HomeMy WebLinkAboutCO 16 CHANGE ORDER Date: March 21.2014 Review ❑D Documentation E TON Federal Aid: STPUL-1276(0041.HPP1276(005) Resident Engr. trI art zar THF. rr11_ State Contract: N/A © Materials Appr Engr. 1055 South Grady Way Contract: CAG 11-133 City Project Manager Renton,WA 98057 Projects: Change Order: 16 0 Finance(>10%) CONTRACTOR: RECAPITULATION Atkinson Construction ORIGINAL CONTRACT: $ 11.381.158.70 707 S.Grady Way Ste 500 PREVIOUS ADDmONS: $ 1.240.799.11 Renton,WA 98057 PREVIOUS DEDUCTIONS: $ 0.00 PROJECT: PREVIOUS TOTAL: $ 12.621.957.81 Strander Blvd,SW 27th St Extension THIS CHANGE(ADD.): $ 33.980.70 Phase 1 (DED.): $ 0.00 ADJUSTED TOTAL: $ 12,655.938.51 Sections 1-04.4 and 1-04.5 of the 2010 Standard Specifications shall govern the issuance of this Change Order. The work of this contract is herein modified to include the change detailed below. Additional quantities for existing and new items shall constitute the complete and final settlement for all costs of labor,material,equipment,overhead,profit,permit fees,damages (whether direct or indirect),and all other claims by the contractor as a result of this change. The time for completion is not changed by this Change Order; 0 working days are hereby added to the contract. (CONTINUED NEXT PAGE...) Your proposal and this acceptance shall constitute and become part of the contract, subject to all conditions contained therein,as modified• ..'s Change Order. Accepted ors �1 (a 1 1 Approved by L �.� '�—- — ^e2/ 4 Date City of Renton Transportation Design Supervisor Date By: 1�---.t\ � \I tC.t "elairb Atkinson Construction Acknowledged by: N/A Surety Surety See! (T1 Applicabfe) Page 1 of 2 Logged(City of Renton use only) _ F4.115.201q 1..--.-^ CITY OF RENTON CHANGE ORDER Atkinson Construction Strander Blvd.,SW 27th St Extension Change Order No. 16 March 21,2014 Reason for Change: BNSF has requested the City of Renton provide an access road from Naches Ave. SW to the BNSF Railroad Tracks as part of this Contract. This work will consist of survey,clearing&grubbing,grad- ing/surfacing,installation of drain pipe and geotextile fabric for separation. Initially,the contractor proposed an estimate which included 24 inch ductile iron pipe and tree removal services.The City re- quested revised pricing revising the pipe to 2-12"ADS pipe and no tree removal. The revised cost proposed was$33,980.70.BergerABAM did an independent estimate for the additional quantities which totaled$36,239.60.Atkinson's estimate falls just less than the independent estimate and there- fore seem reasonable. This change compensates Atkinson for$33,980.70. No additional working days will be added to the Contract. The following bid items will also be created for BNSF Access Road and compensates the Contractor for all overhead,labor and equipment associated with the construction of the BNSF Access Road. Add the Following New Items to Contract CAG 11-133: New Bid Item SA-159 Additional Clearing By Lump Sum @ $9,788.82 New Bid Item SA-160 Common Borrow(Alternative A) 280 CY @$12.31 per CY $3,447.36 New Bid Item SA-161 ADS Pipe—12 In. 160 LF @$52.09 per LF $8,334.72 New Bid Item SA-162 Construction Geotextile for Separation—BNSF Access 700 SY @$2.54 per SY $1,780.80 New Bid Item SA-163 Crushed Surfacing Base Course—BNSF Access 250 TN @$42.52 per Ton $10,629.00 Total this Change Order $33,980.70 Page 2 of 2