HomeMy WebLinkAboutCO 08 Y O U � �N O Change Order #008 Contract Number: CAG-11-192 Federal Aid Number: STPUL-CM0167(048) Contract Title: Rainier Ave S Improvements Change Order Number: 008 Prime Contractor: Johansen Excavating _X_ Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications Change proposed by Contractor Endorsed by Surety Consent Contractor Attorney on Fact Date Date Original Contract Amount: $ 16,032,772.44 Current Contract Amount: $16,078,939.49 Estimated Net Change This Order: $4,031.75 Estimated Contract Total After Change: $16,082,971.24 Approval Recommended ❑Approval Recommended Resident Engineer Date Date Ap val Recommended A ed City of Renton—[Project Manager Name I JCity of Renton—Robert Hanson,PE D e e- /0//7 /'—L— Transportation Systems Division Date 7 Representing You are ordered to perform the following described work upon receipt of an approved copy of the change order. Page 1 of 1 \\10.21.6.1\data\Rainier Ave File Structure\700 Construction Admin-Project Control\715 Change Orders\715.2 Individual Change Orders\715.2.008 Change Order 008\Change Order No 8 Covecdoc - Change Order #008 :e Contract Number: CAG-11-192 Federal Aid#:STPUL-CM0167(048) Date: September 19, 2012 Page 2 of 3 THE CONTRACT IS MODIFIED AS FOLLOWS: Background Per special provision section 8-20.2 of the City of Renton's Rainier Ave S Contract,the following items were among those to remain property of the City: • Traffic signal bridge,standards and mast arms(signal bridges) • Luminaire standards and mast arms(luminaires). At the time of bid,the City believed that they had sufficient room in their yard to store all the existing project signal bridges and luminaires. This has since changed and the City can now only receive 2 of the signal bridges and 6 of the luminaires in their yard. In addition, King County requested 10 of the salvaged luminaries from the project. Description of Change Special Provision 8-20.2,Salvaged Material, has been modified to specify that delivery of two(2)of the existing signal bridges and six(6)of the existing project street luminaries shall be delivered by the Contractor to the City of Renton Corporate Yard. Special Provision 8-20.2,Salvaged Material,has been modified to specify that delivery of Ten (10)of the existing project street luminaries shall be delivered by the Contractor to the King County maintenance facility located at 155 Monroe Ave NE, Renton instead of the City of Renton Corporate Yard. Special Provision 8-20.2,Salvaged Material, has been modified to specify that the remaining Twenty(20)existing project signal bridges and Twenty-five(25)existing project luminaries shall become the property of the Contractor and to allow off- haul of this salvaged material. Description of Work Two(2)of the existing signal bridges and six(6)of the existing project street luminaries shall be delivered by the Contractor to the City of Renton Corporate Yard. Ten (10)of the existing project street luminaries will be delivered by the Contractor to the King County maintenance facility located at 155 Monroe Ave NE, Renton,and the Contractor is to notify Rick Thibodeau (206.296.8153) prior to delivery. The remaining Twenty(20)existing project signal bridges and Twenty-five(25)existing project luminaries will become the property of the Contractor. All other salvaged material,as listed in Special Provision 8-20.2,shall be disconnected,dismantled,stacked separately and delivered to the Contracting Agency per the original Contract Documents requirements. Material No new material will be incorporated into the project via this change. Timeline A total of—0—additional working days will be included with this change order Contract Number: CAG 09-125 0 Change Order No. 8 ARRA 0167 (044) 3 Measurement&Payment Measurement for removal and off-haul of salvaged material shall be per each pole. Payment will be made by the following new bid items: Bid, Previous New Qty. T „Estima#ed Change Description Unit Unit Price tY g Amount Item Q City. Chan e Traffic signal bridge,standard and mast A216 arm off-haul EA 0 20 20 $142.30 $2,846.00 Luminaire standard and mast arm off- A217 haul EA 0 25 25 $47.43 $1,185.75 TOTAL ADD: $4,031.75 Total DBE Subcontractor(Amaya Electric)Portion of Change Bid Previous Qty. Change ge`; Esti Amounh ge Item Description Unit Unit Price t ,���,G Traffic signal bridge,standard and mast A216 arm off-haul EA 0 20 20 $127.05 $2,541.00 Luminaire standard and mast arm off- A217 haul EA 0 25 25 $42.35 $1,058.75 TOTAL ADD: $3,599.75