L Mounting Hardware 0.75 10.50 14 RomoreBackplMea 075 10.50 ,lgSZ !,9S2 I M♦eedsl Costa-HNoian systems $ 14aleae- S 401ae0 4 Pk#p Madams From Nester Systems 1.00 400 5 3200 $ 120.00 55.75 _S. 8:99—' $ 126.00 5 - HOURS MULTIPLIED BY BURDENED RATE $72.19 $4,241.16 !' Sz MARK UP APPLIED TO LABOR 29.00% 51229.94 TOTAL MATERIAL $604eee-/9 5 Z •6oao Is good for 15 dogs MARK UP APPLIED TO MATERIAL 2100% Setts- '1.047,9Z 'TNS propose Is based society on me usual cosi elements such as moor.IA0tmle TOTAL EQUIPMENT $120.50 and normal markups and does not Include any amount for changes In Sae st some MARK UP APPLIED TO EQUIPMENT 21.00% $2520 at work,delays.dlompeau&rescheduling.*Mended overhead,aoMera4on ander Impact costs,and ane right Is expressly reserved to rake dem tet soy and as of these TOTAL SUBCONTRACTOR $0.00 reared nems of cc/0910r l0 any anal sealmnsd of pis contact. MARK UP APPLIED TO SUBCONTRACTOR 720% $0.00 SUB TOTAL $9,557.27 r^ USE TAX APPLIED TO MATERIAL&EQUIPMENT AT 9.60% *040I' Icy, `'8 Sub-TOTAL OF CHANGE REQUEST *N9.4T- Monday,February 18,2013 4:07:54 PM Pacific Standard Time Subject: RE:Renton Lake Wash Blvd Project Date: Monday,February 4,2013 5:15:17 PM Pacific Standard Time From: Jocelyn DeFord To: 'Bryson Hui& For(11)3 section backplates,(2)4section backplates and (14)type M mount it will cost$3,249.00 I will send a quote sheet this evening or tomorrow morning! Thank you, Jocelyn DeFord From: Bryson Huie[mailto:bryson@transportationsystemsinc.com] Sent: Monday, February 04, 2013 12:01 PM To: Jocelyn DeFord Cc: Bias Bustamante Subject: Renton Lake Wash Blvd Project Jocelyn, The City of Renton is changing the mounts for the traffic signal heads on the lake Wa Blvd Project—our Job#223. They would like to change them to type M mounts. Can you give me pricing for the signal heads for the M Mounts and back plates for this project. I need the prices asap. I only have 7 days to respond. Thanks, Bryson Huie f' 206-510-6533 Cell 253-863-9626 Fax 206-259-9804 Office Page 1 of 1 Invoice Page: 1 Ostern Systems,Inc 909 SE Everett Mall Way,Ste.#A120 Invoice No: 0000023574 Everett,WA 98208 USA Order No: 0000009437 Invoice Date: 5/24/2013 Sold To Ship Co Transportation Systems,Inc Transportation Systems,Inc Accts Payable 3218 142nd Ave E 3218 142nd Avenue East Sumner,WA 98390 USA Sumner,WA 98390 USA • F.OB Ship Via Customer PO No FOB Destination Best Way 223-002 C/O#3 Order Date Terms Mark •04/29/2013 Net 30 Days PO 223-002 CIO#3 Part Number Qt.'Ordered Units Qty Shipped Qty BO Price Ext.Price 7023170220 15.00 Each 15.00 0.00 108.15 1,622.25 ELEVATOR PLUMBIZER MOUNTING TYPE M)Y3L 7079950212 15.00 Each 15.00 0.00 5.31 79.65 BATTEN PLATE 12 9999120100 1.00 Each 1.00 0.00 125.10 125.10 ANODIZE BATTEN PLATE 12" Lot Charge 9999100033 1.00 Each 1.00 0.00 125.00 125.00 POWDER COAT BATTEN PLATE 1 SIDE ONLY SPECIAL INSTRUCTIONS: 1)BATTEN PLATES SHALL BE BLACK ANODIZED ON 1 SIDE AND YELLOW ON THE OTHER LAST ITEM Sales Total 1,952.00 Renton:S Lake WA Rdwy Improv Garden Ave Widening Shipping&Handling 0.00 Tax Total 0.00 Trade Discount 0.00 Less Paid Amount 0.00 Contact: Blas Bustamante Total 1,952.00 ICON Materials REQUEST FOR INFORMATION 1508 Valentine Ave.SE No. 00041 ICON Pacific,WA 98047 Phone: 425-252-7700 = �b u•� Fax: 206-736-6026 TITLE: Signal Head Mounting Type DATE: 1/25/2013 PROJECT:South Lake Washington Roadway Improv JOB: TO: Attn: Kurt Ahrensfeld REQUIRED: 2/1/2013 Perteet Inc. 2707 Colby Ave, Ste 900 Everett, WA 98201 RECEIVED Phone: 425-252-7700 By Kurt Ahrensfeld at 11:21 am, Jan 26, 2013 Please see the attached RFI from TSI for your review and response. APPROVED By Kurt Ahrensfeld at 2:59 pm, Jan 31, 2013 Requested By:ICON Materials Date: 1/25/2013 Signed: Darci Morris Page I of I r Request For information RFI# 20 Date: 1-25-13 Project Name: South Lake Wash Rdwy Improv General Contractor: ICON Plan Reference# 27 &30 Spec.Reference# Signals Impact to Schedule Li, yes❑No Impact to Cost LI yes ❑No Information Required: Please reference sheet 27, Notes under the Signal Head Assignment#1. This describes what style mouting hardware is to be used for the traffic signal heads. Our suppiler supplied all type"L"mounts as prescribed. The traffic signal detail chart on sheet 30 indicates the height of the mast arms from the ground. My question is"will there be enough clearance between the signal heads and the roadway once we install the signal heads"? The signal heads measure with the back plates for your information the 4 section signal heads measure 5'6"and the 3 section signal heads measure 4'4". Then add 6 inches for the"L"mount and the signal heads are from 6'6"to 4'10"tall. The simplex of the poles range from 16.5 feet to 19 feet. The minumum clearance is 16-6" per sheet 30. Please verify if we have the proper clearance prior to the installation. Please direct as how to proceed. Response: Type"M" mounts shall be used on all mast arm mounted vehicle signal heads in accordance with direction from the City.A minimum clearance of 16.5' is required in accordance with the Contract Plans. Submitted By: Bryson Huie,P.E. Transportation Systems,Inc. Transportation Systems Inc. 3218 142nd Ave E,Sumner,WA 98390 PH:206.259.9804 FX:253.863.9626 W m w O Z OO U^ Q ICS 4c, d J=as Nm ¢�o+ • '1 '. \ o w _¢rn I ti¢ a �� w O O �. ° oa p iI : pc., �� w o _ ;,-1 Y D r z o ¢ V� 0-1_ W w Iya� c� In N a �- '- z u o z .. " r . o ,o w0 ZO v Z ' o a o m v a aV8 d015 0� °'z z� �� ¢ �w i..� O i� 01 T ,OSI d' • I,. z w o z oN fr ¢w J W el T ~ ° 1 _ • .: ° I ¢g 21 avwi os oz o� Q l0 ,,,..L' Z (n¢ U W F-W U J W • I .. O m ::„_ Q O ti r W d'� Z= U F I e Z 1 N .. wl- U O Z w wr r U 8V8 d01S - • .. • I =rn �'- Lc,' o z m to-II Z I o Ol { ,OSI :: : ~¢ w= oW oozpa z o rI 6 : 6: .. Y I 3vJ �5 o wa ��owoa v¢ II I a I p I' m LY wz m wn o v QZ,Zv ®: •• d I' ¢¢00 '-m �zvwi�cwi wzw¢r� z a Z CO O U -� .. • W d(=5 .Ta 3omz o�,xa� * oi� 1- Z .o ° i, \\' ~ :: o Z I• ' <N aw �aw¢z ^000�op c'0 o \ II' .o .. z 'AFL., ¢=wz¢ ��``1-¢�Q L7,-a- -Z W Z ao 1 11. I w ¢. �oo�oz ¢¢off zo n• Cn O J I I :.:-:c W N¢- N1 .. . J02 00 CJZ OO l'`Zul oxc1 V 4J a® - .. t/) o o¢o ¢ coo-o N a• o .. W ��� Jza�o ¢WNwm��w�o W �Zn. I - • .. ° I I..• Z¢ O SOUaNfW!lMOW OppN J Q } V1 I l 11 \ I O JFr-- InI-rzN �rZY� ¢o -I Q�dl .. wU zozzJropoy1aJ pv 2Po J f nO Oti0-¢ 0¢m J W-»Z O¢ I- C) li U IEll WJZFU02 HM Z ¢wWZII o- /Qy � O0¢U~voi¢`fo��-w=w���� QQ• ° 1O • ` UO Z� F-- JW p! JJp'31NF- .. ,. � J .. . I W2F-W N2Z0�2N W w2 ¢d'2d'!L'W ° > .. ° W OO tr OO.µ2 ow 20000 ay W O - �Z ¢N¢= cc U U d W U v H?U O Q N L.,f n 1._t..V=1 �' .• .. ,^ �� F.1 1 I I W 1 til " •• N • N 3 • II M I�r Ap 1..I •. CC • _ N N I O \h.... --.....______••••••• `i• ,IMI 'u� ri //��♦�V % .14 \ Al' Ill+k4 ig) ' A 0. / ,,,. .,,,• . ),,,,,,._ _ ,\,\/11, ,,, . •.• . _ L...::4 ••. . , ),,,,,,,... -... S.. t i, ,� "vol • o et �,W�0Ni.A 8 °1 ' 1 1 ,' ����� lit � '`'`. t4 Ni �F V” ` rte,II 1 •�� a, � ♦.� M "L11� � ' v�'iQ�+N N I �:i O ` ` � � UII ' • t� '.� mn SUN °, A• �. 14 11110°° •�✓ ir� ` 4,4 ` 1� .. ! ,. ‘ \ \l,,P7# ,,*ib,' ,) 2 A, Ce Z 41 NOlON� Nan780 I l� 444 'Y HSV/IA 3pb7 ( ` 11• ,_ °'`4s �AI,-"-% ��O�y� it D M/a lslx3 \ o \ • ` N 1Z7 p ' . 1 I gills - m Wa ® ,��i;-41k 1 ` �° `lug • I M: : 4: 00 r� 3 ®19j' - I m W N il, �I1 1 d O e J p :I .,:® /� 0 d 3 4 O I 16 _ ,, ;IP:.,, \ I I w�� 1 / • N 1. I 1. 'I A S O ��� ''s---, 9 v 1401 'i ..,-- I I y • 1 1: :1 1 'I I. :1 IY:A r.. COQ /% ¢' .0 8 J IP 1 • °°� N: LII 11 ®� -'���. 4 .• 444 lj .- \I 4 4 I se-, ''. 4 irU '� Y limb._8 : I ♦ r y0. x' z • ship v ��� �' 1 .Q t��ca � ���/1' O II g O7'3 U d LL II1 4444•11 it11111V L 1,n w 0 7 r= -1', 1 1111111' I. • a- Z �.: I ..1 M -1 =2u r .T444 • 01 OriPi _ •• 4 c-6 • • ~ m Zs�, b :4* , ‘-,--: . -- c.o.,' N, R 1 ° I Nag•---m, , I el . . I , .� _ •-•07.0 o�.a o 1 �4 -4* I h ®.. 1 p W z I 44 111 1 ® ¢ ,..,Q3 N F (tel: ® w m oJ 2F Z ��Z®(D®40 NS a 8V8d01S01TOSl, ° 0�Msw�O= NFwma v m I =., vlw _..8:8„..„ In i.,' • .b S p E28-_-_,.%-9,o_, w J o¢ m a o w N N N N p U J= S W E,3,- -± IRIMROMM L.5 2¢ J N m U c. Z +..w,. .re; •^ Q ¢ . _10 • " .m. 1 O O O U.I. W M j O N Z ! J!O rO JW .. i! J (n O vJ n m • I1 1 • <¢� ,n J(�%WF-d wwow Ci) O .. a3dWflf> wMJ 3w 2pU a No Jt tWa- J •• 1 < •a w c�c.�3 Z a R- a�z Fns ¢ .(c1- 000 L Z K O t0 0 -O O �I ¢¢rn < W 2 J OL W W N d W W N-, ,=d d W W W Z Q (; .. 1 N f%1 N L.,..,- U .D-.>-Q I K 6 m U W¢J V W I N .. Q N O p a J J ce W Z d x�2¢ J*xsia c = W LL wo < z(f) <n�"m o_ at .w zo wrLac� o waac.> J LL ° °° e I N �� r� coy}` ^'3 p ¢/r m=ooJ _ o 'ff, h a rIa t p JZLLOg I �v �oi J �aa= ¢ 000 Z� 9m. Q O Z " • # Z 1 1A m.1J O Z JNN Z W O • 4 �-,p-o- 1- Z l'- I� .. > O O_0 J V1¢¢w N r`>Al p J w () O ° m ¢U O'OU ^Jz !L•N Z- W 0 -p c� 0 W 2¢\�,,{{n0 om in z• Is000 W@ _ o @ = Cl)N W W (Lr \\\\w\\\\\\\t.\\\\\\\\\\\\\\\\\\\ Z N N a �, m/yc�o s' ¢ . U a zo m " o V a 2 D •�. O "±"..,;•••1- �a o: 1"oJ N �_ I z� Z p W LL O �? J N ��I r�l o� 2 auNi ..(„Ci- �"p�p n �w�o p o W z J ¢zo¢ w po W W �o � 0 az ¢ rn ,n LL } LY J N � -"•b =SCD a,CO z�¢z= a M�-0 a w �� w W 5 _ ; 2 G =aa <az8Q N~5oz a•QQoo W = WO W Z d N (� IL- 4 N�Ow_ Q` Nam 2 _ �H tl y� �" o� a C.1 a a Z Z_ _ ow I= odf MI �ow�w ♦Y�3JiZ c7oS <zolWil Cl) e oil @ W l- QZU • o J ¢ro c'ov'- ¢ IN'ppm¢ w wjow 4 fA rL 4 LL I + - Q =`o ce_1Y aJ o ww a rn w c.) = I ONIa Z ONIa I �i 1 j ¢ m v c:' x W X LL - 16 O O O u -..,,,, J<co co a 8<a o *i.„(:,5 m 0- W W LY U O I ly I I =N oaav= m awocia � z