0 Change Order #005
Contract Number: CAG-11-192 Federal Aid Number: STPUL-CM0167(048)
Contract Title: Rainier Ave S Improvements
Change Order Number: 005
Prime Contractor: Johansen Excavating
_X_ Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications
Change proposed by Contractor
Endorsed by Surety Consent
Contractor Attorney on Fact
`7 z-
Date Date
Original Contract Amount: $16,032,772.44
Current Contract Amount: $16,044,361.80
Estimated Net Change This Order: $1,330.43
Estimated Contract Total After Change: $16,045,692.23
OApproval Recommended ❑Approval Recommended
,ftkent Engineer
:;01f/t-?—
DA Date
Approv ecommended ved
7
City of Renton—Derek Akesson,PE ity of Re t —Robert Mnson,PE Aate &2
Transportation Systems Division
Date ( Representing
You are ordered to perform the following described work upon receipt of an approved copy of the change order.
Page 1 of 3
\\10.21.6.1\data\Rainier Ave File Structure\700 Construction Admin-Project Control\715 Change Orders\715.2 Individual Change Orders\Change Order No 5 Cover.docx
Change Order #005
Contract Number: CAG-11-192
Federal Aid#:STPUL-CM0167(048)
Date 7/10/2012
Page 2 of 3
THE CONTRACT IS MODIFIED AS FOLLOWS:
WORK TO INCLUDE
Background
After review of the plans and upon field observation, Puget Sound Energy("PSE") directed the installation of 2"
and 3" diameter conduit.The 3" diameter conduit is shown on Plan Sheets 167, 168, and 176,from approximately
STA. 22+50 to STA 25+00, between P50 and transformer P7; however no bid item existed for Contractor payment.
The need to install the 2" diameter, per PSE direction,also necessitated the creation of a bid item for payment of
this size of conduit.
To obtain linear foot pricing for this conduit, RFP 0005,dated June 26, 2012,was issued to the Contractor.The
Contractor submitted unit pricing for these items on July 1, 2012.
Description of Change
The plans indicated 2" and 3"conduit to be installed for PSE during joint utility trench construction. Unit bid
pricing for the installation of 2" and 3" diameter PSE conduit needs to be added to Contract Bid Schedule C in
order to compensate the Contractor for the work performed.
Description of Work
The installation of conduit shall be installed per plan sheets 167, 168,and 176, and meet Specification Section 8-
42.
Material
The approximate quantity of 2" PSE conduit is 20 LF.Actual quantities for payment will be field measured.Conduit
shall be Owner provided.
The approximate quantity of 3" PSE conduit is 250 LF.Actual quantities for payment will be field measured.
Conduit shall be Owner provided.
Plans
No changes to the Contract plans have occurred.
Timeline
A total of_0_additional working days will be included with this change order.
Measurement&Payment
"Install 2" Diameter Conduit—PSE Power" shall be measured and paid per linear foot of conduit installed when
the conduit is furnished by Others.
"Install 3" Diameter Conduit—PSE Power" shall be measured and paid per linear foot of conduit installed when
the conduit is furnished by Others.
Contract Number: CAG-11-192 Change Order No. 005 fo
STPUL-CM0167(048) 3
Change Order Summary of New Estimated Quantities
Total Contract Value Change
Bid Previous New
Item Description Unit Contract Contract Delta Unit Price Change Amount
Qty MY.
Install 2"Diameter Conduit-PSE
C40 Power LF 0 20 20 $4.50 $90.00
Install 3"Diameter Conduit—PSE
C41 Power LF 0 250 250 $4.50 $1,125.00
Subtotal: $1,215.00
Schedule C Sales Tax(9.5%): $115.43
Change Order#005 Total: $1,330.43
Summary of Total DBE Subcontractor(Amaya Electric)Portion of Change
Portion of Unit Original
Bid Previous Contract Value
Item Description Unit Qty- New Qty Delta Price Assigned Assigned to Change Amount
to DBE DBE
Install 2" Diameter
C40 Conduit—PSE Power LF 0 20 20 $4.02 $0 $80.40
Install 3" Diameter
C41 Conduit—PSE Power LF 0 250 250 $4.02 $0 $1,005.00
Total DBE(Amaya Electric)Contract Value Increase;included in the above Change Order#005 Total: $1,085.40
c
• • Re: CAG-11-192
ESCROW AGREEMENT
FOR
CONTRACT BID DOCUMENTS
Ad
THIS ESCROW AGREEMENT is made and entered into this�day of 2012, by and
among the City of Renton, an municipality of the State of Washington, hereinafter called the
"City", and Johansen Excavating, Inc., hereinafter called the "CONTRACTOR", and U. S. Bank,
N.A., hereinafter called the "ESCROW AGENT."
WHEREAS, the CITY and CONTRACTOR entered into that certain Construction Contract dated
March 9, 2012, hereinafter called the "CONTRACT,"for the construction of Work Project Number
STPUL-CM0167(048) under Major Construction Contract Number CAG-11-192 pursuant to which
the CONTRACTOR shall cause the work therein to be constructed; and
WHEREAS, the CITY and CONTRACTOR are desirous of entering into an ESCROW
AGREEMENT, to provide for specific contingencies governing the escrow and control of Contract
bid documentation, hereinafter called "BID DOCUMENTS;" and
WHEREAS, the CITY and CONTRACTOR desire the ESCROW AGENT to hold the BID
DOCUMENTS of the CONTRACTOR;
NOW, THEREFORE, for and in consideration of the mutual covenants contained herein, it is
agreed by and between the parties hereto that:
ARTICLE I
CONTRACT ESCROW BID DOCUMENTATION
The parties hereto agree to the establishment of ESCROW of the BID DOCUMENTS for the.
CONTRACT pursuant to the CITY'S Standard Specifications for Major Construction, and
Supplemental Specifications or Special Provisions pertaining to construction under the contract. It
is the understanding of the parties hereto that the CITY shall pay the ESCROW AGENT, as
determined by Exhibit B, attached hereto, for the ESCROW of the BID DOCUMENTS submitted
to the ESCROW AGENT under the terms of this Agreement.
ARTICLE II
ACKNOWLEDGEMENT
By its signature below, the ESCROW AGENT hereby acknowledges receipt from the CITY and
CONTRACTOR of a sealed container bearing the CONTRACTOR'S name, address and
CONTRACT Number(s) assigned by the CITY and containing the CONTRACT BID
DOCUMENTS.
ARTICLE III
DEPOSIT OF BID DOCUMENTS
At the time the BID DOCUMENTS are to be placed into ESCROW, the CITY shall have the
opportunity to verify that the items submitted are consistent with the CONTRACT requirements
specified in Document Section 1-03.8. The BID DOCUMENTS shall remain on deposit with the
ESCROW AGENT until those conditions of release, as specified in ARTICLE IV"RELEASE
103644 0085OA-1
Rev. 02/17/09
CONTRACTOR:
Johansen Excavating, Inc.
ATTN: Jacob Cimmer
PO Box 674
28215112 th St. E.
Buckley, WA 98321
360-829-6493 (phone)
360-829-5473 (FAX)
ESCROW AGENT:
U.S. BANK, National Association
Attn: Ryan Brennan
14205 th Ave. 7th Floor
Mailcode PD-WA-T7CT
Seattle, WA. 98101
(206) 344-4648
(206) 344-4630 (FAX)
ARTICLE VII
DUTIES OF ESCROW AGENT
The duties and responsibilities of the ESCROW AGENT shall be limited to those expressly set
forth herein and the ESCROW AGENT shall act only in accordance with this ESCROW
AGREEMENT. Notwithstanding specific provisions hereunder, the ESCROW AGENT shall at all
times act upon and in accordance with the joint written instructions of the CITY and
CONTRACTOR.
ARTICLE VIII
LAWS
This ESCROW AGREEMENT shall be deemed to have been executed in King County,
Washington and the laws of the State of Washington shall apply.
ARTICLE IX
ASSIGNMENT
This ESCROW AGREEMENT shall not be assigned without the written consent of all the parties
hereto.
ARTICLE X
SURVIVAL OF CONTRACT
Except as may be expressly modified, all terms and conditions of this ESCROW AGREEMENT
remain in full force and effect. The establishment of this ESCROW AGREEMENT is limited solely
by the contingency of release of the CONTRACT BID DOCUMENTS by the CONTRACTOR to
103644 00850A-3
Rev. 02/17/09
i � •
Exhibit A
ESCROW RELEASE
FOR BID DOCUMENTS
This is to certify that on this day of , the sealed
container identified as:
Bid Documentation
Contractor:
Contract Number:
Project Number:
County:
Date of Submittal:
(Evidenced by Agreement dated ).
was released from ESCROW and personally handed to the below named individual
acknowledging receipt, representing the CONTRACTOR/CITY, by the ESCROW AGENT upon
the presentation of the required documentation pursuant to Article IV, Release From Escrow, of
that agreement dated a copy of such documentation is
attached hereto.
Acknowledgment of Receipt:
Acknowledgment of Release:
ESCROW AGENT
103644 00850A-5
Rev. 02/17/09
To help the government fight the funding of terrorism and money laundering activities, Federal
law requires all financial institutions to obtain, verify and record information that identifies each
person who opens an account.
For a non-individual person such as a business entity, a charity, a Trust or other legal entity we
will ask for documentation to verify its formation and existence as a legal entity. We may also ask
to see financial statements, licenses, and identification and authorization documents from
individuals claiming authority to represent the entity or other relevant documentation.
Dated: April 25, 2012
103644 0085OA-7
Rev. 02/17/09