HomeMy WebLinkAboutAdden 2 R •� CAG-11-105 , Adden #2-12
M AWashington State
Department of Transportation
Supplemental Agreement Organization and Address
KBA, Inc.
Number 2 11000 Main Street
Original Agreement Number Bellevue, WA 98004 ,
CAG-11-105 Phone: 425-455-9720
Project Number Execution Date Completion Date
011013-01 5/1.9/11 12/31/14
Project Title Rainier Ave S(SR 167)-S Grady Way to New Maximum Amount Payable
S 2nd St-Construction Mgmt and Inspection Services $ 2,338,157.00
Description of Work
To add materials testing and special inspection services during the construction phase,per the attached
revised Exhibit G.
The Local Agency of City of Renton
desires to supplement the agreement entered into with KBA, Inc.
and executed on 5/19/11 and identified as Agreement No. CAG-11-105
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
II I
Section 4, SCOPE OF WORK, is hereby ehaRged te Feeelir revised to include:
See attached Exhibit A-I - Supplemental 2.
. i
II
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for
completion of the work to read: No chancie.
III i
Section V, PAYMENT, shall be amended as follows:
Authorized maximum amount payable shall increase by $288,557.00 to a new maximum amount payable
of$2,338,157.00, as set forth in the attached Exhibit E-1 - Supplemental 2,
as set forth un the attached E^h6bit 1-1, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces
below and return to this office for final action.
By: Kristen A.Betty,President '' t h ;
(!t, — /J • ° r- �� ; n -`s7!�Law, Mayor
consultant Signature } - F` ' ` Approving Authority Signature
4 t
DoT Form 140-063EF on I . Walton, City Clerk
Revised 9/2005
KBA, Inc. April 11, 2012
EXHIBIT A-1 - Supplemental 2
SCOPE OF SERVICES
for Construction Management Services
Rainier Avenue S. (SR 167), South Grady Way to South 2nd Street
Contract No. CAG-11-105
By City of Renton (City) request, this Supplemental 2 Scope of Services adds materials testing and
special inspection services to the approved Supplement 1 to the basic Agreement between KBA, Inc.
(Consultant) and the City for the Rairiier Avenue S. Project. The Supplement 1, Exhibit A-1 Scope of
Services, tasks B.8, C.13, and D.1.e, are revised to read:
I. CONSTRUCTION MANAGEMENT SERVICES
B. Construction Services—Contract Administration
8. Record of Materials: Provide Record of Materials (ROM) indicating anticipated material
approvals, material compliance documentation, and materials testing requirements.
Maintain records of material compliance documentation received and advise of any
known deficiencies, as follows:
a. Develop and maintain a ROM for the Project.
b. Review and process Requests for Approval of Materials (RAMs)for the Project.
c. Coordinate testing, including arranging for WSDOT inspection and approval of
precast concrete fabrication.
d. Review test reports for materials supplied by contractor.
Task B Deliverables—add the following new deliverables:
• Record of Materials, RAMs, and associated test reports
C. Construction Services -Field
13. Testing. Conduct or cause to be conducted, materials and laboratory tests in accordance
with the WSDOT Construction Manual, Materials Manual, and Local Agency Guidelines.
Coordinate the work of the Field Representative(s) and testing laboratories in the
observation and testing of materials used in the construction; document and evaluate
results of testing; and inform City and construction contractor of deficiencies.
D. Assumptions
1. Budget
e. The budget allocations shown on Exhibit E-1 — Supplemental 1 and Exhibit E-1 —
Supplemental 2 are itemized to aid in project tracking purposes only. The budget
may be transferred between tasks or people, or between labor and expenses,
provided the total contracted amount is not exceeded without prior authorization.
1 of 1
EXHIBIT E-1
Summary of Payments-CPFF
Basic Agreement Supplemental l' Supplemental 2 'Total
Direct Salary Cost $ 95,422 $ 534,949 $ 32,898 $ 663,269
Overhead
(including Payroll Additives) $ 121,958 $ 683,878 $ 42,057 $ 847,893
Direct Non-Salary Costs
(including subconsultants) $ 28,993 $ 299,333 $ 203,733 $ 532,059
Fixed Fee $ 28,627 $ 160,483 $ 9,869 $ 198,979
Management Reserve $ 25,000 $ 70,957 $ - $ 95,957
TOTAL $ 300,000 $ 1,749,600 $ 288,557 $ 2,338,157
Page 1 of 2
Fee Determination Summary Sheet
Rainier Ave S(AR 167)
EXHIBIT E-1 -Supplemental No..2
CONSULTANT FEE DETERMINATION SUMMARY SHEET
(COST PLUS FIXED FEE)
KBA PROJECT#010013-01
PROJECT: Rainier Ave S(SR 167)-S Grady Way to S 2nd St-CM and Inspection Services
DIRECT ALARY COST S O (DSC):
2012 Classification Est.Hours Est.Rates Est.Cost
Project Manager 6 x $74.00 = $ 444
Resident Engineer 140 x $38.00 = $ 5,320
Office Engineer 22 x $35.00 = $ 770
Contract Administrator 5 x $25.00 = $ 125
Project Admin 4 x $24.00 = $ 96
TOTAL 2012 DSC 177 $ 6,755
2013 Classification
Project Manager 15 x $77.70 = $ 1,166
Resident Engineer 244 x $39.90 = $ 9,736
Office Engineer 37 x $36.75 - 1,360
Contract Administrator 11 x $26.25 = $ 289
Project Admin 8 x $25.20 = $ 202
TOTAL 2013 DSC 315 $ 12,751
2014 Classification
Project Manager 15 x $81.60 = $ 1,224
Resident Engineer 244 x $41.90 = $ 10,222
Office Engineer 37 x $38.60 = $ 1,428
Contract Administrator 11 x $27.75 = $ 305
Project Admin 8 x $26.50 = $ 212
TOTAL 2014 DSC 315 $ 13,392
TOTAL DSC(2012 to 2014) 807 $ 32,898
OVERHEAD(OH COST-including Salary Additives)
DSC x OH of 127.84% x $ 32,898 = $ 42,057
FIXED FEE,(FF. :
DSC(only)x FF Rate of 30.00% x $ 32,898 = $ 9,869
REIMBURSABLES:
Vehicle,Mileage,Office Lease,Supplies,Copier $ 674
- i
Page 1 of 2
S:\Projects\Contracts\Client\Renton\011013-01-RainierAveConidorPhll\Drafts&NegotiationRecords\ln-House-Drafts\Supp-2-MatenalsTesling\Ex_E-1_Supp2-FeeSumm rry,2012-0427.)dsx
Fee Determination Summary Sheet
Rainier Ave S(AR 167)
SUBCONSULTANT COSTS(See Exhibit G)
Public Outreach $ -
Materials Testing $. 203,059
Subconsultant Total $ 203,059 .
MANAGEMENT RESERVE- 5.15% $ -
GRAND TOTAL-Supplement 2 $ 288,557
PREPARED BY: K.Adams, P.E. Date: April 11,2012
Page 2 of 2
S:\Projects\Contracts\Client\Renton\01101301-RainierAveCortidorPhII\Drafts&NegotiationRecords\In-House-Drafts\Supp-2-MalerialsTesting\Ez_E-1_Supp2-FeeSum ry-2012-0427.x1sx
Exhibit G
Subcontracted Work
The AGENCY permits subcontracts for the following portions of the work of this AGREEMENT:
Widener and Associates - Environmental, Public Notification
Enviroissues - Public Outreach
Kleinfelder - Material Testing Services _
II
DOT Form 140-089 EF Exhibit G
Revised 6105
EXHIBIT G-1
KLEINFELDER FEE DETERMINATION -SUMMARY SHEET
(Mandatory when Subconsultants are utilized)
City of Renton Project#CAG-11-105
PROJECT: Rainier Ave S(SR 167)-S Grady Way to S 2nd Street Project CM&Inspection Services
2012 DIRECT SALARY COST(DSC):
Estimated Estimated Estimated
Classification Hours Rates Cost
Senior Project Manager 12 x $59.63 = $715.56
Project Manager 60 x $33.66 = $2,019.60
Project Admin 23 x $22.50 = $517.50
Dispatch/Scheduling 30 x $22.50 = $675.00
Soils Tech 632 x $22.00 = $13,904.00
Concrete Tech 32 x $22.00 = $704.00
RebarTech 32 x $22.00 = $704.00
Sample Pickup 26 x $22.00 = $572.00
TOTAL 2012 DSC 847 $19,811.66
2013 DIRECT SALARY COST(DSC):
Estimated Estimated Estimated
Classification Hours Rates Cost
Senior Project Manager 13 x $62.02 = $806.26
Project Manager 75 x $35.01 = $2,625.75
Project Admin 22 x $23.40 = $514.80
Dispatch/Scheduling 50 x $23.40 = $1,170.00
Soils Tech 840 x $22.88 = $19,219.20
Concrete Tech 116 x $22.88 = $2,654.08
RebarTech 112 x $22.88 = $2,562.56
Asphalt Tech 96 x $22.88 = $2,196.48
Sample Pickup 94 x $22.88 = $2,150.72
TOTAL 2012 DSC' 1,418 $33,899.85
OVERHEAD(OH COST-including Salary Additives)
OH Rate x DSC of 192.8% x $53,711.51 = $103,561.16
FEE(Fee):
Fee Rate x(DSC)of 30% x $53,711.51 = $16,113.45
REIMBURSABLES:
Laboratory Testing&Pit Mileage
Total Reimbursables = $29,672.48
Subconsultant Total $0.00
GRAND TOTAL $203,058.61
it
1 of 1 CsP-8E>n.Ae (a,6/01)
Exhibit G-3
Breakdown of Subconsultants Overhead Cost
Account Title $ Beginning Total % of Direct Labor
Direct Labor 69,295,850.00 100.00%
Overhead Expenses:
FICA 10,560,090.00 15.24%
Unemplqyment 76,768.00 0.11%
Health/Accident Insurance 11,426,878.00 16.49%
Medical Aid & Industrial Insurance 1,833,370.00 2.65%
Holiday/Vacation/Sick Leave 13,862,240.00 20.00%
Commission/Bonus/Pension 154,748.00 0.22%
Total Fringe Benefits 37,914,094.00 54.71%
General Overhead:
State B&O Taxes 836,293.00 1.21%
Insurance 4,797,389.00 6.92%
Administration &Time Not Assignable 45,792,952.00 66.08%
Printing, Stationery&Supplies 1,044,450.00 1.51%
Professional Services 5,816,618.00 8.39%
Travel Not Assignable 4,375,067.00 6.31%
Telephone&Telegraph Not Assignable 2,283,269.00 3.29%
Fees, Dues& Professional Meetings * 1,396,668.00 2.02%
Utilities&Maintenance 4,941,336.00 7.13%
Professional Development 1,755,107.00 2.53%
Rent 13,314,142.00 19.21%
Equipment Support 2,707,940.00 3.91%
Office, Miscellaneous& Postage ** 6,637,245.00 9.58%
Total General Overhead 95,698,476.00 138.10%
Total Overhead (General + Fringe) 133,612,570.00 192.81%
Overhead Rate (Total Overhead/Direct Labor) 192.81%
DOT Form 140-089 EF Exhibit G-2
Revised 8/07
Exhibit G-3
EnviroIssues
Overhead Schedules
For the Year Ended December 31, 2010
Financial
Statement EnviroIssues WSDOT Accepted
Description Amount Adj. Adj. Ref. Amount
Mileage $2,789 ($274) 0 $2,515 0.07%
Parking $30,537 ($30,537) M $0 0.00%
Taxi/Ferry/Train/Tolls $2,404 $2,404 0.07%
Advertising(incl.Employment Ads) $346 $346 0.01%
Meals-Business $7,259 ($7,259) D $0 0.00%
Registrations $20,415 $20,415 0.57%
Trade Dues $9,257 ($325) E $8,932 0.25%
GSA Industrial Funding Fee $3,243 ($3,243) N $0 0.00%
Delivery $727 $727 0.02%
Postage $3,945 $3,945 0.11%
Telephone $46,138
$46,138 1.28%
Computer Maintenance $109,312 $109,312 3.03%
OnLine Services $38,185 $38,185 1.06%
Accounting Fees $14,464 $14,464 0.40%
Bank Charges(Process Fees) $1,624 $1,624 .0.04%
Business License Expense $7,330 $7,330 0.20%
Contributions $10,034 ($10,034) H $0 0.00%
Copying/Printing $15,071 ($1,955) L $13,116 0.36%
Equipment Lease $63,792 ($2,487) B $61,305 1.70%
Insurance-Business $34,109 $34,109 0.94%
Interest Expense&Loan Fees $11,271 ($11,271) B $0 0.00%
Legal Expense $4,064 $4,064 0.11%
Office Supplies $55,552 $55,552 1.54%
Other.Professional Services $32,338 $32,338 0.90%
Publications $395 $395 0.01%
Subscri ptions $766 $766 0.02%
Taxes-City:Seattle/Tacoma $39,522 $39,522 1.09%
Taxes-Personal Property $2;985 $2,985 0.08% j
Taxes-State B&O $159,669 $159,669 4.42%
Taxes-Use&Local $1,752 $1,752 0.05% t
Miscellaneous $33,181 ($15,701) G $17,480 0.48%
Total General Overhead $3,000,020 ($76,726) ($101,308) $2,821,986 78.16%
I
Total Overhead&Benefits $5,782,132 ($82,512) ($101,308) $5;598,312 155.06%
Overhead Rate(Less FCC) 160`15% 157.86% 155.06%
Facilities Cost of Capital 0.000% $10,812 $10,812 0.30%
$5,609,124
Overhead Rate(Includes FCC) 155.36%
I 'I
Page 2