Loading...
HomeMy WebLinkAboutCO 21 CAG-11-133 , CO #21-15 CHANGE ORDER Date: July 10,2014 Reiew Federal Aid; STPUL-12761004),HPP 127640051 19 Docurrenkdm RENTON' 19 Resides Erigr. State Contract: N/A 99 MaterolS Appr ETV. 1055 South Grady Way Contract: CAG 11-133 Ofy Pore-Moroge, Rentort,WA 98057 Projects: Change Order: 21 0 F. 10 0/6) CONTRACTOR: RECAPITULATION Atkinson Construction ORIGINAL CONTRACT-. $ 11 381 158.70 707 S.Gradv Wav Ste 500 PREVIOUS ADDITIONS: $ 1,322,544.23 Renton,WA 98057 PREvfous DEDucrloNs: 1. Mo PROJECT. NzEyfous TOTAL: $ 12.703 702.93 Strander Blvd,SW 27"' St Extension THis CHANGE(ADD.): 14,847-79 Phase I (--D.): 0.00 ADJUSTED TOTAL: $ 12,7185507 Sections 1-04.4 and 1-04.5 of the 2010 Standard Specifications shall govern the issuance of this Change Order. The work of this contract is herein modified to include the change detailed below. Additional quantities for existing and new items shall constitute the complete and final settlement for all costs of labor,material,equipment,overhead,profit,permit fees,damages (whether direct or indirect),and all other claims by the contractor as a result of this change. The time for completion is not changed by this Change Order; working days are hereby added to the contract. (CCW4ED -EXT PAGE. Your proposal and this acceptance shall cormtime and become bort of the contract, subject to all conditions corttained therein,as modified by this Change Order. Aaepted 'A VA App--d by: e� Dole City of Remm T—pototioi Design Supervisor Dore QiQ- 7-� ts yt Atk4riori Caistructim Ackowledged by: See ImWed Surety Page I of 3 C-�f R-- I:0::.i0 4 L----- -- CITY OF RENTON Atkinson Construction CHANGE ORDER Strander Blvd.,SW 271 St Extension Change Order No.21 July 10,2014 Reason for Change: el Revised Naches Crossing: RFI#122 was submitted on 5/812014 regarding the conduit routing under the sidewalk at Naches Ave.. The plans called for the conduit to be routed in such a way that would require demo of the existing sidewalk,curb and gutter.It was decided to mole underneath rather than trench and demo to minimize the impact to cost.This required additional conduit and a'fype 2 Junction box rather than a Type 1. Remobilization—Wilson Concrete The Contract Plans showed the sidewalk ending to be completed by others east of the ST Access Driveway. The City of Renton requested that additional sidewalk be placed to extend to the end. This required Wilson Concrete to remobilize to the site and construct the additional sidewalk and curb& gutter. Abandon Sound Transit Monitoring Well The existin-monitorin(,well for Sound Transit was within the Tukwila fire access road and either needed to be relocated or decommissioned.The city requested that the well be decommissioned, Pump Station Revisions-INICC Some additional modifications were required for the startup of the pump station.The Contractor is- sued RFI#128 requesting information regarding issues they were having with startup testing. Incom- patibilities between the MCC and Pumps were discovered.The following adjustments were required in order to start up the pump station: • Leak Detection—ReNv4e • Overternp—Rewire • Intrusion Alarm—Panel adjustments and wiring • Ammeter—Provide larger readout Additional De-watering—CO#19 Two days of dewatering was required during the installation of the new drainages system.The labor was compensated for in Change Order No. 19—Groundwater Separation.The pumps were not in- eluded in the cost and are included in this change order. The total cost for this change order is S 1047.79.There will he no compensation for additional work- ing days for this work. Add the Following Nev,'Items to Contract CAG 11-133: New Bid Item SA-167 Revised Naches Crossing ByLump Surn ............... ............ .................................... ....................._.........S2,727,15 Page 2 of 3 CITY OF RENTON Atkinson Construction CHANGE ORDER utrand, Blvd.,gw2711 St Extension Change Order No.2, July 1U'2014 New Bid Item SA-|08Remobilize—Wilson Concrete ByLump SLIM&� --............ ....... ................................................----.............................5i7OO.O0 New Bid Item SA-/hVAbandon Sound Transit Well BhLump Sum�y� ............... .......................... ................ ......... ...... ........ .................................S849.32 New Bid Item SA-|70Pump Station Revisions-MCC ByForce Account(�t .................... ..................................................... .......................... ........Sl0000O New Bid Item SA-l7iAdditional i for CO#L9 DhLump Sum(,�t ...... .............. ............... ......... ----- ............ ...... ---- ......... ......S4.571.32 Total this Change Ordcc--------------------------.$14,847.79 Page 3o( 3 ( �� 33341 Ninth Avenue South,Suite 300,Federal Way,Washington 98003-2600 `� 2€36/431-2300 . 206/431-2250 Fax • www.abam.com Date: 09 July 2014 TO: Internal FROM: Bob Lee, Construction Project Manager RE: SW 27th/ Strander Boulevard Extension Project, Phase 1, Sement 2A Contract CAG 11-133 STPUL-1276(004), HPP 1276(005) Executive Summary: Change Order 21 —Additional Cleanup Work Included is Change Order Number 21 for review and initial approval. The executive summary is not a part of the formal change order but provides backup for the formulation of the change order including a cost recapitulation. RECAPITULATION Original Contract $ 11,381,158.70 Previous Additions $ 1,322,544.23 Previous Deductions Previous Total $ 12,703,702.93 This Change (add) $ 14,847.79 This Change (ded) Adjusted Total $ 12,718,550.72 Reason for Change: Revised Naches Crossing: RFI#122 was submitted on 5/8/2014 regarding the conduit routing under the sidewalk at Naches Ave.. The plans called for the conduit to be routed in such a way that would require demo of the existing sidewalk,curb and gutter. It was decided to mole underneath rather than trench and demo to minimize the impact to cost.This required additional conduit and a Type 2 Junction box rather than a Type 1. Remobilization—Wilson Concrete The Contract Plans showed the sidewalk ending to be completed by others east of the ST Access Driveway. The City of Renton requested that additional sidewalk be placed to extend to the end. 09 July 2014 Page 2 This required Wilson Concrete to remobilize to the site and construct the additional sidewalk and curb &gutter. Abandon Sound Transit Monitoring Well The existing monitoring well for Sound Transit was within the Tukwila fire access road and either needed to be relocated or decommissioned.The city requested that the well be decommissioned. Pump Station Revisions-MCC Some additional modifications were required for the startup of the pump station.The Contractor issued RFI #128 requesting information regarding issues they were having with startup testing. Incompatibilities between the MCC and Pumps were discovered.The following adjustments were required in order to start up the pump station: • Leak Detection—Rewire • Overtemp—Rewire • Intrusion Alarm—Panel adjustments and wiring • Ammeter—Provide larger readout Additional Dewatering—CO#19 Two days of dewatering was required during the installation of the new drainages system.The labor was compensated for in Change Order No. 19—Groundwater Separation.The pumps were not included in the cost and are included in this change order. The contractor submittal proposals for each of the above changes which seemed reasonable. For additional information please see backup attached.Additional bid items were created for each additional cleanup item of work and are as follows: Items Affected: Item Description Quanity Measure Price Cost SA-167 Revised Naches Crossing 1 LS $ 2,727.15 $ 2,727.15 SA-168 Remobilize -Wilson Concrete 1 LS $ 1,700.00 $ 1,700.00 SA-169 Abandon Sound Transit Well 1 LS $ 849.32 $ 849.32 SA-170 Pump Station Revisions- MCC 5000 EST $ 5,000.00 $ 5,000.00 SA-171 JAdditional Dewatering- CO#19 1 LS $ 4,571.32 $ 4,571.32 Total Additions: $14,847.79 New Bid Item SA-167 Revised Naches Crossing ByLump Sum @ ............. ...........................................................................................$2,727.15 07 March 2014 , Page 3 New Bid Item SA-168 Remobilize—Wilson Concrete ByLump Sum @ ............. ...........................................................................................$1,700.00 New Bid Item SA-169 Abandon Sound Transit Well ByLump Sum @ ............. ..............................................................................................$849.32 New Bid Item SA-170 Pump Station Revisions - MCC ByForce Account @ ...................................................................................................$5,000.00 New Bid Item SA-171 Additional Dewatering for CO 1119 ByLump Sum @ ............. ...........................................................................................$4,571.32 Net Increase........................................$14,847.79 Backmatter Attached Bid Item 167: • Atkinson's Serial Letter No. 0063 of May 28, 2014 • City of Renton's Serial Letter No. 0045 of May 28, 2014 • RFI#122—Illumination Connection • Independent Estimate Bid Item 168: • Email of 09 June 2014 from Bob Lee • Independent Estimate Bid Item 169: • Email of 23 June 2014 from City of Renton • Atkinson's Serial Letter No. 0064 of June 12, 2014 • Independent Estimate Bid Item 170: • Email of 27 June 2014 from City of Renton i+. 09 July 2014 Page 2 • Email of 26 June 2014 from Bob Lee • RFI #128 —Pump Station Startup • Additional Correspondence from Designers • Independent Estimate Bid Item 171: • Email of 30 June 2013 from Atkinson • Atkinson's Estimate from CO #19 • Slead's Invoice for Dewatering • Independent Estimate cc: Project File wr.l M T O � N r LLQ r U r r 0 O Q U ONO n� O M LM 00 O M C` O C6 nj O r OD O r (0 LO CO N N ap T 03 EA ca r O M EA 00 Cl) � EA ER NC ++ C O co E OU- U U) �- C z E J m m � N *- 7 co .. � � m OU p d N c gcn E c m 0o cNo �00 )_ E _� Ecom 7 C6 CO LL E >,-O N "O C M a LL O N O O C L d T = 0 Z5 O [u [V ([S U a">� L O 0 O N LL OUCnLL LL coCl1 � FFCL3: < Q Z ZUJ x Q-M d Lj0 Ch w J LL � Oia G1 C W C d (� V Z r t .fl Qu' ti N = N C aV 0 cn = NO O O Ln Co O co O N O I N 0 M 0 M O a) I- O CO CM 00 O t- O CD O Ln O O O h m N n r- � = w (D 6 I- N 'N 4 O 6 O 6 CD CD 6 O M O 1 h O Ln CA LLQ O C` CD N Cl) CA O CA It w M a0 0 (D It Ln O rqztn n CD (D (A O N O r N Cl! CF! N L[) CC) LL) O Q - CO 00 O 0) LC) � O LO N 0) co 00 Cl) V q* CID It 00 00 It N LO O N CO r 'It f- Cl) N O CO N T r LL C'7 N N r N M f� �+ r N 7r C (� (A EA Ef3 Ef3 K3 c Cl) Efl 6s (A (f}Efl V) (R tq fH b9 63 (4 EA d3 (fl 69 EA O r T CD T a0 m O r N co tLo (D C` 00 0) r r r T T N N O dd E O O O O O O O O O O O O O O O O O O O O O E zzzzzzzzzzzzzzzzzzzzz O N L L L L L L L L L L L L N a� m `m a� CD a) `m a� a) CD a> `m a� a> a) a> `m a� (u a) a) Q Q C p o ao - o a a a - aao a O L- -L -L L -L L -L L L L -L L -L L H v U 000000000000000000000 Z Z = c c c c c c c c c c c c c c c c c c c c c cn rn L6 ca co Lo Lo LC (0 La m m m La to m m m m m 0 N Lv O O V V V 0 0 0 c.) U U U 0 U U U U 0 U U U 0 U U U U U Q Denis Law 1.001 Mayor City of �. Public Works Department-Gregg Zimmerman,P.E.,Administrator May 28, 2014 Isaac Couture Atkinson Construction,LLC 707 South Grady Way,Suite 500 Renton,WA 98057 Re: SW 271h/Strander Boulevard Extension Project, Phase 1,Segment 2A Serial Letter No.045—Response:ATKN-063 Revised Naches Ave SW Xing for Illumination Dear Mr.Couture: We have reviewed Atkinson's revised proposal of May 28,2014,Serial Letter 063, regarding the revised pricing for the alternate routing of the conduit crossing at Naches Avenue SW. The revised pricing includes a J Box Type 2, rather than a J Box Type 1. The revised pricing of $2,727.15 is acceptable and will be compensated under Minor Change. If you have any questions, please contact Ed Cline at 235-223-6644. Sincerely, Arartation Systems Division E. Transportation Design Manager cc: Keith Woolley,Project Manager Ed Cline,Materials Engineer Ken Sanberg,Site Inspector Bob Lee,Resident Engineer Project File H:\Division.s\TRANSPOR.TAT\DESIGN.ENG\Rob\Projects-Current\SW 27th Street Connection\200 Correspondence-Letters.Memos.Emaits\202 Outgoing Correspondence To\202.3 Contractor\SL-045 Resp to ATKN SL 063.docx Renton City Hall• 1055 South Grady Way 9 Renton,Washington 98057.rentonwa.gov