Loading...
HomeMy WebLinkAboutAdden 4 Amok • OCAG-11-105, Adden 4-1 # 2 Washington State Department of Transportation Supplemental Agreement Organization and Address KBA, Inc. Number 4 11000 Main Street Original Agreement Number Bellevue, WA 98004 CAG-11-105 Phone: 425-455-9720 Project Number Execution Date Completion Date 011013-01 5/19/11 12/31/14 Project Title Rainier Ave S (SR 167)-Stormwater New Maximum Amount Payable Retrofit-SW 11029 $ 2,413,157.00 Description of Work Add scope of services and budget for additional construction management and inspection services to install additional Filterra Stormwater units within the project limits of the Rainier Ave S (SR 167) - S Grady Way to S 2nd St project. The Local Agency of City of Renton desires to supplement the agreement entered into with KBA Inc. and executed on 5/19/11 and identified as Agreement No. CAG-11-105 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is herebyebenged to read: revised to include: See attached Exhibit A-1 -Supplemental No. 4 II Section IV,TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: No change. III Section V, PAYMENT, shall be amended as follows: Authorized maximum amount payable shall increase by$ 75,000.00 to a new maximum amount payable of$ 2,413,157.00, as set forth in the attached Exhibit E-1-Supplement No. 4. as set feAh in the a#aehed Exhabit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. �? By. Mike Roberts,Vice President By. Denis Law, Mayor Date: c, 1 Consultant S- nature a a : t - Approving Authority Signature PAttesf: ,y���il1.l.L�• GZ.f:�t-O�"' DOT Form 140-063 EF " -;, Bonnie I.Walton,City Clerk Revised 9/2005 it • • KBA, Inc. September 14, 2012 EXHIBIT A-1 - SUPPLEMENTAL 4 SCOPE OF SERVICES for Construction Contract Management Services(CCM) - Rainier Avenue S. (SR 167), South Grady Way to South 2"d Street Contract No. CAG-11-105 By City of Renton (City) request, this Supplemental 4 Scope of Services adds additional administration and inspection services for the installation of Filterra Stormwater units within the Project limits of the Rainier Avenue Improvement Project for the purpose of cleaning the storm water runoff. The work is funded by a Washington State Department of Ecology (Ecology)grant. I. CONSTRUCTION CONTRACT MANAGEMENT SERVICES A. Consultant Contract and Team Management. Continue overall day-to-day management of the consultant contract and team as outlined in Exhibit A-1, Exhibit A-1 - Supplemental 1, and Exhibit A-1 -Supplemental 2. B. Construction Phase Services — Contract Administration (Filterra Stormwater System). Addition of the following contract administration services for the installation of the Filterra Stormwater System: 1. Liaison with the Client, construction contractor, Designer, appropriate agencies, property owners, and utilities. 2. Provide the Client with brief monthly construction progress reports for the Filterra Stormwater System, highlighting progress and advising of issues which are likely to impact cost, schedule, or quality/scope. 3. Schedule Review: a. Review construction contractor's schedules for compliance with Contract Documents. b. Monitor the construction contractor's conformance to schedule and require revised schedules when needed. Advise Client of schedule changes. c. Evaluate construction contractor's construction schedule for Filterra Stormwater System construction items. Prepare schedule review comments and submit to Ecology. 4. Prepare a Construction Quality Assurance Plan (Filterra QA Plan) as required by Ecology as referenced in Task 3b of the FY 2011 Stormwater Retrofit and LID Grant Program — Proviso Funding Agreement, attached hereto as Attachment A, to follow the needed policy and/or procedures that occur during the Project, and to orient CCM Team to the changes. Submit the Filterra QA Plan to the Client and Ecology for review. 5. Manage Submittal Process. Track and review, or cause to be reviewed by other appropriate party, work plans, shop drawings, samples, test reports, and other data submitted by the construction contractor for general conformance to the Contract Documents. 6. Record of Materials (ROM). Provide ROM indicating anticipated material approvals, material compliance documentation, and materials testing requirements. Maintain ROM compliance documentation received and advise of any known deficiencies. 7. Manage Request for Information (RFI) process. Track and review/evaluate, or cause to be reviewed/evaluated by other appropriate party, RFIs. Manage responses to RFIs. 8. Change Management. Evaluate entitlement, and prepare scope, impact, and independent estimate for change orders. Facilitate resolution of change orders. S:\Projects\Contracts\Client\Renton\011013-01-RainierAveCorridorPhll\Drafts&Negotiation Records\I n-House-Drafts\Supp-4-FilteraSystem\Supp4-KBAFilterraScope-(FI NAL- Rev1)-2012-0914.docx 1 of 4 • • KBA, Inc. September 14, 2012 9. Monthly Pay Requests. Prepare monthly requests for payment and/or review payment requests submitted by the construction contractor. Review with Client and construction contractor and recommend approval, as appropriate. Prepare cost breakdown for Client to submit to Ecology for reimbursement. . 10. Assist the Client in the investigation of malfunctions or failures during construction. 11. Prepare change orders. Negotiate, estimate, and prepare the change order documents to include the needed work to complete the installation of the Filterra Stormwater System. 12. Record Drawings. Review not less than monthly, the construction contractor's redline set of contract plans. Maintain a CCM Team set of conformed drawings tracking plan changes, location of discovered anomalies and other items, as encountered by the CCM team. Use these markups to check the progress of the contractor-prepared Record Drawings. 13. Document Control. Establish and maintain document filing and tracking systems for the Filterra Stormwater System work, following Client and Ecology guidelines and funding agency requirements. Collect, organize, and prepare documentation on the Project. a. One hard copy of files will be kept in the Project field office. b. Electronic documentation will be stored in a Project Website, using SharePoint software, managed and hosted by the Consultant. 14. Filterra Stormwater System Closeout. Prepare Stormwater Construction Completion Form for Ecology approval. Prepare final pay estimate. Deliverables for Filterra Stormwater System • Monthly Construction Progress Reports • Schedule Review Comments • As-built Schedule • Meeting Agendas and Notes • Submittal Log • ROM—Filterra Stormwater System Requirements • RFI Log • Change Order(s) • Progress Pay Requests • Stormwater Construction Completion Form and punch list(s) • Final records—hard copy and electronic C. Construction Phase Services — Field (Filterra Stormwater System). Addition of the following field services for the installation of the Filterra Stormwater System: 1. Observe the technical conduct of the construction, including providing day-to-day contact with the construction contractor, Client, utilities and other stakeholders, and monitor for adherence to the Contract Documents and Ecology guidelines. The Consultant's personnel will act in accordance with Sections 1-05.1 and 1-05.2 of the Standard Specifications. 2. Observe material, workmanship, and construction areas for compliance with the Contract Documents, Ecology guidelines, and applicable codes, and notify construction contractor of noncompliance. Advise the Client of any non-conforming work observed during site visits. 3. Prepare daily construction reports, recording the construction contractor's operations as actually observed by the Consultant; includes quantities of work placed that day, contractor's equipment and crews, and other pertinent information. 4. Interpret Contract Documents, in coordination with Designer. 5. Decide questions which may arise as to the quality and acceptability of material furnished, work performed, and rate of progress of work performed by the construction contractor. S:\Projects\Contracts\Client\Renton\011013-01-RainierAveCorridorPhll\Drafts&NegotiationRecords\In-House-Drafts\Supp4-FilteraSystem\Supp4-KBAFilterraScope-(FINAL- Rev1)-2012-0914.docx 2 of 4 0 KBA, Inc. September 14, 2012 6. Coordinate with permit holders on the Project to monitor compliance with approved permits, if applicable. 7. Prepare field records and documents to help assure the Project is administered in accordance with funding agency requirements. 8. Attend and actively participate in regular on-site meetings. 9. Take periodic digital photographs during the course of construction. Photographs to be labeled and organized as detailed in the Filterra-CCM Plan. 10. Punch List. Upon substantial completion of the Filterra Stormwater System work, coordinate with the Client and affected agencies to prepare a `punch list' of items to be completed or corrected. Coordinate final inspection with those agencies. p 9 11. Testing. Conduct or cause to be conducted, materials and laboratory tests. Coordinate the work of the Field Representative(s) and testing laboratories in the observation and testing of materials used in the construction; document and evaluate results of testing; and inform Client and construction contractor of deficiencies. Deliverables • Daily Construction Reports with Project photos—submitted on a weekly basis • Punch List, Certificate of Substantial Completion • Test Reports D. Assumptions. Addition of the following assumptions for the Filterra Stormwater System work: 1. Budget: a. Staffing levels are anticipated in accordance with the attached budget estimate. Consultant services are budgeted for a 12-month period. This is intended to span the originally planned construction duration, plus time allotted for additional inspection and closeout. b. If additional budget is needed to cover such instances as the following, Client and Consultant will negotiate a supplement to this Agreement: i. The contractor's schedule requires inspection coverage of extra crews and shifts. ii. The construction contract runs longer than the time period detailed above. iii. Any added scope tasks. c. The budget allocations shown on Exhibit G-1 Supplemental 4 are itemized to aid in Project tracking purposes only. The budget may be transferred between tasks or people, or between labor and expenses, provided the total contracted amount is not exceeded without prior authorization for work associated with the Filterra Stormwater System. d. Retain Engineer of Record for shop drawing review, RFI's, design changes, and final record drawings. e. Coordination with and enforcement of utility franchise agreements and/or contracts and schedules for services related to the Filterra Stormwater System. f. Verify that the required permits, bonds, and insurance have been obtained and submitted by the construction contractor. g. Construction Survey. Provide Project control survey and staking that is not already assigned to the construction contractor. 2. Scope: Scope assumptions remain the same for the Filterra Stormwater System work, as already outlined in the original Exhibit A-1, Exhibit A-1 - Supplemental 1, and Exhibit A-1 — Supplemental 2. S:\Projects\Contracts\Client\Renton\011013-01-RainierAveCorridorPhll\DraftsBNegotiationRecords\In-House-Drafts\Supp-4-FilteraSystem\Supp4-KBAFilterraScope-(FI NAL- Rev1)-2012-0914.docx 3 of 4 I` 0 • KBA, Inc. September 14, 2012 II. OPTIONAL SERVICES All services not detailed above are considered Optional Services which, along with any other Extra Work requested by the Client, will be performed only when a mutually negotiated Supplement to this Agreement is executed, specifying scope of services and budget. In addition to the Potential Optional Services already outlined in Exhibit A-1, Exhibit A-1 — Supplemental 1, and Exhibit A-1 — Supplemental 2, the following has been added: G. Public Involvement Support: 1. Coordinate media releases and traffic advisory updates. dates. 2. Develop and maintain Project website, updating Project progress monthly. 3. Provide periodic notification newsletters to affected property owners on upcoming work, and include contact numbers. S:\Projects\Contracts\CI lent\Renton\011013-01-Rai nierAveCorridorPh I I\Drafts&N egotiationRecords\I n-House-Drafts\Supp-4-FilteraSystem\Su pp4-KBAFi IterraScope-(F I NAL- Rev1)-2012-0914.docx 4 of 4 . • Exhibit E-1-Supplement No.4 Summary of Payments-CPFF Basic Agreement Supplement#1 Supplement#2 Supplement#3 Supplement#4 Total Direct Salary Cost $ 95,422 $ 534,949 $ 32,898 $ $ 27,642 $ 690,911 Overhead (including Payroll Additives) $ 121,958 $ 683,878 $ 42,057 $ $ 35,338 $ 883,231 Direct Non-Salary Costs (including subconsultants) $ 28,993 $ 299,333 $ 203,733 $ $ 3,727 $ 535,786 Fixed Fee $ 28,627 $ 160,483 $ 9,869 $ - $ 8,293 $ 207,272 Management Reserve $ 25,000 $ 70,957 $ - $ $ - $ 95,957 TOTAL $ 300,000 $ 1,749,600 $ 288,557 $ $ 75,000 $ 2,413,157 I II j i I r Fee Determination Summary Sheet Rainier Ave S AR 167 EXHIBIT E-1 -Supplemental No.4 CONSULTANT FEE DETERMINATION SUMMARY SHEET (COST PLUS FIXED FEE) KBA PROJECT#010013-01 PROJECT: Rainier Ave S(SR 167)-S Grady Way to S 2nd St-CCM and Inspection Services+Stormwater Filterra Systems (20 Filterra Stormwater Units-additional installations) DIRECT SALARY COST(DSC): 2012 Classification Est.Hours Est.Rates Est.Cost Project Manager 18 x $74.00 = $ 1,332 Resident Engineer 20 x $35.00 = $ 700 Office Engineer 60 x $35.00 = $ 2,100 Inspector(Day) 420 x $48.00 = $ 20,160 Project Controls 8 x $43.80 = $ 350 Project Admin 125 x $24.00 = $ 3,000 TOTAL 2012 DSC 651 $ 27,642 TOTAL DSC(2012 to 2014) 651 $ 27,642 OVERHEAD(OH COST-including Salary Additives) DSC x OH of 127.84% x $ 27,642 = $ 35,338 FIXED FEE(FF): DSC(only)x FF Rate of 30.00% x $ 27,642 = $ 8,293 REIMBURSABLE& Vehicle for Inspector $ 2,687 SUBCONSULTANT COSTS Public Outreach $ - Materials Testing $ 1,040 Subconsultant Total $ 1,040 MANAGEMENT RESERVE: $ - GRAND TOTAL-Supplement 4 $ 75,000 PREPARED BY: K.Adams,P.E. Date: September 14,2012 Page 2 of 2 S:\Projects\Contracts\Client\Renton\011013-01-Rain ierAveCorridorPh II\Dratts&Negotiation Records\In-House-Drafts\Supp-SFilteraSystemtEx-E 1-Su pp4-FeeSu m many-2012-0914,xlsx