HomeMy WebLinkAboutCO 3 CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 11-127 C.O.# 3. Cascade Interceptor Rehabilitation CONTRACTOR: SunCoast Environmental NW. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: Additional Items Under This Change Order Unit Quantity Unit Price Total Price NEW ITEM A14:Additional cost to rehabilitate 0 to 12'deep manhole Each 1 $745.00 $745.00 that is 60"diameter(base cost for 48"diam paid under Item A07). NEW ITEM A15:Additional cost to rehabilitate 13'to 19'deep manhole Each 1 $945.75 $945.75 that is 60"diameter(base cost for 48"diam paid under Item A08). NEW ITEM A16:Additional cost to rehabilitate 20'to 25'deep manhole Each 1 $2,230.00 $2,230.00 that is 72"diameter(base cost for 48"diam paid under Item A09). NEW ITEM B12:Additional cost to rehabilitate 13'to 19'deep manhole Each 1 $945.75 $945.75 that is 60"diameter(base cost for 48"diam paid under Item B08). Sub Total $4,866.50 Sales Tax(9.5%) $1462.32 Total Additional Work $5,328.82 ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET CHANGE ESTIMATED CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE $148,256.43 $170,799.67 $5,328.82 $176,128.49 SIGNATURES: Contractor: Date: Project Engineer: Date: Approved By: Date: 5-/f 0 r 7 (Utilities System Director) H:FileSys\WWP-Wastewater\WWP-27-3588\CO-3-Cascade Interceptor Rehabilitation/MB