Loading...
HomeMy WebLinkAboutCO 07C.O. #7 CITY OF RENTON Page 1 of 1 Public Works Department CHANGE ORDER NO.7 CONTRACT CHANGE ORDER AGREEMENT CONTRACT: South Lake WA Roadway Improvements (Garden Ave. Widening) CAG -12 -021 CONTRACTOR: ICON Materials DATE: November 16, 2012 SUMMARY OF PROPOSED CHANGE: Reason /Justification: This change adding 10 working days is based on double the estimated effort necessary for utility potholing. With overhead accounted for in force account markups this is a no cost time only contract change. Contract Change: Ten working days are awarded with this change as requested by an October 3, 2012 letter from ICON Materials. Add the followino bid items and ouantities to the schedule of prices Approx Item No. I Qty Units Description Unit Price I Amount 5A 1 LS Pothole Delay $0.00 $0.00 Washington State Sales Tax (9.5 %): $0.00 Total this Change Order (Subtotal Plus Sales Tax): $0.00 10 Additional Working Days are Granted to complete this work All work, materials and measurement to be in accordance with the provisions of the Standard Specifications and Special Provisions for the type of construction involved. ORIGINAL CONTRACT CURRENT CONTRACI AMOUNT AMOUNT ESTIMATE NET CHANGE THIS ORDER ESTIMATED CONTRACT TOTAL AFTER CHANGE $1,968,690.65 $1,984,215.07 $0.00 $1,984,215.07 SIGNATURES: Date: Project Mana er: — / l/v /GL� / T Date: /Z. l�' /� ApprOVed By: %" /"�✓� Dater �/ 2.1 / ZD� Y (Transportation Design Supervisor)