HomeMy WebLinkAboutCO 39 4 *" f (7 Change Order # 039 Contract Number: CAG-11-192 Federal Aid Number: STPUL-CM0167(048) Contract Title: Rainier Ave S(SR 167)—S Grady Way to S 2nd St Change Order Number: 039 Prime Contractor: Johansen Excavating, Inc. _X_ Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications Change proposed by Contractor Endorsed by Surety Consent -, w 1 Contractor Attorney on Fact 2.- /®1- Z0) S— Date Date Original Contract Amount: $16,032,772.44 Current Contract Amount: $17,425,323.21 INco-Mob Amount Contract Sum Shall be Deerean& $156.10 Contract Total After FINAL Change Order: $17,425,479.31 14 Approval Recommended ❑Approval Recommended sident Engineer Date Date Ap al Recommended ed City of Renton— Derek Akesson,PE Xof Robert Hanson,PEaD t'e� //'ILlr Transportation Systems Division Date Representing You are ordered to perform the following described work upon receipt of an approved copy of the change order.- Page rder.Page 1 of 2 C:lUserslarianaV1ppDatalLocahMicrosoftlWindows%Temporary Internet FileslContent.Outlook\3U3VGK7F\Change Order No 39- Cover.doc Change Order #039 4 4 � urn. � + Contract Number: CAG-11-192 Federal Aid#:STPUL-CM0167(048) Date: February 17,2015 Page 2 of 2 THE CONTRACT IS MODIFIED AS FOLLOWS: Backaround Change order#38 attempted to reconcile the bid quantities and the final quantities of the project. However,at the time change order#38 was written the extent of the property restoration could not be known due to the extend PSIPE period. Description of Change The purpose of this Change Order is to reconcile the estimated contract property restoration quantity to the actual values measured and paid for as part of the project. Timeline A total of 0 working days will be included with this Change Order. Measurement&Payment Bid Item A144—property restoration will be adjusted from$66,377.12 to a final quantity of$66,533.22.