HomeMy WebLinkAboutCO 21 CAG-11-133 , CO #21-15
CHANGE ORDER
Date: July 10,2014 Reiew
Federal Aid; STPUL-12761004),HPP 127640051 19 Docurrenkdm
RENTON' 19 Resides Erigr.
State Contract: N/A 99 MaterolS Appr ETV.
1055 South Grady Way Contract: CAG 11-133 Ofy Pore-Moroge,
Rentort,WA 98057 Projects:
Change Order: 21 0 F. 10 0/6)
CONTRACTOR: RECAPITULATION
Atkinson Construction ORIGINAL CONTRACT-. $ 11 381 158.70
707 S.Gradv Wav Ste 500 PREVIOUS ADDITIONS: $ 1,322,544.23
Renton,WA 98057 PREvfous DEDucrloNs: 1. Mo
PROJECT. NzEyfous TOTAL: $ 12.703 702.93
Strander Blvd,SW 27"' St Extension THis CHANGE(ADD.): 14,847-79
Phase I
(--D.): 0.00
ADJUSTED TOTAL: $ 12,7185507
Sections 1-04.4 and 1-04.5 of the 2010 Standard Specifications shall govern the issuance of this Change Order. The work of
this contract is herein modified to include the change detailed below. Additional quantities for existing and new items shall
constitute the complete and final settlement for all costs of labor,material,equipment,overhead,profit,permit fees,damages
(whether direct or indirect),and all other claims by the contractor as a result of this change.
The time for completion is not changed by this Change Order;
working days are hereby added to the contract.
(CCW4ED -EXT PAGE.
Your proposal and this acceptance shall cormtime and become bort of the contract,
subject to all conditions corttained therein,as modified by this Change Order.
Aaepted 'A VA App--d by: e�
Dole City of Remm T—pototioi Design Supervisor Dore
QiQ- 7-� ts yt
Atk4riori Caistructim
Ackowledged by: See ImWed
Surety
Page I of 3 C-�f R--
I:0::.i0 4
L-----
--
CITY OF RENTON
Atkinson Construction CHANGE ORDER
Strander Blvd.,SW 271 St Extension
Change Order No.21
July 10,2014
Reason for Change:
el
Revised Naches Crossing:
RFI#122 was submitted on 5/812014 regarding the conduit routing under the sidewalk at Naches Ave..
The plans called for the conduit to be routed in such a way that would require demo of the existing
sidewalk,curb and gutter.It was decided to mole underneath rather than trench and demo to minimize
the impact to cost.This required additional conduit and a'fype 2 Junction box rather than a Type 1.
Remobilization—Wilson Concrete
The Contract Plans showed the sidewalk ending to be completed by others east of the ST Access
Driveway. The City of Renton requested that additional sidewalk be placed to extend to the end. This
required Wilson Concrete to remobilize to the site and construct the additional sidewalk and curb&
gutter.
Abandon Sound Transit Monitoring Well
The existin-monitorin(,well for Sound Transit was within the Tukwila fire access road and either
needed to be relocated or decommissioned.The city requested that the well be decommissioned,
Pump Station Revisions-INICC
Some additional modifications were required for the startup of the pump station.The Contractor is-
sued RFI#128 requesting information regarding issues they were having with startup testing. Incom-
patibilities between the MCC and Pumps were discovered.The following adjustments were required
in order to start up the pump station:
• Leak Detection—ReNv4e
• Overternp—Rewire
• Intrusion Alarm—Panel adjustments and wiring
• Ammeter—Provide larger readout
Additional De-watering—CO#19
Two days of dewatering was required during the installation of the new drainages system.The labor
was compensated for in Change Order No. 19—Groundwater Separation.The pumps were not in-
eluded in the cost and are included in this change order.
The total cost for this change order is S 1047.79.There will he no compensation for additional work-
ing days for this work.
Add the Following Nev,'Items to Contract CAG 11-133:
New Bid Item SA-167 Revised Naches Crossing
ByLump Surn ............... ............ .................................... ....................._.........S2,727,15
Page 2 of 3
CITY OF RENTON
Atkinson Construction CHANGE ORDER
utrand, Blvd.,gw2711 St Extension
Change Order No.2,
July 1U'2014
New Bid Item SA-|08Remobilize—Wilson Concrete
ByLump SLIM&� --............ ....... ................................................----.............................5i7OO.O0
New Bid Item SA-/hVAbandon Sound Transit Well
BhLump Sum�y� ............... .......................... ................ ......... ...... ........ .................................S849.32
New Bid Item SA-|70Pump Station Revisions-MCC
ByForce Account(�t .................... ..................................................... .......................... ........Sl0000O
New Bid Item SA-l7iAdditional i for CO#L9
DhLump Sum(,�t ...... .............. ............... ......... ----- ............ ...... ---- ......... ......S4.571.32
Total this Change Ordcc--------------------------.$14,847.79
Page 3o( 3
( �� 33341 Ninth Avenue South,Suite 300,Federal Way,Washington 98003-2600
`� 2€36/431-2300 . 206/431-2250 Fax • www.abam.com
Date: 09 July 2014
TO: Internal
FROM: Bob Lee, Construction Project Manager
RE: SW 27th/ Strander Boulevard Extension Project, Phase 1, Sement 2A
Contract CAG 11-133
STPUL-1276(004), HPP 1276(005)
Executive Summary: Change Order 21 —Additional Cleanup
Work
Included is Change Order Number 21 for review and initial approval. The executive summary is
not a part of the formal change order but provides backup for the formulation of the change order
including a cost recapitulation.
RECAPITULATION
Original Contract $ 11,381,158.70
Previous Additions $ 1,322,544.23
Previous Deductions
Previous Total $ 12,703,702.93
This Change (add) $ 14,847.79
This Change (ded)
Adjusted Total $ 12,718,550.72
Reason for Change:
Revised Naches Crossing:
RFI#122 was submitted on 5/8/2014 regarding the conduit routing under the sidewalk at Naches
Ave.. The plans called for the conduit to be routed in such a way that would require demo of the
existing sidewalk,curb and gutter. It was decided to mole underneath rather than trench and demo to
minimize the impact to cost.This required additional conduit and a Type 2 Junction box rather than a
Type 1.
Remobilization—Wilson Concrete
The Contract Plans showed the sidewalk ending to be completed by others east of the ST Access
Driveway. The City of Renton requested that additional sidewalk be placed to extend to the end.
09 July 2014
Page 2
This required Wilson Concrete to remobilize to the site and construct the additional sidewalk and curb
&gutter.
Abandon Sound Transit Monitoring Well
The existing monitoring well for Sound Transit was within the Tukwila fire access road and either
needed to be relocated or decommissioned.The city requested that the well be decommissioned.
Pump Station Revisions-MCC
Some additional modifications were required for the startup of the pump station.The Contractor
issued RFI #128 requesting information regarding issues they were having with startup testing.
Incompatibilities between the MCC and Pumps were discovered.The following adjustments were
required in order to start up the pump station:
• Leak Detection—Rewire
• Overtemp—Rewire
• Intrusion Alarm—Panel adjustments and wiring
• Ammeter—Provide larger readout
Additional Dewatering—CO#19
Two days of dewatering was required during the installation of the new drainages system.The labor
was compensated for in Change Order No. 19—Groundwater Separation.The pumps were not
included in the cost and are included in this change order.
The contractor submittal proposals for each of the above changes which seemed reasonable. For
additional information please see backup attached.Additional bid items were created for each
additional cleanup item of work and are as follows:
Items Affected:
Item Description Quanity Measure Price Cost
SA-167 Revised Naches Crossing 1 LS $ 2,727.15 $ 2,727.15
SA-168 Remobilize -Wilson Concrete 1 LS $ 1,700.00 $ 1,700.00
SA-169 Abandon Sound Transit Well 1 LS $ 849.32 $ 849.32
SA-170 Pump Station Revisions- MCC 5000 EST $ 5,000.00 $ 5,000.00
SA-171 JAdditional Dewatering- CO#19 1 LS $ 4,571.32 $ 4,571.32
Total Additions: $14,847.79
New Bid Item SA-167 Revised Naches Crossing
ByLump Sum @ ............. ...........................................................................................$2,727.15
07 March 2014 ,
Page 3
New Bid Item SA-168 Remobilize—Wilson Concrete
ByLump Sum @ ............. ...........................................................................................$1,700.00
New Bid Item SA-169 Abandon Sound Transit Well
ByLump Sum @ ............. ..............................................................................................$849.32
New Bid Item SA-170 Pump Station Revisions - MCC
ByForce Account @ ...................................................................................................$5,000.00
New Bid Item SA-171 Additional Dewatering for CO 1119
ByLump Sum @ ............. ...........................................................................................$4,571.32
Net Increase........................................$14,847.79
Backmatter Attached
Bid Item 167:
• Atkinson's Serial Letter No. 0063 of May 28, 2014
• City of Renton's Serial Letter No. 0045 of May 28, 2014
• RFI#122—Illumination Connection
• Independent Estimate
Bid Item 168:
• Email of 09 June 2014 from Bob Lee
• Independent Estimate
Bid Item 169:
• Email of 23 June 2014 from City of Renton
• Atkinson's Serial Letter No. 0064 of June 12, 2014
• Independent Estimate
Bid Item 170:
• Email of 27 June 2014 from City of Renton
i+.
09 July 2014
Page 2
• Email of 26 June 2014 from Bob Lee
• RFI #128 —Pump Station Startup
• Additional Correspondence from Designers
• Independent Estimate
Bid Item 171:
• Email of 30 June 2013 from Atkinson
• Atkinson's Estimate from CO #19
• Slead's Invoice for Dewatering
• Independent Estimate
cc: Project File
wr.l
M
T
O
� N r
LLQ r
U r
r 0
O Q
U
ONO n� O M LM
00 O M C` O C6 nj
O r OD O r (0
LO CO N N
ap T 03 EA ca r O
M EA 00
Cl)
� EA ER
NC
++ C
O co
E
OU- U
U) �- C
z
E J m m � N
*- 7 co .. � � m OU p
d N c gcn
E c m
0o cNo �00 )_ E _� Ecom
7 C6 CO LL E >,-O N "O
C M a LL O N O O C L
d T = 0 Z5
O [u [V ([S U a">� L O
0 O N LL OUCnLL LL coCl1 � FFCL3: < Q
Z
ZUJ x
Q-M d
Lj0 Ch
w J
LL � Oia G1 C
W C
d
(� V Z r t
.fl Qu' ti N
= N C
aV 0
cn =
NO O O Ln Co O co O N O I N 0 M 0 M O a)
I- O CO CM 00 O t- O CD O Ln O O O h m N n r- �
= w (D 6 I- N 'N 4 O 6 O 6 CD CD 6 O M O 1 h O
Ln CA LLQ O C` CD N Cl) CA O CA It w M a0 0 (D It Ln
O rqztn n CD (D (A O N O r N Cl! CF! N L[) CC) LL)
O Q - CO 00 O 0) LC) � O LO N 0) co 00 Cl) V q* CID It 00
00 It N LO O N CO r 'It f- Cl) N O CO N T r
LL C'7 N N r N M f�
�+ r N
7r
C (� (A EA Ef3 Ef3 K3 c
Cl) Efl 6s (A (f}Efl V) (R tq fH b9 63 (4 EA d3 (fl 69 EA
O r T CD T a0 m O
r N co tLo (D C` 00 0) r r r T T N N
O
dd E O O O O O O O O O O O O O O O O O O O O O
E zzzzzzzzzzzzzzzzzzzzz
O N L L L L L L L L L L L L
N a� m `m a� CD a) `m a� a) CD a> `m a� a> a) a> `m a� (u a) a)
Q Q C p o ao - o a a a - aao a
O L- -L -L L -L L -L L L L -L L -L L H
v U 000000000000000000000
Z Z = c c c c c c c c c c c c c c c c c c c c c cn
rn L6 ca co Lo Lo LC (0 La m m m La to m m m m m 0 N Lv
O O
V V V 0 0 0 c.) U U U 0 U U U U 0 U U U 0 U U U U U Q
Denis Law 1.001
Mayor City of
�.
Public Works Department-Gregg Zimmerman,P.E.,Administrator
May 28, 2014
Isaac Couture
Atkinson Construction,LLC
707 South Grady Way,Suite 500
Renton,WA 98057
Re: SW 271h/Strander Boulevard Extension Project, Phase 1,Segment 2A
Serial Letter No.045—Response:ATKN-063 Revised Naches Ave SW Xing for
Illumination
Dear Mr.Couture:
We have reviewed Atkinson's revised proposal of May 28,2014,Serial Letter 063, regarding the
revised pricing for the alternate routing of the conduit crossing at Naches Avenue SW. The
revised pricing includes a J Box Type 2, rather than a J Box Type 1. The revised pricing of
$2,727.15 is acceptable and will be compensated under Minor Change. If you have any
questions, please contact Ed Cline at 235-223-6644.
Sincerely,
Arartation Systems Division
E.
Transportation Design Manager
cc: Keith Woolley,Project Manager
Ed Cline,Materials Engineer
Ken Sanberg,Site Inspector
Bob Lee,Resident Engineer
Project File
H:\Division.s\TRANSPOR.TAT\DESIGN.ENG\Rob\Projects-Current\SW 27th Street Connection\200 Correspondence-Letters.Memos.Emaits\202
Outgoing Correspondence To\202.3 Contractor\SL-045 Resp to ATKN SL 063.docx
Renton City Hall• 1055 South Grady Way 9 Renton,Washington 98057.rentonwa.gov