HomeMy WebLinkAboutCO 2 CITY OF RENTON • Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 12-159 Wells PW-8, PW-9 & EW-3 Primary Disinfection Project C.O.# 2 .CONTRACTOR: R. L. Alia Company SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: Additional Items Under This Change Order Unit Quantity Unit Price Total Price ITEM 027: Change Order#2 Additional work necessary to repair damaged irrigation system piping LS 1 $10,640.59 $10,640.59 and components per City of Renton Parks Divison requirements. Credit for elimination of cathodic test station boxes(3 nos.). LS 1 ($1,593.75) ($1,593.75 Total ITEM 027 $9,046.84 Sales Tax(9.5%) $859.45 Total Additional Work $9,906.29 ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET CHANGE ESTIMATED CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE $874,889.67 $888,905.67 $9,906.29 $898,811.96 SIGNATURES: • Contractor: Date: 7- 7.43 Project Engineer: Date: 7- 2- -20(3 Approved By: W✓ Date: tilities System Director) H:\File S s\WTR-Drinking Water Utili t \WTR-27-Water Project Files\WTR-27-3582 Primary Disinfection Installation 2012\Contractor Pa Y ent\CO#2.doc