HomeMy WebLinkAboutCO 27 CAG-11-133 , CO #27-15 CHANGE ORDER Date: June 8,2015 Review 9 Documentation RE N T O N Federal Aid: STPUL-1276(004), x❑ Resident Engr. AHEAD o r T Er E C U ev r State Contract: HPP1276(005) 9 Materials Appr Engr. 1055 South Grady Way Contract: N/A O City Project Manager Renton,WA 98057 Projects: CAG 11-133 Change Order. ❑ Finance(>1o0/) 27-FINAL CONTRACTOR: RECAPITULATION Atkinson Construction ORIGINAL CONTRACT: $ 11,381,158.70 707 S. Grady Way Ste 500 PREVIOUS ADDITIONS: $ 2,351,017.68 Renton,WA 98057 PREVIOUS DEDUCTIONS: $ 0.00 PROJECT: PREVIOUS TOTAL: $ 13,732,176.28 Strander Blvd, SW 27L' St Extension THIS CHANGE(ADD.): $ 16,700.00 Phase 1 (DED.): $ 0.00 ADJUSTED TOTAL: $ 13,748,876.28 Sections 1-04.4 and 1-04.5 of the 2010 Standard Specifications shall govern the issuance of this Change Order. The work of this contract is herein modified to include the change detailed below. Additional quantities for existing and new items shall constitute the complete and frial settlement for all costs of labor, material, equipment, overhead, profit, permit fees, damages(whether direct or indirect),and all other claims by the contractor as a result of this change. The time for completion is not changed by this Change Order; 0 working days are hereby added to the contract. (CONTINUED NEXT PAGE...) Your proposal and this acceptance shall constitute and become part of the contract, subject to all conditions contained therein,0moddiffiedy this Change O er. Accepted on: �/�� Approved by ++ Date City of Renton Transportation Design Supervisor Date Atkinson Construction Acknowledged by: See Included Approved by: Surety ' y f Re n Public Works Administrator Date Surety Sea/ (if Applicable) Page 1 of 2 Logged(City of Renton use only) 6/12/201 5 Atkinson Construction Strander Blvd., SW 27 St Extension Change Order No. 27 June 8, 2015 Reason for Change: Due to pour soil conditions at the site of the pump station the existing material could not be used as backfill. Gravel borrow-was required to be used as backfill material at the wetwell, inlet manhole, valve vault, meter vault and pipe trenches and other areas within the pump station limits. This was followed up by e-mail from Bob Lee. Per email from Bob Lee that it is the intent to pay for the material under bid item 11 -Gravel Borrow Incl. Haul Shoofly. This determination was protested by the Contractor per serial letter 020 of November 28, 2012. The City followed up responded with Serial Letter 017 of December 27, 2012 that stated this material would be paid under existing bid item 11 Gravel Borrow Including Haul- Shoofly until further information was received. No tickets were submitted and the Contractor forwarded the information via Serial Letter 079 of April 6, 2014 regarding additional costs for the change of backfilling the pump station structures with gravel borrow and hauling off the unsuitable material. City of Renton serial letter 017 of December 27, 2012 directed Atkinson to use Gravel Borrow Including Haul for Shoofly at the applicable unit bid price as backfill for the pump station structures. The Contractor disagreed with the Engineer's determination that the unit bid price for bid item 11 -Gravel Borrow Incl. Haul Shooflv was applicable to this work. The Contractor contended that this is more labor intensive with lower production rates since there are sweveral structures to work around. It is agreed that this work be compensated in accordance with Standard Speccification 1-09.6 Force Account. Description: This change compensates for all labor,equipment and materials to furnish,haul place and compact Gravel Borrow at the pump station footprint to backfill around structures, in pile trenches and in usuitable areas. Add the Following New Items to Contract CAG 11-133: New Bid Item SA-178 -Gravel Borrow at Pump Station"by Force Account. EST @ ............. $16,700.00 Total this Change Order $16,700.00 Page aof 2 C.O.#27-Final CITY OF RENTON 06/19/2015 Public Works Department CHANGE ORDER NO.27- Final Financial Summary CONTRACT: Strander Blvd/SW 27th Street Extension, Phase 1, Segment 2A CAG-11-133 CONTRACTOR: Guy F.Atkinson Construction LLC Contract Summary Funding Summary Original Contract: $ 11,381,158.70 Original Contract: $ 11,381,158.70 City Funds Change Order No. 1 $ 43,096.00 Sound Transit Change Order No. 2 $ 28,155.30 Federal STPUL Change Order No. 3 $ 50,497.35 Federal FIMSIB Change Order No. 4 $ 209,772.86 State FIMSIB Change Order No. 5 not used TIB Change Order No. 6 $ 125,762.00 TIB Commitment $1,100,000 Change Order No. 7 $ 244,624.73 Property Sale to BNSF $561,335 Change Order No. 8 $ 30,630.00 Wetland Bank Credit $328,720 Change Order No. 9 $ 15,995.62 Authorized Budget Increase $440,000 Change Order No. 10 $ 42,000.00 Change Order No. 11 $ 79,795.54 Change Order No. 12 $ - Change Order No. 13 $ 38,046.02 Change Order No. 14 $ 24,188.00 Change Order No. 15 $ 308,235.69 Change Order No. 16 $ 33,980.70 Change Order No. 17 $ 24,953.51 Change Order No. 18 $ 4,269.23 Change Order No. 19 $ 18,541.70 Change Order No. 20 $ - Change Order No. 21 $ 14,847.79 Change Order No. 22 $ 2,606.35 Change Order No. 23 $ 45,680.57 Change Order No. 24 $ 803,762.68 Change Order No. 25 $ 13,696.78 Change Order No. 26 $ 147,879.18 Change Order No. 27 $ 16,700.00 Adjusted Total $ 13,748,876.30 jAdjusted Total $ 13,811,213.53 remaining: $ 62,337.23