Contract Number
Contract Title
Federal Aid Numbers
068036
Strander Boulevard Extension Phase 1, Segment 2A
STPUL1276 004 HPP -1276 005
Change Order Number
Change Description
Date
MC -001A
Work Started
January 31, 2012
Project Engineer
Phone
City of Renton, Keith Woolley
(425) 430 -7318
Prime Contractor
Phone
Atkinson Construction
(425) 255 -7551
Brief Description of Problem /Reason for Entitlement:
Add project sign for City of Renton and project stakeholders. Sign details and method of payment not included in Contract
Documents.
This minor change will have a 001 B when the sign is installed at the city's designated location.
Justification of Cost:
Agreed to track in accordance with Standard Specification 1 -09.6, Force Account.
All work, materials and measurements to be in accordance with the provisions of the Contract for the type of
construction involved unless stated othe /ise ,th�is docu ent.
Resident Engineer's Signature: ��{�L ��' �' Date 2 - / – /Z_.
Prime Contractor's Signature or
Method of Concurrence:
City of Renton Project Manager's
Signature for Execution:
Date
DateG
Z—
Calculated By
Date
Checked By
Date
Dana Salyer
02/01/2012
Bob Lee
02/01/2012
Inspector's Signature
Date
Work Started
Work Completed
01/30/2012
01/31/2012
Distribution: Copy with Attachments - Project Engineer
Copy without Attachments - Prime Contractor
Original without Attachments - Office
Form A — Revised 09/2009
" -- 0 DAILY REPORT OF
R E N T O N FORCE ACCOUNT WORKED
AlIrAD OF THE CURVE
Project Name: Strander Boulevard Extension Project No: CAG 11 -133
Item No.: 121 Minor Change 001A Date: 01/30- 31/2012
Description of Work: Minor Change - Project Sign for ground breaking. Sign will be installed permanently
at the city's designated location on a later date.
Work by Subcontractor?: (mark 'r if yes)
Prime Contractor: Atkinson Const. Sub - Contractor:
STRAIGHT TIME OVERTIME
DOLLAR
NAME OCCUPATION HOURS WWR HOURS WWR
AMOUNT
Mike Wolleat
Foreman
4
$ 47.01
$
188.04
Alfredo Abarra
Laborer
2
$ 47.01
$
94.02
Shawna Bartlett
Laborer
2
$ 47.01
$
94.02
$
-
$
-
SUBTOTAL - LABOR:
$
376.08
LABOR OVERHEAD & PROFIT @ 29%
$
109.06
LABOR TOTAL $
485.14
EQUIPMENT
HOURS HOURS ADJUSTED STANDBY
DOLLAR
EQUIPMENT OR ATTACHMENTS WORKING STANDBY RATE RATE
AMOUNT
Ford F450
4
28.51
$
114.04
Is
Is
-
SUBTOTAL - EQUIPMENT
$
114.04
EQUIPMENT OVERHEAD & PROFIT @ 21%
$
23.95
EQUIPMENT TOTAL
MATERIALS SERVICE
$
137.99
MATERIALS
QUANTITY UNIT PRICE
DOLLAR AMOUNT
Zumar Industries Invoice 153247'
1 Invoice $ 820.00
$
820.00
is
-
SUBTOTAL - MATERIALS
$
820.00
MATERIALS OVERHEAD & PROFIT @ 21%
$
172.20
MATERIALS TOTAL
$
992.20
The above labor & equipment hours, and material
quantities are agreed to by:
TOTAL:
$
1,615.33
12% MARKUP (for prime when subcontract work)
12% <$25,000
$
-
Contractor's Representative Date
10% >$25,000 to $100,000
7% >$100,000
SHEET TOTAL:
$
-
Owner's Representative Date
Pay Estimate Entered:
11 If checked, this work is in dispute. Agreement with hours and
Date:
quantities does not consitute entitlement. Actual
entitlement, if
any, will be determined at a later date.
By:
Distribution: Original to File Copy to Contractor Copy to Inspector
Page 1 of 1
i I
ZUMAR
Wumar Industries, INC.
PO Box 44549
Tacoma, WA 98448-0549
253.536.7740 Fax:253,536.8680
INVOICE
0153247
01/30112
0150312
01126112
002488
CON
I STRANDER BL-VD - RUSO
WILL CALL
.00
.00
STRANDER BLVP PROM CT SIGN
48
48
WAGSWP 1 2 12 ;? WOEG
WASH GS MOD POST 12X T 2 EG COPY.125 ALUM EG
SEE A TTA CHEV W 72" PROJECT SIGN
22
22
ANGLE 1.75X 1.75 IF
1.314" X 1-314" X 114" ALUM ANGLE
4jA 6.6' LrIdG ms
J-P
11
SC I Doc EA
POST CUP - CAS FiNG ONLY
12
12
BOLT38KI34RHSS CA
3a"X 1-314"RECTAMOU4AR HEAD CLIP SOLT - STAINLESSS TEEL
12
12
FW76SS EA
318fl STAINLESS STEEL F4A7WASHER
12
12
LNUT28SS EA
318" NYLON WSERTLOCKNUTFOR CLIP OR PANEL BOLT- STAINLESS
Customer Copy
NET 30 DAYS
820.000 1 820.00
820.00
D", dunt-:::
.00
.00
820.00
A"ll"KINSON EXTRA WORK ORDER EWO# Q Q 4 *2 6
C O N S T R U C T 1 O N •
Project # 1 rp i -7
Date 1 A,
Work Performed For: ���;� V�/l i nn y'. �_ T�, , C ;-j-% 4 Rf;f11+ V-\ Sheet No. of
Description of Work: 14 71 P /.
I J J
Atkinson , Representative
MT i t
Issue / Account
Subcontractor I Owner Representative
HOURS
NO.
NAME / DESCRIPTION
REG
O.T.
4
Q'
O
m
-
Q
J
LABOR TOTAL
N
J
Q
,
W
F
a
MATERIAL TOTAL
z
w
2
CL
CY
w
EQUIPMENT TOTAL
0
U
Q
H
z
O
U
m
7
SUBCONTRACTOR TOTAL
Atkinson , Representative
MT i t
Issue / Account
Subcontractor I Owner Representative
r
` KINSON 0,
C O N S T R U C.T I O N
EXTRA WORK ORDER EWO# O Q 4 2 7
Project # 1 Svc `1
Date
Work Performed For: a *5',e,0 Sheet No. _ of
f
Description of Work: --- r �4 j ► t r
- -� A/c ,
Atkinson Representative
Issue / Account
� q�e i
Subcontractor / Owner Representative
HOURS
NO.�
NAME I DESCRIPTION
REG
O.T.
P Gs/ P ,wt
O
OD
Q
J
I
LABOR TOTAL
I
J
a
w
Q
MATERIAL TOTAL
z
w
O
w
{
EQUIPMENT TOTAL
z
O
U
Q
H
z
O
U
m
7
j SUBCONTRACTOR TOTAL
- -� A/c ,
Atkinson Representative
Issue / Account
� q�e i
Subcontractor / Owner Representative