Loading...
HomeMy WebLinkAboutCO 07 Y O . • mL L NT Change Order #007 Contract Number: CAG-11-192 Federal Aid Number: STPUL-CM0167(048) Contract Title: Rainier Ave S Improvements Change Order Number: 007 Prime Contractor: Johansen Excavating _X_ Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications Change proposed by Contractor Endorsed by Surety Consent Y/,- Contractor Attorney on Fact g- 2-7— 2,312 Date Date Original Contract Amount: $ 16,032,772.44 Current Contract Amount: $16,074,647.03 Estimated Net Change This Order: $4,292.46 Estimated Contract Total After Change: $16,079,984.69 Approval Recommended ❑Approval Recommended ._._� esident Engineer 8/1Y-(0, Date Date XApproval Recommended rov City of Renton—Derek Akesson,PE o Renton—hoberteffsoA,PE Oat V2_Vj L_ Transportation Systems Division Date Representing You are ordered to perform the following described work upon receipt of an approved copy of the change order. Page 1 of 3 W 0.21.6.1\data\Rainier Ave File Structure\700 Construction Admin-Project Control\715 Change Orders\715.2 Individual Change Orders\Change Order No 007 Cover-Temporary Camera Mounts&Wood Strain Poles.docx Change Order #007 �I i � ter_ Contract Number: CAG-11-192 Federal Aid#:STPUL-CM0167(048) Date:August 22, 2012 Page 2 of 3 THE CONTRACT IS MODIFIED AS FOLLOWS: Background The following changes were requested for the traffic signal system on the Rainier Ave S Project: 1. The Contractor's subcontractor,Amaya Electric,proposed the use of wood poles for the temporary strain pole in lieu of the steel strain poles. 2. Increase the size of the temporary camera mounting brackets from the originally specified 6 inch tube Pelco Astro- Brac Extended Tilt and Pan mount with cable mount and to a 72 inch tube Pelco Astro-Brac Extended Tilt and Pan mount with cable mount to provide better corridor traffic control during construction.This would be a change in materials only;the scope of work would remain the same. Description of Change The contract documents specified that a Type V strain pole be utilized for the temporary signalization during construction of the permanent traffic signal system.The City has approved the use of the wood poles for the temporary strain pole.The City saw this change as a benefit as it will allow for the temporary system to remain functioning while the commissioning of the permanent system takes place. In addition,this change will insure the permanent system is tested and functioning prior to the removal of the temporary system.This is a no cost change to the Contract. The City of Renton directed that 6"camera mounting brackets to be installed and used on the temporary traffic signal systems.The longer 72"mounting brackets would be used on the temporary traffic signal systems,while the original specified 6"camera mounting hardware would be utilized on the permanent traffic signal system.This is a material only change to the Contract. Description of Work Contractor to provide and install a wood strain pole on the eastern corner of Rainier Ave S and S 7th Street for the installation of the temporary traffic signal.Contractor to provide and install a wood strain pole on the north-eastern corner of Rainier Ave S and S 3`d Place for the installation of the temporary traffic signal.These two wood poles shall be augured into place and cobra head lighting shall be attached. Installation of wood poles shall meet the requirements of the Contract Documents and WSDOT Standard Plans J-15.15-00 and J-15.15.10-00. The Contractor shall install the universal camera mount with 72 inch riser on the temporary traffic signal system as per the Contract Documents direction for the originally specified universal camera mount with 6 inch riser. Upon removal of the 72" camera mounts from the temporary traffic signal system,the Contractor shall return them to the City of Renton's Maintenance Department. Material 72-inch tube Pelco Astro-Brac Extended Tilt and Pan mount with cable mount. Timeline A total of—0—additional working days will be included with this change order. Contract Number: CAG 09-125 Change Order No. 6 • ARRA 0167 044 • 3 Measurement&Payment Measurement and Payment will be made by the following new Lump Sum bid item: Total Contract Value Change Bid Previous New Qty. Estimated Change Item Description Unit Qty Qty. Change Unit Price Amount Temporary Traffic System Camera A218 Mounts LS 0 1 1 $4,292.46 $4,292.46 Deletion of Type V Strain Pole and Substitution of Wood Pole(2 N/A Locations) LS 0 1 1 $0.00 No Cost TOTAL ADD: $4,292.46 Total DBE Subcontractor(Amaya Electric)Portion of Change "Bid Previous New Qty. Estimated Change Item Description Unit Qty Qty. Change Unit Price Amount Temporary Traffic System Camera A218 Mounts LS 0 1 1 $3,832.55 $3,832.55 Deletion of Type V Strain Pole and N/A Substitution of Wood Pole(2 Locations) LS 0 1 1 $0.00 No Cost TOTAL ADD: $3,832.55