HomeMy WebLinkAboutCO 34 J•I Change Order #034 Contract Number: CAG-11-192 Federal Aid Number: STPUL-CM0167(048) Contract Title: Rainier Ave S Improvements Change Order Number. 034 Prime Contractor: Johansen Excavating X Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications — Change proposed by Contractor Endorsed by Surety Consent ,///� I/ &1100--- Contractor Aftomey on Fact Date Date Original Contract Amount: $16,032,772.44 Current Contract Amount: $16,837,804.30 Estimated Net Change This Order: $80,700.00 Estimated Contract Total After Change: $16,918,504.30 If(Approval Recommended 0 Approval Recommended J�u.,— �---- cient Engineer Date ..� /7 Date Approval Recommended ed City of Renton—lPrgi9sWAaoagwAlawe] (�2 Jl atiPityof Renton—Ro son,PE `� a Transportation Systems Division Date I Representing You are ordered to perform the following described work upon receipt of an approved copy of the change order. Page 1 of 2 }\Rainier Ave Fqe structure170o Construction Admin-Project Contro4\715 Change Orders1715 2 Individual Change Orders\715.2,034 CO 034 Roadway ExcavahonlChange Order No 034 Cover-Roadway Excavation docx t . Change Order #034 Contract Number: CAG-11-192 Federal Aid#:STPUL-CM0167(048) Date: September 10, 2013 Page 2 of 2 THE CONTRACT IS MODIFIED AS FOLLOWS: Background Roadway Excavation and Haul are per 2-03.4 of the 2010 WSDOT Standard Specifications and as supplemented by Special Provision 2-03.4.The supplemented specification allows for the quantity of earthwork to be recalculated should discrepancies be found during the course of the project. Per the Special Provision:"If discrepancies are discovered in the ground elevations which will materially affect the quantities of earthwork,the original computations of earthwork quantities will be adjusted accordingly". The original KPG(design engineer)roadway excavation calculation excluded estimated totals of petroleum and solvent contaminated soils from the total roadway excavation of 18,500 CY. Since that time,the petroleum and contaminated roadway excavation numbers have become known and have been calculated to equal 288 CY. In a meeting held on April 24, 2013,The City,engineering team,and the Contractor agreed that Bid Item A33 should be revised to exclude actual quantities of roadway excavation portions of Bid Items A36 and A37. Therefore,the roadway excavation total has been recalculated to exclude the actual amount of petroleum and solvent contaminated material(288 CY)in the roadway excavation area and a new total of 18,212 CY has been determined. Additionally,the private planter strip separating the McLendon's parking lot and City sidewalk was altered at approx.STA 34+50,RT to STA 37+00,RT by the property owner between the design and construction phase. This modification consisted of the addition of mounded material in the area specified. A portion totaling 154 CY of this material is required to be removed to allow for the project's per plan construction. Description of Change The total cubic yard total for Roadway Excavation,including Haul,for Bid Item A33 shall be revised to account for existing conditions present at the time of construction and actual roadway excavation quantities of petroleum and solvent contaminated materials New Material No new material shall be incorporated into the project via this Change Order. Timeline A total of 0 additional working days will be included for this Scope of Work. Measurement&Payment Measurement and Payment shall be made by the following: Bid Previous Qty. Unit Item Description Unit Qty. New Q Chane I Price I Change Amount A33 Roadway Excavation Incl Haul CY 15,366 18,366 3000 $26.90 $80,700.00 Total ADD To Contract: $80,700.00