Change Order #017
Contract Number: CAG-11-192 Federal Aid Number: STPUL-CM0167(048)
Contract Title: Rainier Ave S Improvements
Change Order Number: 017
Prime Contractor: Johansen Excavating
Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications
Change proposed by Contractor
Endorsed by Surety Consent
-mke
Contractor Attorney on Fact
76/3
Date
Date
Original Contract Amount: $16,032,772.44
Current Contract Amount: $16,897.733.80
Estimated Net Change This Order: $36,645.13
Estimated Contract Total After Change: $16,934,378.93
O-Approval Recommended _...-.._ O-Approval-Recommended..... _... _. .. -----...
Resident Engineer
aIL-114 3
Date Date
App xiyl Recommended PRentoe,-4RoWHAson,Pt City of Renton—[Project Manager Name I at"D e�
zh!s l43 Transportation Systems Division
DateRepresenting
You are ordered to perform the following described work upon receipt of an approved copy of flee chai:ge order:
Page 1 of 3
\\10.21.6.1\data\Rainier Ave File Structure\700 Construction Admin-Project Control\715 Change Orders\715.2 Individual Change Orders\Change Order No 1xx Cover-Hardie and
7th Signal Power.docx
Change Order #017
Contract Number: CAG-11-192
Federal Aid#:STPUL-CM0167(048)
Date: February 11, 2013
Page 2 of 3
THE CONTRACT IS MODIFIED AS FOLLOWS:
WORK TO EXCLUDE;
Background
During the installation for the NE signal foundation on South 7 t street, it was realized that the power for the signal at Hardie
Avenue SW and South 7th Street was being supplied by the existing signal at S.7`h and Rainer Ave S.This was not known at the
time of design or during the bidding process.This connection is not per the National Electrical Code and it was determined
that the connection could not be re-established to the proposed S.7`h St.and Rainier Ave signal per code;which would result
in the traffic signal at Hardie Avenue SW and South 7`h Street to no longer be in operation.This creates a public safety issue
twofold: First, by having electrical system that does not meet code and second,by having existing signalized intersection
potentially being inoperable should the work not occur. In addition,the existing power service box is not per he current City
of Renton standard and therefore needs to be replaced.
On January 18, 2013 the Contractor provided a cost proposal for this scope of work per discussions and meetings with the City
of Renton.
Description of Change
Contractor shall abandon the existing pole mount service at South 7`h Street and Hardie Avenue South and replace with a new
pedestal mount service that meets code.Scope of work is to include coordination and excavation allowing Puget Sound
Energy to supply and install the required transformer vault.After installation of vault and pedestal mount service,Contractor
to restore area to existing conditions.
_. ............
Material-, _..... _....
1 each 100A Service Cabinet
Approximately 10 LF of 2"and 3" PVC conduits
Approximately 100 LF#2 RHW copper wire
Approximately 200 LF#6 RHW copper wire
Timeline
A total of_0_additional working days will be included with this change order.
At this time no time impacts have been realized or forecasted.However, should impacts become realized for this scope of
work due to long lead times for materials or due to Puget Sound Energy installation delays,a time impact analysis shall be
completed to determine the effect on the critical path.
Contract Number: CAG 11-192
STPUL-CM0167(048) 3
Measurement&Payment
Measurement and Payment shall be made by the following:
Hardie Ave&S.7` St.Signal Power
A243 Service LS 0 1 1 $19,762.31 $19,762.31
Service Cabinet—Hardie Ave and S.7` St.
A244 Signal Power LS 0 1 1 $12,555.93 $12,555.93
A14 Flaggers and Spotters HR 12,600 12,636 36 $45.00 $1,620.00
A31 Sawcutting SF 9,867 9,961 94 $3.20 $300.80
A43 Crushed Surfacing Base Course Thl 11,111 11,142 31 $14.55 $451.05
A50 Temporary Asphalt TN 1 3,041 3,047 6 $142.00 $852.00
A215 I Uniformed Police Officer—King County HR 1 420 1 436 1 16 1 $68.94 $1,103.04
Total ADD To Contract: $36,645.13
Total DBE Subcontractor(Amaya Electric)Portion of Change:
s 3ka^'�.t
ON
khan e, ro[#nY
A243 Hardie Ave&S.7`h St.Signal Power Service LS 0 1 1 $18,988.80 $18,988.80
TOTAL DBE ADD: $18,988.80