HomeMy WebLinkAboutCO 03 t` K Y O • C +( + �T° Change Order # 003 Contract Number: CAG-11-192 Federal Aid Number: STPUL•CM0167(048) Contract Title: Rainier Ave S(SR 167)—S Grady Way to S 2nd St Change Order Number: 003 Prime Contractor: Johansen Excavating, Inc. _X_ Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications Change proposed by Contractor Endorsed by Surety Consent Contractor Attorney on Fact Date Date Original Contract Amount: $16,032,772.44 Current Contract Amount: $16,031,524.14 Estimated Net Change This Order: <$11,125.00> Estimated Contract Total After Change: $16,020,399.14 j1 Approval Recommended ❑Approval Recommended ,, �/�A A. Aesident Engineer G��<<z Date Date 1 Approv ecommended ( r ed City of Renton— Derek Akesson,PE ity of Renton—Robert Hanson,PE Date Transportation Systems Division Date 77 rr II Representing You are ordered to perform the following described work upon receipt of an approved copy of the change order. Page 1 ol� IARainier Ave File Structure\700 Construction Admin-Project Control\715 Change Orders\715.2 Individual Change Orders\715.2.003 Change Order 003\CO 003 Change Order Cover.doc -� Change Order 003 Contract Number: CAG-11-192 Federal Aid#:STPUL-CM0167(048) Date 6/20/12 Page 2 of 3 THE CONTRACT IS MODIFIED AS FOLLOWS: WORK TO INCLUDE Background The contract calls for the contractor,Johansen Excavating,to install Comcast utility vaults as designated in the plans. Upon review of the bids,Comcast has decided to install a majority of the vaults themselves. Therefore,these items will be removed from the contract by the City. The project contractor,Johansen Excavating, has designated a portion of this utility work be performed by their DBE subcontractor,Amaya Electric. This owner directed change deletes condition of award DBE work per 1-07.11 of the City of Renton, Rainier Ave S Special Provisions. The City has sent a letter requesting Johansen make a good faith effort to substitute the total dollar value of this work with other DBE COA contractor participation elsewhere in the contract. Description of Work The installation of the Comcast vaults will be deleted from the contract. Material Materials are unaffected due to this change. Plans Plan sheets are unaffected due to the change. Timeline No time impacts are anticipated due to this change. _Measurement&Payment Bid items C29,C30,and C31 are deleted from the Contract Summary of Quantities Total Contract Value Change Bid Original Change Item Qty-Description Unit Previous New Qty Unit Price Contract Value Amount ' Install 2436 Vault— C29 Comcast EA 12 0 $475 $5,700.00 <$5,700.00> Install 17"x30"Vault— C30 Comcast EA 11 0 $375 $4,125.00 <$4,125.00> Install Round Vault— C31 Comcast EA 1 0 $1,300 $1,300.00 <$1,300.00> TOTAL <$11,125> J Contract Number: CAG 11-192 � Change Order No. 3 i STPUL-CM0167(048) 3 Total DBE Subcontractor(Amaya Electric)Portion of Change Portion of Unit Original Change Bid Previous Contract Value Amount Item Description Unit New Qty Price Assigned Qty- to DBE Assigned to DBE Install 2436 Vault— C29 Comcast EA 12 0 $125 $1,500.00 <$1,500.00> Install 17"x30"Vault— C30 Comcast EA 11 0 $125 $1,375.00 <$1,375.00> Install Round Vault— C31 Comcast EA 1 0 $125 $125.00 <$125.00> TOTAL <$3,000.00>