HomeMy WebLinkAboutCO 2 CAG-11-030, CO #2-11 CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: Lake Washington Blvd N. Storm&Water System Improvement Project C.O.# 2 CAG-11-030 CONTRACTOR: KC Equipment,LLC SUMMARY OF PROPOSED CHANGE: Item—Adjustment of Construction Work Days Schedule Change Only This change order item adjusts the total amount of construction work days from 80 days to 110 days. The construction end date is extended from August 19,2011 to September 30,2011. The request for additional working days is due to difficulties encountered working in groundwater and soft soils for the storm manholes and pipes,additional scope from change order#1,and delays due to unmarked dry utilities not marked by Utility Locates. CURRENT CONTRACT AMOUNT $860,608.43 Attached is the contractor's revised construction schedu SIGNATURES: Contractor: Date: Project Engineer: '+ Date: k-4 7-'a-a Approved By: A 1404A 41tif Date: '4117 Ib Lys Hornsby,Utility stems Director H:\File Sys\SWP-Surface Water Projects\SWP-27-Surface Water Projects(C1P)\27-3531 Lake Washington Blvd-Hawks Landing\1021 Corres Contractor\ChangeOrd2\110811-KCequipLLC-CO2.DOC\SL