HomeMy WebLinkAboutCO 22 J 1
Change Order # 022
Contract Number: CAG-11-192 Federal Aid Number: STPUL-CM0167(048)
Contract Title: Rainier Ave S(SR 167)—S Grady Way to S 2nd St
Change Order Number: 022
Prime Contractor: Johansen Excavating,Inc.
_X_ Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications
Change proposed by Contractor
Endorsed by Surety Consent
Contractor Attorney on Fact
2 - 2C,- 20 i3
Date Date
Original Contract Amount: $16,032,772.44
Current Contract Amount: $16,881,239.43
Estimated Net Change This Order: $<96,936.12>
Estimated Contract Total After Change: $16,784,303.31
<LApproval Recommended Approval Recommended
esident Engineer
Z/4f//3
Date T Date
Approv commended ved
.�.k 2
City of Renton— Derek Akesson,PE Aityofnton—Robert Hanson,�PE ae
Transportation Systems Division
Date Representing
You are ordered to perform the following described work upon receipt of an approved copy of the change order:
Page 1 of 3
\\10.21.6.1\data\RainierAve File Structure\700 Construction Admin-Project Control\715 Change Orders\7152 Individual Change Orders\7152.OXX CO West End Culvert\715.2-001
Change Order Cover.doc
L
Change Order #022
Contract Number: CAG-11-192
Federal Aid#:STPUL-CM0167(048)
Date: February 25, 2013
Page 2 of 3
THE CONTRACT IS MODIFIED AS FOLLOWS:
WORK TO EXCLUDE:
Background
The condition of the box culvert running beneath the intersection of Rainier Ave S and Sunset Way was not fully understood
at the time of bid.Further investigation raised concerns with the Contactor and these concerns were acknowledged by the
City of Renton regarding the potential structural and settlement impacts that could occur when performing the cleaning work
as specified within the contract under Bid Item A94.
After review,the City determined that the potential risks to achieve cleaning of the structure without structural impacts were
outside the scope of the project. In addition,the decision was made that a full redesign to minimize the risk of such impacts
would include critical path extensions and project delays,significantly increasing the timeline of the project,making this
option impractical.
The work associated with the cleaning of the 30"storm drain under Rainier Ave S.and S.Grady Way, per Bid Item A94, has
also been removed from the Contract. Upon review of this scope of work,it was determined that the drain line is to be
abandoned and filled per the Contract Documents.Therefore,cleaning the storm drain line at this section of the project is not
necessary and once filled and abandoned per Bid Item A24,the City will still be provided the same end product upon
completion.
The revision of the Bid Item 94"Cleaning Existing Drainage Structure"eliminates the purpose for the west end box culvert
modification(Bid Item 91),which was primarily designed to provide access to the culvert for cleaning. Therefore,this work
was eliminated as well.
Description of Change
Delete the following the following scope of work:
• Cleaning the 8-foot by 10-foot box culvert beneath Rainier Avenue S at Sunset Way(approximately 180 LF,Sediment
1-2'deep).
• Box culvert modifications,west end,shall be as detailed on the Plans and in accordance with the requirements of
Section 6-02 of the Standard Specifications and the Special Provisions.
• Cleaning the 30-inch storm drain under Rainier Avenue at Grady Way(approximately 210 LF,Sediment 1-2'deep).
Add the following scope of work:
• Connect the storm lines from structures 140 and 95 to the existing structure of the box culvert at approximately STA
46+26, 129.63 LT,per Specification Section 7-05.3(3).
Material
No new material will be incorporated into the project as a result of this change order.
Plans/Reference
Rainier Avenue South(SR167), Plan Sheet 104,dated 10/3/2012,by KPG
Rainier Avenue South(SR167), Plan Sheet 113,dated 10/3/2012, by KPG
Specification Section 7-05 and 7-07.
0
Contract Number: CAG 11-192
STPUL-CM0167(048) 3
Timeline
A total of_0_working days will be deleted by this Change Order.Adjustment to Contract duration will be per Serial Letter 012
(SL 012)and compensation for any additional days shall be via a forthcoming Change Order.
Measurement&Payment
Measurement and Payment shall be made by the following:
WE
fire
hange
Y �.
Chan ang a Un�tPrace,� , Amount ,
A86 Connection to Existing Drainage Structure EA 11 13 2 $700.00 $1,400.00
A91 Box Culvert Modifications,West End LS 1 0 (1) $70,700.00 ($70,700.00)
A94 Cleaning Existing Drainage Structure LS 1 .0303 0) $28,500.00 ($27,636.12)
Tota redit To Contract: ($96,936.12)
•
CONSTRUCTION
MANAGEMENT
2/22/13
Mike Dysert
P.O. Box 674
Buckley,WA 98321
Project: Rainier Ave.S. (167) Improvement,S Grady Way to S 2"d St
Subject: Time Impact Reconciliation
PW#: CAG-11-192
Fed Aid#: STPUL-CM0167(048)
Doc#: SL 012
Dear Mr. Dysert,
The purpose of this letter is to summarize the time impact issues, correspondences, and meetings that have
occurred throughout the life of the project.
• Per SL006, an additional 3.5 days will be added to the contract due to unanticipated force account
work.
• Per SL006, an additional 2.5 days will be added to the contract due to work extension.
• Per SL009, an additional 7.5 days will be added to the contract due to unanticipated force account
work.
• Per SL 011, an additional 6.5 days will be added to the contract due to work extension.
• Per the 2/18/13 schedule analysis meeting, no work days will be deleted from the contract as part of
the"west end culvert deletion" change order.
• Per the 2/18/13 schedule analysis meeting, no time impacts will be requested or granted arising from
unanticipated erosion control work performed to date.
• Per the 2/22/13 schedule analysis meeting, six work days will be deleted from the contract as part of
the"CTS roadway section" design change.
• Per the 2/22/13 schedule analysis meeting, no alteration in contract days will be made in relation to
the"concrete crosswalk deletion"change order.
• Per negotiations that occurred.on 1/23/13, the compensation for an unanticipated force account work
day will be at a rate of$603.41 per day and will contain all project costs associated with the
extension of the project not covered by traditional force account markups. The compensation for a
•
2/22/2013
work extension day will be at a rate of$2500.66 per day and will contain all costs associated with the
extension of the project.
Sincerely,
Nathan Monroe,PE
Resident Engineer
cc: Bob Hanson,PE-Transportation Design Supervisor,City of Renton
Derek Akesson, PE—Project Engineer,City of Renton
File
2
IWY S C o �
o
gsx 55A F5
b � ssa � a m m N
{w"• Pi °� < ^� R �m N�g8 V`1 Z —
$ 33asg
z h =1v A mg NN
pig g-
op NVA ' �a
i sH ss 3o aea.t �� aaa9 m sam< N
w a
z
soi��oo+zl vu rm wivn o
z 9a z w
€
`a '. o c o
CL
Z Q , .. _ I ^ . W �\. I ♦ � �� _ rye
LU O -
.. --- ------ -----
LLI
I _
w
se Hirt
wa a H
-:- 3
w oZS
Ix
cc
_ w _
m
I
W
--
I: cc I � Q �
�+ o
g
m co:s CIOU l/1 6.D'SNYIF,ontll_'M90\SDNVAVN\aa+O\nr saw axs ZI-u-s\-P--a-mo\saysj\s6r,-wO\wis30\"Y P�woa-ass90\r+oiwa�s���roaa\>,
ff € y a m ' w LL
gg �'= bbd ffi_g o
d g w _ a� m <g N
In
t9 G O
R
07 N
W Ig�gS LAS-• � _x +1
ma zd�
J
W
2 �- O
of 1 1 / .. Y F'• Z �. S .°}.
- a Ila
LU
r / NOS I , 1 = -t •-�-- o �b $ v �
i I
Fo
_-_ y
C3 7g
it
Z g 9 a
W
Zll MHS OO+S►ViS W FMVM g OOO^OOOOO
6
Y"0:9 fIOVIL/I 6"75W-f-IDK 1575590\MNN1Ytl0\a&o\TN s331J akJ -,A0,q ,a\Nq,s3a\-w-m-j-Gm\NO1N3u\s1o3ro8d\:N