Loading...
HomeMy WebLinkAboutCO 02-- Date: RE N T O N Federal Aid: AHEAD OF 'r H E CURVE State Contract: 1055 South Grady Way Contract: Renton, WA 98057 Projects: Change Order: CONTRACTOR: Atkinson Construction 707 S. Grady Way Suite 500 Renton, WA 98057 PROJECT: Strander Blvd, SW 27`h St Extension Phase 1 CAG -11 -133, CO #2 -12 5.2012 11 Review © Documentation HPP1276(0051 © Resident Engr. © Materials Appr Engr. -133 © City Project Manager 10 Finance (>10 %) RECAPITULATION ORIGINAL CONTRACT: PREVIOUS ADDITIONS: PREVIOUS DEDUCTIONS: PREVIOUS TOTAL. THIS CHANGE (ADD.): (DED.): ADJUSTED TOTAL. $ 11.381,158.70 $ 0.00 $ 0.00 $ 11,381,158.70 $ 43,096.00 $ 0.00 $ 11,424,254.70 Sections 1 -04.4 and 1 -04.5 of the 2010 Standard Specifications shall govern the issuance of this Change Order. The work of this contract is herein modified to include the change detailed below. Additional quantities for existing and new items shall constitute the complete and final settlement for all costs of labor, material, equipment, overhead, profit, permit fees, damages (whether direct or indirect), and all other claims by the contractor as a result of this change. The time for completion is not changed by this Change Order; zero worldng days are hereby added to the contract. (CONTINUED NEXT PAGE... Your proposal and this acceptance shall constitute and become part of the contract, subject to all conditions contained therein, as modified by is Change Order. Accepted on: Approved b y / Date City of Renton Transportation Design Supervisor Date ay: Atk,'n4 Construction / Acknowledged by: Surety Surety Seal (if Applicable) Page 1 of 2 Logged (City of Renton use only) 2.21.2012 I.........................................................................._......_._................................................................................................. ..............................a Atkinson Construction Strander Blvd., SW 2711, St Extension Change Order 1 February 15, 2012 Reason for Change: Plan sheet TE -3 details two temporary access roads south of the SPU waterline that the Contractor may elect to use dependent upon which SPU crossing the Engineer approves for use. The City of Renton and Sound Transit agreed to construct the access road to the alignment of the future Temporary Access Road that connects to the Sound Transit Driveway Access. This alignment dictated the use of the west crossing and the new access road will be 30 feet wide in lieu of the plan 15 feet wide. The road shall be constructed using Construction Geotextile for Separation with a 1 foot layer of Quarry Spalls placed over the fabric. The roadway shall be constructed to the revised alignment and details included on the attached plan sheet. Add the Following New Item to Contract CAG 11 -133: Description: New Bid Item 138 represents full payment for all labor, equipment, and material necessary to con- struct the revised access road as described in this change order and shown on the included revised plan sheet. This includes additional surveying and traffic control required for the construction and all maintenance required throughout the duration of the project, no further compensation will be made. New Item 138: Revised Access Road — Sound Transit By Lump Sum @ $43, 096 ..................................................... ............................... $43,096 Total this Change Order .................................... ............................... ........................ $43,096 Page 2 of 2 • u ` no V' v 4 0 d v v y � v v� I! i i i i i i i i i i i i i i i -3 i 17-771 a h. i b� } ¢; 4' z O Q U O J Q O (/) W U U Q Z Q ^J^ I�L J Q Z C� O E79 +[�O[ Id O O O 0 0 O n 0 O 0 00 N O O 0 + N O i i o i + i Io 0 CT r i i cc 0 i i nd iCD 00 O i CD + I i o i i� i o io o I + o C� I O I 00 I O II IO LO I O Q {: O cn w O z� o Q z + cif O D Q cz Z D � Q O y y p Q W (_n W O U + W U N E79 +[�O[ Id O O O 0 0 O n 0 O 0 00 N O O 0 + N O