HomeMy WebLinkAboutCO 1 OWNER: of Renton
CHANGE ORDER
City
.
ARCHITECT: City of Renton
CITY OF RENTON CONTRACTOR: Contech services,Inc.
Project Name: City Hall P3 Lobby Level Concrete Damage Repairs
Project Address: 1055 South Grady Way
Renton,WA 98057 Date: Jnauary 18,2013
Change order No.: One(1)
Contractor Name: Contech Services Inc.
&Address PO Box 84886 City CAG No:: CAG-12-161
Seattle,WA 98124 Contract For:
The Contract is hereby amended as follows:
Deduct two(2)drain trenches from Contract @$2,275 each Deduct -$4,550:00
Subtotal -$4,550.00
TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE ORDER........................I............... Subtract 4:550,Q0
The change order shall include all Contractor(s)labor,material,overhead,profit,and all direct and/or indirect costs
allocated with the Change in Scope of Work. Excluding Bond Premiums.
This Change Order is not valid unless signed by the Owner and Contractor
The original Contract Sum was ..................................................................................... $18,200.00
Net Change by previously authorized Change Order(s)was ............................................. $0.00
The Contract Sum prior to this Change Order was........................................................... $18,200.00
The Contract Sum will be revised by this Change Order in the amount of .......................... -$4,650.00
New Contract Subtoal $13,650.00
Washington State Sales Tax at 9.6% $1,296.76
The new Contract Sum incorporating this Change Order will be ...........:............................ $14,946.75
The Contract Time will be changed by ..........................:...................................:........... 0 days
The Substantial Completion Date Including this Change Order is ...................................... January 18,2013
OWNER CONTRACTOR
City of Renton Contech Services Inc.
Community Services Dept. PO Box 84886
1055 South Grady way Seattle, 98124
Renton,Washington 98057
Date Dat