Atkinson Construction 707 S. Grady Way Ste 500 Renton, WA 98057 PROJECT: Strander Blvd SW 27`x' St Extension Phase 1 November 21. 2013 Date: RE N T O N Federal Aid: A II E A rr OF T 11L CUR 4 L• State Contract: 1055 South Grady Way Contract: Renton, WA 98057 Projects ORIGINAL CONTRACT: PREvlous ADDITIONS: PREVIOUS DEDUCTIONS: PREVIOUS TOTAL. THIS CHANGE (ADD.): (DED.): ADJUSTED TOTAL. Change OrderOrder: ( II CONTRACTOR: Atkinson Construction 707 S. Grady Way Ste 500 Renton, WA 98057 PROJECT: Strander Blvd SW 27`x' St Extension Phase 1 November 21. 2013 ❑O © © © O Review Doasnentatia, ResdentEngr L► Materials Appr Engr. CRY Proi- Mar'ager Fiance (> 10%) UL- 1276(004).HPP1276(005) N/A CAG 11 -133 10 RECAPITULATION ORIGINAL CONTRACT: PREvlous ADDITIONS: PREVIOUS DEDUCTIONS: PREVIOUS TOTAL. THIS CHANGE (ADD.): (DED.): ADJUSTED TOTAL. $ 11.381.158.70 $ 748.533.86 $ 0.00 $ 12.129,692.56 $ 42.000.00 $ 0.00 $ 12,171.692.56 Sections 1-04.4 and 1 -04.5 of the 2010 Standard Specifications shall govem the issuance of this Change Order. The work of this contract is herein modified to include the change detailed below. Additional quantities for existing and new items shall constitute the complete and final settlement for all costs of labor, material, equipment, overhead, profit, permit fees, damages (whether direct or indirect), and all other claims by the contractor as a result of this change. The time for completion is not changed by this Change Order; 0 worldng days are hereby added to the contract. (CONTINUED NEXT PAGE... Your proposal and this acceptance shall constitute and become part of the contract, subject to all conditions contained therein, as modified this Orange Order. Accepted oru 12=11Z111 Approved by: r Date City of Renton Transportation Design supervisor Date By: ! sprier) tJ r'— Atkinson Comhu on Ada)owledged by: Surety Surety Seat (if Applicable) Page 1 of 2 Logged (CNy of Rerrton use only) .. ........... . . . . . . . . . . . 1 1.2 6.201 3 w Atkinson Construction Strander Blvd., SW 2711 St Extension Change Order No. 10 November 21, 2013 Reason for Change: Excavated material from the west side Roadway Excavation was stockpile north of Strander due to in- accessibility for haul trucks through the Sound Transit Project to the north. Seattle Public Utilities has a 56 inch waterline running east west north of the stockpile. SPU requested that the City move a por- tion of the pile at the north limits since they had concerns regarding settlement. The geotechnical En- gineer was consulted and forwarded recommendations to alleviate SPU concerns. It was determined to remove a portion of the stockpile at the north end and reshape the side slope. Since SPU required the City to expedite the work it was determined to proceed by Force Account since it would be a short duration activity. Description: This change compensates Atkinson Construction for removing a portion of the west stockpile, associ- ated erosion control measures such as truck tire washing, restabilization of the north stockpile and straw mulch placement. A new bid item will also be created for Additional SPU Waterline Survey Monitoring as requested by SPU. Add the Following New Items to Contract CAG 11 -133: New Bid Item SA -152 "Stockpile Removal, SPU- FA" compensates the Contractor for all la- bor, equipment and material to remove a portion of the stockpile at the northern limits. This work will be tracked and paid in accordance with Section 1 -09.6, Force Account. New Item SA -152: Stockpile Removal SPU - FA ByEst ......................................................................... ............................... $32,000.00 New Bid Item SA -153 "Additional SPU Waterline Survey Monitoring - FA" compensates the Contractor for all labor, equipment and material to monitor SPU 1 through SPU 5 as di- rected by the Engineer. This work will be tracked and paid in accordance with Section 1 -09.6, Force Account. New Item SA -153: Additional SPU Waterline Survey Monitoring - FA ByEst ......................................................................... ............................... $10,000.00 Total this Change Order ............................ ............................... ..................... $42,000.00 Page 2 of 2 O M � O O N U o N r � O d � Z 0� O Z CL W W w D od OYO� O w t V Q L1 av M M r r Mo T O O O 17 � O � ca Cp O pp (D (O O LO (O e- O — I- N = L 0) CO CO M E9 to 69 r N r 69 16- V • u O LO CO r• CO O � R Q G v Z Z Z Z Z Z Z Z Z Z L L L L L V L L L L N C - 6 0 0 0 O. D 0 D p v U 000 0 0 0 0000 ~ r rn rn rn rn rn rn rn rn rn rn °5 Z Z O C C C C C C C C C C C y m O O O m (0 (6 (0 m m m N (0 (6 '� =====-C==== '5 V V u 0 UUU:.)UCiUUUU a m C C m E 2 m c ca D E E E J J m = L L au)m a co 2 2 Fn E D U U � ~ E - - H m - � E � � Li c m c+�amV ' '� (nnLLLL F- co v v LL O O Q Q A rf 1 1 K J u � � v o L U) V C v O O O O O tO co O (M O N O ( (D N t ti O m m CO O r• O (D O ( (O 0 t to O (O C) I-- (O N M O) O O O) O — It ti tiOOOO t to 6. Q M M CO O O tO It O (O N '3 C CD q* N (O O-D N d' M I n n r r N 6. r O O E E9 6j),69 69 E9 C 69 ER to 69 E9 6 69 LO CO r• CO O � R Q G v Z Z Z Z Z Z Z Z Z Z L L L L L V L L L L N C - 6 0 0 0 O. D 0 D p v U 000 0 0 0 0000 ~ r rn rn rn rn rn rn rn rn rn rn °5 Z Z O C C C C C C C C C C C y m O O O m (0 (6 (0 m m m N (0 (6 '� =====-C==== '5 V V u 0 UUU:.)UCiUUUU a m C C m E 2 m C C m E 2