HomeMy WebLinkAboutAddendum - 3
!"## ! # $% &'#&"( ("$)*(')*+,+,+
-(.*$. / $0
-*"! $"$10 2-*34(0-$5"$6'$-%-&)%"#&"#-"$$$% 12"$(')$34
(0-$5"$ "#&"#-"$ 0 -* $ 0 "$(')$ # # ! ## " %")) %-7 )* -$ 0-(
6 $6 $(0 2#- ( 3$% !'))* 8 %' .*0 #- (0-(6 $6 $-( !! %-7 (
"!0 )( (-5$ .*."0&#- (
0 # (0 -* $55 0 ( #7-% ("!0 "$(')$'$ #5# 6 $++9:;
'$ 9+,++"&#"7- $ % ((#*( #7-% (!"#0 $"$#-)"$$ %"#'#$ 7 - /)<
-)-- ( &)% 6 $#"= %1# ! ## "0 # -$(0 25# 6 $34
0 # (0 #- (/-(0"6 $0 5# 6 $"%0$5 0 (%"& "!/"#<$%0$5 0
%"6& $(-"$-$"# #"-$%"#&"# (# )-50 (-5$%0$5 -$0 !-$)&)$(!"#0
'#$ 7 - /)<-)-- ( &)% 6 $#"= %
-(6''))*5# '&"$0++9:;-(6 $ (!"))"/(>
> %-"$9%"& "!"#<-(6 $ "/"#<((& %-!- -$80-.-
/0-%0-(%0 $-$%"#&"# 0 # -$
> %-"$?"6& $(-"$-(6 $ ("00 68-6'66"'$"!
%"6& $(-"$&*.) ""$(')$-(-$%# ( .*@;AA; ,,!#"6@99?
B, ,,"
@9+9:9; ,,&)'($*&&)-%.) ( $)"%)() (8 ( 0 --"$)%"6& $(-"$
(0)). &-.( '&"$"#<%'))*& #!"#6 %%"#-$5"0 # 1(4"#6"'$(
(& %-!- -$80-.-
/0-%0-(%0 $-$%"#&"# 0 # -$
)) #6("!0 5# 6 $$" 8&)-%-)*6"-!- 0 # -$(0))# 6-$-$!'))!"#% $
!! %$('%0 #6((0))&&)*""#<& #!"#6 %%"#-$5"0-(6 $6 $(-!
!'))*( !"#00 # -$
'ͲϮϮͲϭϵϳ͕ĚĚĞŶηϯͲϮϯ
8/17/2023
Approved by Patrice Kent via email 7/24/2023
615 Second Avenue, Suite 280
Seattle, WA 98104
206.223.0326
www.migcom.com
Contract Amendment #3
July 13, 2023
Exhibit A - Scope of Work
Burnett Ave S Sidewalk Retrofit, S 4th St to S 5th St
This contract amendment includes a new Task 9 for the Consultant to incorporate City directed
changes for the type and locations of street lighting and to update the February 2023 draft Bid Set
PS&E documents for the Burnett Ave S Sidewalk Retrofit project. The city has provided a PDF with
the layout and written proposed light pole type that the Consultant will incorporate into the plan set.
Task 9: Lighting Revision - Coordination, Review and AutoCAD Drafting $7,557
This task includes time for the consultant to:
x Coordinate with the City and project team to incorporate the new lighting locations into the
final bid set.
x Draft in AutoCAD the City’s lighting design and revise the location of the storm drain curb
discharge shown in the plans.
x Update project special provisions and cost estimate to reflect the revised lighting design.
Assumptions:
x Plans will be updated with relocated light pole locations provided by the City.
x Changes to civil plans are limited to updating the background to incorporate the revised
lighting locations and modifying the alignment of the storm drain curb discharge shown at Sta
1+80.
x Lighting analysis will not be conducted per City's direction.
x Wiring Schedule and Schematic will be updated to reflect the changes.
x Pole and fixture schedule will be updated to reflect the changes of location, pole, foundation,
luminare type, and mounting height.
x Specification will be updated to reflect the changes.
Deliverables:
x Updated PS&E documents
EXHIBIT A-3
7/14/2023Exhibit B - MIG Fee Determination WorksheetProject: Burnett Ave S, S 4th St to S 5th St - Lighting RevisionsTask TotalsPrincipalSenior EngineerEngineer VI Engineer V Engineer IILandscape Architect VLandscape Architect III CAD TechOffice ManagerBilling Rate74.52$ 73.56$ 60.58$ 50.96$ 44.71$ 67.00$ 38.00$ 41.35$ 47.13$ Task 9: Update - Coordination, Review and AutoCAD DraftingProject management and Coordination with City and Concord0.5 1Update lighting background, revise curb discharge, and replot22Update replot project manual and cost estimate with Concord changes0.5 1MIG Task Hours7.0 - 1.0 - - 4.0 - - 2.0 - MIG Task Labor Dollars335.10$ -$ 73.56$ -$ -$ 178.84$ -$ -$ 82.70$ -$ MIG Task Fee (DSC + OH + FF)997.46$ Direct Salary Cost (DSC) = 335.10$ Overhead Cost (167.66%) = 561.83$ (% of DSC)Fixed Fee (30%) = 100.53$ (% of DSC)Subtotal =997.46$ Total MIG Direct Salary Cost = 998.00$ Subconsultant (Lighting - Concord) 6,130.00$ Total subconsultant markup (7%) 429.00$ Contract Total = 7,557.00$ 1 of 1EXHIBIT B-3