CHANGE ORDER
Date: May 15.2015 Review AL 5
O Documentation
R E N T O N Federal Aid: STPUL-1276(004).HPP1276(005j_ ❑x ResidentEngr. 1;-3�
A H F A D OF T H t CURVE State Contract: N/A ❑x Materials Appr Ergr.
1055 South Grady Way Contract: CAG 11-133 o City Project Manager 1?1-
Renton,WA 98057 Projects:
Change Order: 26 p Finance(>7D%)
CONTRACTOR: RECAPITULATION
Atkinson Construction ORIGINAL CONTRACT: $ 11.381,158.70
707 S.Grady Way Ste 500 PREVIOUS ADDITIONS: $ 2.203,138.40
Renton,WA 98057 PREVIOUS DEDUCTIONS: $ 0.00
PROJECT- PREVIOUS TOTAL: $ 13.584,297.10
Strander Blvd, SW 27th St Extension THIS CHANGE(ADD.): $ 147.879.18
Phase 1
(DFD.): $ 0.00
ADJUSTED TOTAL. $ 13.732,176.28
Sections 1-04.4 and 1-04.5 of the 2010 Standard Specifications shall govern the issuance of this Change Order. The work of
this contract is herein modified to include the change detailed below. Additional quantities for existing and new items shall
constitute the complete and final settlement for all costs of labor,material, equipment,overhead,profit,pernut fees,damages
(whether direct or indirect),and all other claims by the contractor as a result of this change.
The time for completion is not changed by this Change Order;
0 working days are hereby added to the contract.
(CONTINUED NEXT PAGE...)
Your proposal and this acceptance shall constitute and become part of the contract,
subject to all conditions contained therein,as modified this Orange Order.
Accepted on: t Z1 1 Approved by: n"g'f- - 4
Date City of Renton Transportation Design Supervisor Date
By: F71�O�1J IJet�1 n�7 u.� V Qll t tY.]i _ Q 6
Atkinson Construction Ci o Rent Public Works Administrator /' Date
Acknowledged by: See Included
Surer (p /
yENT0;ti Denis awn Mayor
Date
U [�N
i JasonA. Set r ity Clerk Date
V=
Surety Sea/ (if Applicable)
Page 1 of 3 Logged(City of Renton use only)
.......................................................I ._...._.......... I
5.21.2015.L..._.._..._...-...-..._................... ........I......_.............................................
CITY OF •
Atkinson Construction CHANGE ORDER
Strander Blvd.,SW 27"'St Extension
Change Order No.26
May 15,2015
Reason for Change:
Variations in Estimated Quantities—Standard Specification 1-04.6
The following Bid Items increased or decreased by more than 25 percent of the original proposal
quantity or quantity adjusted by change order:
Bid Item 8 Unsuitable Foundation Excavation Including Haul
Bid Item 12 Sub Ballast
Bid Item 16 Quarry Spalls - Roadway
Bid Item 70 Crushed Surfacing Base Course
Bid Item 71 Permable Ballast
Bid Item 82 Street Sweeping
Due to pour soil conditions under the Strander Roadway, Sound Transit Driveway and Access
Road, overexcation below subgrade and backfilling with Quarry Spalls was required. Overexca-
vation was also needed under the wall footings and backfilling with either Quarry Spalls or
Crushed Surfacing Base Coarse. BNSF expanded the scope to track work and changed the mate-
rials for the backfill of the bridge abutments which led to an overrun of Sub Ballast and Crushed
Surfacing Base Coarse. During the life of the project the adjacent Sound Transit Project was
hauling material off site at joint entrances at the north limits of the Strander Project. The Sound
Transit project removed a substantial amount of the quarry spall access road that was installed by
the Strander project. This resulted in additional street sweeping by the City since the Department
of Ecology inspector warned both projects that the streets must be keep clean. Therefore the
Street Sweeping effort increased dramatically during that time frame. Bid Item 71 Permeable
Ballast underran by more than 25%. A component of this change compensates the Contractor for
additional cost for that portion of the work beyond 25 percent of the proposal quantity or as ad-
justed by change order. The additional cost was determined utilizing force account methods for
the cost of the work done as verified by Inspectors Daily Reports. This component of the change
is $147,879.18.
Description:
New Bid Item SA-177"Adjustment for Overs/Unders"compensates the Contractor for all labor,
equipment,materials and other impacts associated with that portion of the work for bid items that
overran or underran beyond 25 percent of the proposal quantity or as adjusted by change order.This
represents full and final payment for the work.
Page 2 of 3
CITY OF •
ORDERCHANGE
Atkinson Construction
Strander Blvd.,SW 27*'St Extension
Change Order No.26
May 15,2015
Add the Following New Items to Contract CAG 11-133:
New Bid Item SA-177"Adjustment for Overs/Unders"
ByLump Sum @...............................................................................................................$147,879.18
Total this Change Order..............................................................................$147,879.18
Page 3 of 3
Plan
BID DESCRIPTION
Quantity i ', • • i i Difference Price 1
Adjusted by Threshold Date Eligible Unit Price Price
Quantity Changed
1 •
8 Unsuitable Ex Off Site-East 1000 1250 2800 1550 $22.00 $37.10 $15.10
806 512.1?0.60
Unsuitable Ex On Site-
8 Stockpile $22.00 $22.00458 `$0.00
$f).00
Unsuitable Ex-ST
!) $?_2.00 $3?.10 $15.14
Driveway ,� ;:. 2$6 $4.318.60
12 Sub Ballast 30610 382:1 410'3 ?80 421.()0 $36.74 815.74 2$0 54,407.20
CO 2 Adjust Sub Balist Price
1:39
for Haul and Spec 0 0 53.1£< $000 $3.18 A . 280 ($894.44)
16 Ouary Spalls 1000 2540 7743 5243 $_22,00 $30.61 v 5243 $45,142.23
74 CSBC )700 3375 6015 2640 $7f>.Ci0 $31.61 $15.61
_ 2640 $47,210.4o
71 Perinable Ballast-lhiderun " '
51a,ot.) 1569 $ 7,80120
82 Street SweepirySea Tac. 300 37r; 806 431 $120.00 4153.()7 $33.07 33 $7,031.31
.-
82 Street Sweeping-KI F3 $120.00 $241.98 $87.98
3981 532.62a.04
CITY OF RENTON 05/28/2015
Public Works Department
CHANGE ORDER SUMMARY
CONTRACT: Strander Blvd/SW 27th Street Extension, Phase 1, Segment 2A CAG-11-133
CONTRACTOR: Guy F. Atkinson Construction LLC
Contract Summary
Original Contract: $ 11,381,158.70
description
Change Order No. 1 $ 43,096.00 Revised quarry spall access road for Sound Transit
Change Order No. 2 $ 28,155.30 Revise subballast per BNSF and removal of Tukwila stockpile(portion)
Change Order No. 3 $ 50,497.35 AT&T and BNSF west side fiber revisions
Change Order No. 4 $ 209,772.86 Revised dewatering pipe
Change Order No. 5 not used
Change Order No. 6 $ 125,762.00 Remove and Dispose of Existing Trackbed Material
Change Order No. 7 $ 244,624.73 Dewatering Delay Impacts;Added BNSF work-survey,restaking,and vibro-probe
Change Order No. 8 $ 30;630.00 Revised PSE Utility Trench
Change Order No. 9 $ 15,995.62 400 LF FIGS Conduit for PSE
Change Order No. 10 $ 42,000.00 SPU Waterline Stockpile Removal and Monitoring
Change Order No. 11 $ 79,795.54 Tie-back/Utility Conflict
Change Order No. 12 $ - Additional Working Days
Change Order No. 13 $ 38,046.02 Reroute Dewatering to the North
Change Order No. 14 $ 24,188.00 Stage Line Wall Interference with Walers
Change Order No. 15 $ 308,235.69 Stage II Shoring Conflicts(tie-back/sheet pile/corner conflict)
Change Order No. 16 $ 33,980.70 BNSF Access Rd
Change Order No. 17 $ 24,953.51 Sheet Pile Obstruction
Change Order No. 18 $ 4,269.23 BNSF Fence Modifications
Change Order No. 19 $ 18,541.70 Groundwater Separation
Change Order No. 20 $ - 20 Additional Working Days
Change Order No. 21 $ 14,847.79 Naches, ST Well,Concrete, MCC,2 days dewatering
Change Order No. 22 $ 2,606.35 Davit Crane(credit), Flowmeter, Fall Arrest
Change Order No. 23 $ 45,680.57 BNSF Curtain Wall List
Change Order No. 24 $ 802,762.68 unilateral Schedule A Overruns/Contract Reconciliation
Change Order No. 25 $ 13,696.78 Extended dewatering-Pump Station Startup
Change Order No. 26 $ 147,879.18 Bid Item Renegotiation
Change Order No. 27 pending
Adjusted Total $ 13,731,176.30
A $ 2,350,017.60 20.6%
C.O.#26
CITY OF RENTON 05/28/2015
Public Works Department
CHANGE ORDER NO. 26
Financial Summary
CONTRACT: Strander Blvd/SW 27th Street Extension, Phase 1, Segment 2A CAG-11-133
CONTRACTOR: Guy F. Atkinson Construction LLC
Contract Summary Funding Summary
Original Contract: $ 11,381,158.70 Original Contract: $ 11,381,158.70
City Funds
Change Order No. 1 $ 43,096.00 Sound Transit
Change Order No. 2 $ 28,155.30 Federal STPUL
Change Order No. 3 $ 50,497.35 Federal FIMSIB
Change Order No. 4 $ 209,772.86 State FIMSIB
Change Order No. 5 not used TIB
Change Order No. 6 $ 125,762.00 TIB Commitment $1,100,000
Change Order No. 7 $ 244,624.73 Property Sale to BNSF $561,335
Change Order No. 8 $ 30,630.00 Wetland Bank Credit $328,720
Change Order No. 9 $ 15,995.62 Authorized Budget Increase $440,000
Change Order No. 10 $ 42,000.00
Change Order No. 11 $ 79,795.54
Change Order No. 12 $ -
Change Order No. 13 $ 38,046.02
Change Order No. 14 $ 24,188.00
Change Order No. 15 $ 308,235.69
Change Order No. 16 $ 33,980.70
Change Order No. 17 $ 24,953.51
Change Order No. 18 $ 4,269.23
Change Order No. 19 $ 18,541.70
Change Order No. 20 $ -
Change Order No. 21 $ 14,847.79
Change Order No. 22 $ 2,606.35
Change Order No. 23 $ 45,680.57
Change Order No. 24 $ 803,762.68
Change Order No. 25 $ 13,696.78
Change Order No. 26 $ 147,879.18
Adjusted Total $ 13,732,176.30 jAdjusted Total $ 13,811,213.53
remaining: $ 79,037.23