Loading...
HomeMy WebLinkAboutCO 3 CHANGE ORDER # 3 AIRPORT:Renton Municipal Airport DATE: 11-21-13 LOCATION:Renton,Washington CONTRACTOR:R. L.Alia You are requested to perform the following described work upon receipt of an approved copy of this document or as directed by the Engineer: Item Description Unit Unit Price Quantity Amount 1 Force Account Item#7—CDF LS $2,585.54 1 $2,585.54 Force Account Item#6—Trash 2 Pump Repair LS $243.54 1 $243.54 Force Account Item#3—Oil Control 3 Tee per Directive No.3 LS $4,184.41 1 $4,184.41 Force Account Item#8—Additional 4 Asphalt Repair LS $3,822.13 1 $3,822.13 Subtotal $10,835.62 State Sales Tax(9.5%) $1,029.38 This Change Order Total $11,865.00 Previous Change Orders $38,269.60 Original Contract Amount $305.587.13 Revised Contract Total $355,721.73 Approved by _.. k Date: =Rt Owner, of Renton ` Accepted by. Pte#tM lJ L_ Contractor, RL Alia CHANGE ORDER # 3 AIP PROJECT NO. CAG 12-175 AIRPORT Renton Municipal Airport LOCATION Renton, WA JUSTIFICATION FOR CHANGE See record of negotiations attached. FBO Parking Lot Reconstruction and C-Ramp Storm Drain Repair Project CAG 12-175 Record of Negotiation Part 2, Change Order No. 3 Prepared by: Ben Dahle Date: 11/21/2013 Change Order No. 3 FA7:CDF Letter from R. L.Alia Company dated October 4, 2013; RE Added Costs—Fill Drain Pipe with CDF for $2,585.54. Discussion:See City RFP no. 1 for CDF. It was agreed in the field that this work would be paid for by force account. Unknown storm drains were found in the site. CDF was placed in abandoned storm drain site per City Stormwater comments on the plans. Action: No exception taken. FA6:Trash Pump Repair Letter from R. L. Alia Company dated October 4, 2013; RE Added Costs—Trash Pump Rapiar for$243.54. Discussion:Trash pump at the 760 site was broken and contractor repaired it. It was agreed in the field that the repair would be paid for by force account. Action: No Exception Taken FA3:Oil Control Tee, per Directive No. 3 Letter from R. L.Alia Company dated October 4, 2013; RE Added Costs—Separator Tee for$4,184.41. Discussion: Contractor installed oil control tee per directive no. 3 and paid for by force account. Installation was in response to the section review that was conducted by City to the lack of an oil water tee not identified by stormwater during first review. Action: No exception taken. FA8:Additional Asphalt Repair Letter from R. L.Alia Company dated Octoberll, 2013; RE Added Costs—Additional Asphalt Removed for$4,184.41. Discussion: Construction traffic damaged the apron. Contractor was given verbal directed to remove asphalt by force account. Action: No exception taken.