CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: CAG 11-127 C.O.# 1
Cascade Interceptor Rehabilitation
CONTRACTOR: SunCoast Environmental NW.
SUMMARY OF PROPOSED CHANGE:
Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra
work as outlined below:
Additional Items Under This Change Order Unit Quantity Unit Price Total Price
NEW ITEM B09:Additional cost to provide point repair of infiltration 4 LS 1 $1,250.00 $1,250.00
feet upstream of manhole 5321-029
Sub Total $1,250.00
Sales Tax(9.5%) $118.75
Total Additional Work $1,368.75
i
ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET CHANGE ESTIMATED CONTRACT TOTAL
AMOUNT AMOUNT THIS ORDER AFTER CHANGE
$148,256.43 $148,256.43 $1,368.75 $149,625.18
SIGNATURES.
Contractor. L. �AA trj, , Date: 2ra-I't-
Project Engineer: �'� p Date: ,Z - -
Approved By: Date: U �--
(Utiliti6g System Director)
H:FileSys\W W P-Wastewater\W W P-27-3588\CO-1-Cascade Interceptor Rehabilitation/MB