HomeMy WebLinkAboutCO 13 1 I *:R Change Order # 013 Contract Number: CAG-11-192 Federal Aid Number: STPUL-CM0167(048) Contract Title: Rainier Ave S(SR 167)—S Grady Way to S 2nd St Change Order Number: 013 Prime Contractor: Johansen Excavating, Inc. _X_ Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications Change proposed by Contractor Endorsed by Surety Consent Contractor Attorney on Fact //— -2p !2 Date Date Original Contract Amount: $16,032,772.44 Current Contract Amount: $ 16,346,928.67 Estimated Net Change This Order: <$1,056.88> Estimated Contract Total After Change: $16,345,871.79 ZApproval Recommended ❑Approval Recommended sident Engineer /I/6& Dai e Date Approval ecommended 94�11 ed 'Aat �� City of Renton— Derek Akesson,PE ity of en n—Ro son,PE 1(116/I L Transportation Systems Division Date Representing You are ordered to perform the following described work upon receipt of an approved copy of the change order. Page 1 of 1 \\10.21.6.1\data\Rainier Ave File Structure\700 Construction Admin-Project Control\715 Change Orders\715.2 Individual Change Orders\715.2.003 Change Order 003\CO 003a Change Order Cover.docx i L i a Change Order 013 Contract Number: CAG-11-192 Federal Aid#:STPUL-CM0167(048) Date 11/1/2012 Page 2 of 2 THE CONTRACT IS MODIFIED AS FOLLOWS: This Change Order provides an adjustment to the"Estimated Contract Total After Change".The adjustment is based on the omitted tax that should have been applied to Change Order 3,which was executed on July 11, 2012. Change Order 003 total credit=<$11,125.00> Washington State Tax @ 9.5%= <$ 1,056.88> Total Adjustment to the"Estimated Contract Total After Change"is a CREDIT of 51.056.88