Loading...
HomeMy WebLinkAboutCO 1 0 CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 12-159 Wells PW-8, PW-9 & EW-3 Primary Disinfection Project C.O.# 1 CONTRACTOR: R. L. Alia Company SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: Additional Items Under This Change Order Unit Quantity Unit Price Total Price ITEM 026: Change Order#1 LS 1 $12,800.00 $12,800.00 Additional work necessary to add a second chlorine analyzer to monitor chlorine residual on the 42-inch steel pipe(pre CT-6). Replace existing 42-inch vault with 72-inch vault for access to the injection and sample taps located underground at Cedar River Park(safety upgrade). Total ITEM 026 $12,800.00 Sales Tax(9.5%) $1,216.00 Total Additional Work $14,016.00 ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET CHANGE ESTIMATED CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE $874,889.67 $874,889.67 $14,016.00 $888,905.67 SIGNATURES: \ p Contractor: V, i Date: Project Engineer: Date: -!vA`- 7 �( Approved By: _64V (ItEfX11/110. Date: o f�-�J3 (Utilities System Director) H:\File Sys\WTR-Drinking Water Utility\WTR-27-Water Project Files\WTR-27-3582 Primary Disinfection Installation 2012\Contractor Payment\CO#1.doc