Loading...
HomeMy WebLinkAboutCO 04" eO -Aq-1Z 2012 kniew CR Doaenenation HPP1 276t0051 C Reside» 6*91 Q Materials Appr SVI 03 f7 Fen;rtce(>100%) RECAPITULATION ORIGINAL C0NMCr $ 11,381.158.70 PREVIOUSADDMONS $ 71,251.30 PREvioUS DEDUCTIONS. $ 0.00 PREVIOUS TOTAL: $ 11.452.410.00 THIS CHANGE (ADD.): $ 50.40735 0.00 AD3UstmTOTAL. $ 11;502,907.35 Sections 1-04.4 and 1-04.5 of the 2010 Standard Specifications shall govern the issuance of this Change Order. The work of this contract is herein modified to include the change detailed below. Additional quantities for existing and new items shall constitute the complete and final settlement for all costs of labor, material, equipment, overhead, profit, permit fees, damages (whether direct or indirect), and all other claims by the contractor as a result of this change. The time for completion & not changed by this Change Order; zero working days are hereby added to the contract. Your proposal and *&. acceptance shall core*ite and become part of the contract, subject to all conditions contaimcl therein, as modffiied,, " tge Order. Accepted ore Approved by: Date /40tyton Tronsportation Design Supervisor Date sr• Atk ruction Acknowledged by: Surety Surety Sea! (f# Appfacobie) Page 1 of 2 __ _ waged {cox or Rentm „te or4y) - 7:10 2012 Date, RE N T N' Federal Aid: AIILAP OF THE CURVE .Stare Contract- 1055 South Grady Way Contract: Renton, WA 98057 Projects: Change Order: CONTRACTOR: Atkinson Construction 707 S. Grady Way Ste 500 Renton WA 98057 PROJECT: Strander Blvd SW 27t1i St Extension. Phase i eO -Aq-1Z 2012 kniew CR Doaenenation HPP1 276t0051 C Reside» 6*91 Q Materials Appr SVI 03 f7 Fen;rtce(>100%) RECAPITULATION ORIGINAL C0NMCr $ 11,381.158.70 PREVIOUSADDMONS $ 71,251.30 PREvioUS DEDUCTIONS. $ 0.00 PREVIOUS TOTAL: $ 11.452.410.00 THIS CHANGE (ADD.): $ 50.40735 0.00 AD3UstmTOTAL. $ 11;502,907.35 Sections 1-04.4 and 1-04.5 of the 2010 Standard Specifications shall govern the issuance of this Change Order. The work of this contract is herein modified to include the change detailed below. Additional quantities for existing and new items shall constitute the complete and final settlement for all costs of labor, material, equipment, overhead, profit, permit fees, damages (whether direct or indirect), and all other claims by the contractor as a result of this change. The time for completion & not changed by this Change Order; zero working days are hereby added to the contract. Your proposal and *&. acceptance shall core*ite and become part of the contract, subject to all conditions contaimcl therein, as modffiied,, " tge Order. Accepted ore Approved by: Date /40tyton Tronsportation Design Supervisor Date sr• Atk ruction Acknowledged by: Surety Surety Sea! (f# Appfacobie) Page 1 of 2 __ _ waged {cox or Rentm „te or4y) - 7:10 2012 i "C\ Atkinson Construction Strander Blvd., SW 271�1 St Extension Change Order 3 July 10, 2012 Reason for Change: This change is the result of the following revisions to the west side ATT and BNSF fiber optic reloca- tion work: The conduit run crosses over the King County Metro sewer line and a high pressure gas line at ap- proximate BNSF station 1030+00. It was deterniined by ATT after notice to proceed that this run must be installed in a steel casing when crossing over the two utilities. The addition of an 8 inch steel casing was a change to the Contract. Both the north and south tie in points of the plan fiber tie in locations were revised. BNSF provided information during plan preparation that they had one 2 inch PVC conduit running along the west side of the tracks that was empty. However it was determined during excavation the conduit contained a live fiber. Therefore the south tie in point needed to be extended approximately 250 feet south of the plan tie in location and the north tie in point needed to be shifted approximately 300 feet north of the plan location. This change added 2 additional vaults including over-excavation and backfill, additional conduit and trenching. The phase I conduit runs across the new Stander Boulevard from BNSF station 1028 +28 to 1029 +54. The ori ginal plan called out installing one 4 inch RGS Conduit in this location .for ATT. However since the BNSF conduit contained a live fiber an additional 2 .inch RGS Conduit was added to ac- commodate the live BNSF fiber Add the Following New Items to Contract CAG 11 -133: Description: The agree lump sum amount for New Bid Item 141 shall be full and final compensation for all labor, equipment and materials to complete the work including other direct and indirect costs. No further compensation will be allowed. Add Item 141: AT &T and BNSF fiber optic West side relocation revisions By Lump Surn @ $50, 497. 35 ...... :.:..:....:... : ...... :........ : ............................... $50,497.35 Total this Change Order... .................. I ............................................ 0­.... $50;49735 Page 2 of 2