Loading...
HomeMy WebLinkAboutCO 32 ` Change Order #032 ..� 0 fr� Contract Number: CAG-11-192 Federal Aid Number: STPUL-CM0167(048) Contract Title: Rainier Ave S Improvements Change Order Number: 032 Prime Contractor: Johansen Excavating X Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications _ Change proposed by Contractor Endorsed by Surety Consent w Contractor Attorney on Fact Date Date Original Contract Amount: $16,032,772.44 Current Contract Amount: $16,786,970.24 Estimated Net Change This Order: $35,970.44 Estimated Contract Total After Change: 516,822,940.68 Approval Recommended ❑Approval Recommended — — esident Engineer Date Date Appr I R- ecomgMnde ed City of Renton—[PtejeCt'ptgtl� tllr�t., *eu�/PF ty of Renton— o nson,PE Date * dt//VMS Transportation Systems Division Date �(� Representing You are ordered to perform rhe following described work upon receipt of an approved copy of the change order. Page 1 of 3 kiRa+nier Ave File Swcturet700 Construction Admin-Protect ControV 15 Change Orders1715 2 Individual Change Ordersi7152 032 C0032 Landscaping RevisionslCharge Order No 032 Cover-Landscap rig Revis ons doex Change Order #032 = Contract Number: CAG-11-192 Federal Aid#:STPUL-CM0167(048) Date: September 3. 2013 Page 2 of 3 THE CONTRACT IS MODIFIED AS FOLLOWS: WORK TO INCLUDE Background Due to existing field conditions of private property improvements,there were many areas created that could not have been addressed in the landscaping plans. These"blank"areas posed a risk to the long term erosion control prevention of the corridor. Additional planting and stabilized ground measures were added to mitigate that risk. In an overall effort to reduce ongoing maintenance costs of the corridor,seeded lawn areas were deleted and replaced with planting areas. Description of Change Additional planting areas shall be added per the attached drawings from RFP#25,Rev.3. Landscape shrubs and groundcover in non-irrigated areas shall be"pit planted" such that the soil will be loosened three times the root spread of the plant,slow release 16-16-16 fertilizer added per manufacturer's recommendations,and backfilled with soil removed from planting hole. Areas originally shown as seeded lawn that now receive planting per the attached drawings,shall retain the 2"of Top Soil Type A called for in the plans. All planting areas shall receive 2" of bark or wood chip mulch. Change Order 015 included thirteen (13)Magnolia"Galaxy"and seven(7)Acer ginnala in the Contract quantities.These trees shall be provided and installed by the Filterra manufacturer,and these quantities shall be deleted from the Contract. Material Mahonia Nervosa shall be 1 gallon sized plants placed in a 24"O.C.typical triangular spacing pattern. Rosa Rugosa shall be 2 gallon sized plants placed in a 36"O.C.typical triangular spacing pattern. Plans/Reference RFP#25, Rev.3—Planting Revisions—Sheets 30,294-304—Dated 8/27/13 by KPG Specification No specifications were added or revised as a result of this Change Order. Timeline A total of 0 additional working days will be included with this change order. Measurement&Payment Summary of Quantity Change and Added Bid Item: Total Contract Value Change Bid Previous NewQty. Item Description Unit Qty. Qty. Change Unit Price Change Amount Alli Bark or Wood Chip Mulch CY 289 404 115 $28.90 $3,323.50 A112 Seeded Lawn Installation SY 1,867 392 -1,475 $0.50 ($737.50) A119 PSIPE Acer Ginnala EA 10 3 -7 $273.00 ($1,911.00) A120 PSIPE Magnolia Galaxy EA 16 3 -13 $343.00 ($4,459.00) A263 PSIPE Amelancher Laevis'Cumulus' EA 0 12 12 $342.00 $4,104.00 A264 PSIPE Cistus x Purpureus EA 0 1 8 1 8 $26.98 $215.84 Contract Number: CAG 11-192 i Change Order No. 33 STPUL-CM0167(048) 3 PSIPE Euonymus Japonicus'Miceophyllus A265 Variegatus' EA 0 36 36 $26.12 $940.32 A266 PSIPE Rhododendron'Ramapo' EA 0 31 31 $31.23 $968.13 A267 PSIPE Ophiopogon Japonicus EA 0 560 560 $12.20 $6,832.00 A268 PSIPE Erica Cinerea'C.D.Eason' EA 0 205 205 $10.80 $2,214.00 PSIPE Prunus Laurocerasus'Mount A269 Vernon' EA 0 220 220 $12.09 $2,659.80 A270 PSIPE Cotoneaster Dammed'Eichholz' EA 0 375 375 $11.74 $3,900.00 A271 I PSIPE Calluna Vulgaris'Firefly' EA 0 515 515 $11.65 $5,999.75 A272 PSIPE Rosa Rugosa EA 0 215 215 $22.34 $3,973.20 A273 PSIPE Mahonia Nervosa EA J 0 525 525 $12.60 $5,292.00 TOTAL: $35,970.44 Total DBE Subcontractor(Out West Landscape and Irrigation Inc.)Portion of Change Bid Previous New Qty. Item Description Unit Qty. Qty. Change Unit Price Change Amount A111 Bark or Wood Chip Mulch CY 289 404 115 $28.90 $3,323.50 A112 Seeded Lawn Installation SY 1,867 392 -1,475 $0.50 ($737.50) A119 I PSIPE Acer Ginnala EA 10 3 -7 $273.00 ($1,911.00) A120 PSIPE Magnolia Galaxy EA 16 3 -13 $343.00 ($4,459.00) A263 PSIPE Amelancher Laevis'Cumulus' EA 0 12 12 $330.00 $3,960.00 A264 PSIPE Cistus x Purpureus EA 0 8 8 $26.50 $212.00 PSIPE Euonymus Japonicus'Miceophyllus A265 Variegatus' EA 0 36 36 $25.10 $903.60 A266 PSIPE Rhododendron'Ramapo' EA 0 31 31 $30.75 $953.25 A267 PSIPE Ophiopogon Japonicus EA 0 560 560 $11.75 $6,580.00 A268 PSIPE Erica Cinerea'C.D. Eason' EA 0 205 205 $10.50 $2,152.50 A269 PSIPE Prunus Laurocerasus'Mount Vernon' EA 0 220 220 $11.85 $2,607.00 A270 PSIPE Cotoneaster Dammed'Eichholz' EA 0 375 375 $11.30 $4,237.50 A271 PSIPE Calluna Vulgaris'Firefly' EA 0 515 515 $11.35 $5,845.25 A272 PSIPE Rosa Rugosa EA 0 215 215 $19.95 $4,289.25 A273 PSIPE Mahonia Nervosa EA 0 525 525 $11.25 $5,906.25 TOTAL: $33,862.60 N coc ■ o � N R UP o L � I11.110, ftp L.6 d � ! ! 1 e h o ca LUG 00+11 ris An HM" 1 a d LU ) ( yy L ) � h LL r � V • W 1 s r A a � to C�g v �YID b WG�YwAy I A 3 S / ! /+ e s iY I i _._ ___________ _a I Im N cs zioelclm to)osasseol)=an\�+•naVas3o1-r wox asswl�M7elu�raiA■ Ell M1, 610colooll O O W 0 0 VA � �� �► m co egg � afr cc ba iL LK � Q CL LL od ra IM a+►z vis Sri Nlvn Ef 'x'r t m E � a � i s � o a m � . tA Hill Ill t ' J t t F Y I t i t ag 4 "d VG4 Z10000,bw'W57 wlc\tn4-rA9k"wo\ooG 0\"v+"v-mw\NmH3ID\SL13vw\1 aso COMM a _ N x+. 11 ie h, r 1 . 'i "I"I p M a " a %INNsP% Ln 9L ON mss x+tt rls 3161 H2LVW ° a cc Lqj 1 C 1 i m d co P t y ■ � Y r 1 ,P S ' . ail y f 99 O f II Y w 3 t 1({yt 1 ' a , t ' J P k7rhr � i w vs+z,ot/t/m dv asnsstol,aa�nl r�x�63u�•r+tee-assolroix3MsParoeel r M N ■■ tow P4Do gg 94y 4 pl �s� to 0. M { 1A CA < le ^4Cl- � R " p X000 © ® IOC 13s OOMC Y15 3w1 a so � t ' 1 a U , t 1{ F '1 1 � , i I I 4 k� , I 1 e , I 111 I I I 1 1 i 1 I I 1 Y i 3N A.._.... yj T x !il Id Nil,9 pyi■ � c� y sf. aaz IBM Os+cc VIS w roM" na q axle/ot e•n losiassvolF�nw�\•a••,o\als�a\•v.�e-asswVw na\suroad m coo 4Q9W � a CL LL cc y ® . O IF N 4 aW N � Z LDC MG Wit vis Dn lft ^ Ca a s r 1 1 3 t �rl L y 1 g9itD; , � c 1 1 gg a t r1 N „ 1 4 1 3 t 1 t � a Q It � x 9 r 1 � , t I 4 I yl i . 1 � a aot i3�15 ao+g vu inn burn � na IS ZIOZ/t/Ot 6"tcsasssoU�a�rialro��r+ n•osswlrlmllw�u�vnxA+ en N c cu 4 4 o m cu u; O 0 4 g d ru LUa a o � i o I � � ,r I , I � J 1 � i ' I { I j r R L ( 3 l ?$ Z 1 ¢ 1 t f � I I • j S 1 I #Ir7P I i 1 7 1 t i UN Lj*a ao+a vis atnfMOM � H ne IS ZiWc/ol sw n CL • � a �� N p< cc O F Lr ive' Q �a 11 LL - ad a r J t ' }I y•� 42 P o `�,• CO i 1 f � : I � 1 I. °Ojai � 3 Sts W me ups oo+v►vu am Kuvn y TTM na sc'�t�ot/Uoi 6w wsnssSoWW°nn�.�+..+c�rn�C��r�a-as�olwaK7iA5uT0ed�>, t a Mei co 44 x� E of y �� , wfifilMf ; 1 as cr tka Iwo IM I of 1221 14lbl � 1111 19 loll ill I �' �E � � ��� ! aN w ♦ A • « r �n C EEE I E E E � E g9� LL 6 rf, N ■K yi 9i " list� Ea, k k M i ■ J w a kNlakkkk �� 9 81111 1 0 2 . C alp VON Is ��` q •� �a � �# ��� � t o� 6EEE0 cc a� : jib 4 d gla 7EEE m; mm k k u Ab kk 1e u ci uj vdai W N yya � 7AN N i � s R@ z ` W uj � o R l R a z o - � g = °` F P P S R R r- 0 R R t 8 it M X R tLU E 8 8 S J S J Fol EG O ne x r uozJtlai ero wsncssoVan�t* aa\rgsl�i«rx-nCnoUntK3e\s�loeA■ }a� � a 00 cr bft t; R id' 04 I aLn ; ecc 4 a d liIjd j tiff m w b _ n CS hol� r a m ziai rinVaJ.cvsolw+A��resM.+v�nw-asacl��,-�su�w8,r