Project Prospectus
DOT Form 140 -101 EF Page 1 of 3 O Previous Editiop"s Obsolete
Revised 11/10
Date
05/21/2013
Prefix Route
Federal Aid
Central Contractor
Proiect Number
CM- 1070(007)
Registration Exp.Date
1/11/2014
Local Agency
`WSDOT1
Federal Employer
Proiect Number
`use only,/
Tax ID Number
916001271
Agency
Federal Program Title
City of Renton
M 20.205 ❑ Other
Project Title
Start Latitude N47'30'8.1"
Start Longitude W122 014'41.8"
Highlands to Boeing/Landing Pedestrian Connection
End Latitude N 47 030'4"
End Longitude W122 °12'2.4"
Project Termini From -- To
Nearest City Name
Project Zip Code
Renton on/off I -405 ram NE Park Dr/Houser Wa N
Renton
98057
From: To:
Length of Project
Award Type
0.34 mi
M Local ❑ Local Forces ❑ State ❑ Railroad
Federal Agency
City Number
County Number
County Name
WSDOT Region
M FHWA ❑ Others
1 1070
17
Kin
Northwest Re ion
Congressional District
Legislative Districts
1
Urban Area Number
1
TMA / MPO / RTPO
1
9
37,41
1
PSRC
Phase
Total
Estimated Cost
Local Agency
Funding
Federal Funds.
Phase Start
Date
Nearest Hundred Dollar
Nearest Hundred Dollar
Nearest Hundred Dollar
Month Year
P.E.
$277,500
$37,500
$240,000
2/2010
R/W
Const.
$1,965300
$265300
$1,700,000
6/2013
Total
$2,242,800
$302,800
$1,940,000
Description of Existing Facility (Existing Design and Present Condition
Roadway Width
1
Number of Lanes
varies - 72 to 110
varies - 4 to 7
There is no pedestrian connection from the Renton Highlands community (east of I -405) to the Boeing manufacturing plant, The
Landing, nearby Gene Coulon Park, the Lake Washington Trail and the Cedar River Trail.
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
The project will construct 1,700 lineal feet of an 8 -foot wide (6 feet on the bridge) pedestrian firndly sidewalk on the north side of
NE Park Drive, separated from the travel lanes by a planter strip, reconstruction of the north railing of a bridge to allow widening,
signal modifications to accomodate pedestrian crossings, pedestrian scale illumination and installation of ADA facilities.
Local Agency Contact Person
Title
Phone
Juliana Fries
Program Development Coordinator
425- 430 -7232
Mailing Address
City
State
Zip Code
1055 S Grady Way
Renton
WA
98057
l�
By
Project Prospectus Approval Approving ,authority
Title Transportation Design Supervisor Date 7 .G',_
DOT Form 140 -101 EF Page 1 of 3 O Previous Editiop"s Obsolete
Revised 11/10
Agency Project Title Date
City of Renton I Highlands to Boeing/Landing Pedestrian 1 05/21/2013
Type of Proposed Work
Project Type (Check all that Apply)
Roadway Width
Number of Lanes
® New Construction ❑ Path / Trail ❑ 3 -R
Description
1
❑ Reconstruction ® Pedestrian / Facilities ❑ 2 -R
Contract
Crossroad
Federal
Functional
Classification
❑ Railroad ❑ Parking ❑ Other
® Principal Arterial
❑ Minor Arterial
❑ Collector
El Major Collector
❑ Minor Collector
❑ Access Street/Road
❑ Bridge
❑ Principal Arterial
❑ Minor Arterial
❑ Collector
El Major Collector
❑ Minor Collector
❑ Access Street/Road
Geometric Design Data
Preliminary Engineering Will Be Performed By
Others
Agency
Consultant
Description
1
Through Route
Contract
Crossroad
Federal
Functional
Classification
® Urban
❑ Rural
® Principal Arterial
❑ Minor Arterial
❑ Collector
El Major Collector
❑ Minor Collector
❑ Access Street/Road
❑ Urban
❑ Rural
❑ Principal Arterial
❑ Minor Arterial
❑ Collector
El Major Collector
❑ Minor Collector
❑ Access Street/Road
Terrain
❑ Flat
® Roll ❑ Mountain
❑ Flat
❑ Roll ❑ Mountain
Posted Speed
35 m h
Design Speed
N/A
Existing ADT
32,000
Design Year ADT
N/A
Design Year
N/A
Design Hourly Volume (DHV)
N/A
Performance of Work
Preliminary Engineering Will Be Performed By
Others
Agency
Consultant
99 %
1
Construction Will Be Performed By
Contract
Agency
Contract
100 %
%
I Environmental Classification I
® Final ❑ Preliminary
❑ Class I - Environmental Impact Statement (EIS)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreement
❑ Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreement
Environmental Considerations
ECS signed on 3/18/13
® Class II - Categorically Excluded (CE)
® Projects Requiring Documentation
(Documented CE)
DOT Form 140 -101 EF Page 2 of 3
Revised 11/10
lY�>
•
Agency Project Title Date
City of Renton Highlands to Boeing/Landing Pedestrian 05/21/2013
Right of Way
® No Right of Way Required ❑ Right of Way Required
* All construction required by the
❑ No Relocation El Relocation Required
contract can be accomplished
within the existing right of way.
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ® Yes ❑ No
Remarks
This project will have no affect on the airport operations.
This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and
is not inconsistent with the agency's comprehensive plan for community development.
Date
DOT Form 140 -101 EF
Revised 11/10
. -Ajjency City enton
�y
._. ;DDe--nis Law Mayor /Chairperson
Attest'-
' -`Bonnie I. Walton, City Clerk
Page 3 of 3 ♦ Previous Editions Obsolete
COULON PARK
';} r
A.
PROJECT
LOCI T/l ►f
BOEING CO -
tt , � ..; � •r z
LANDING
HIGHLANDS CENTER _
VILLAGE -
URBAN CENTER NORTH
lu
, X
f
x\ >
i r
URBAN CENTER DOWNTOWN
�p� o
HIGHLANDS TO BOEING /LANDING PEDESTRIAN CONNECTION
�� TO V! JMT -Y MAP
�i
i A.,
\ i �
is
�
4
—
y is
r'
-
-- aS2NDST
r
r/
Z
/
Jry r. f
r
HIGHLANDS CENTER _
VILLAGE -
URBAN CENTER NORTH
lu
, X
f
x\ >
i r
URBAN CENTER DOWNTOWN
�p� o
HIGHLANDS TO BOEING /LANDING PEDESTRIAN CONNECTION
�� TO V! JMT -Y MAP
s•;
a 0
V
O
L
a
0
V
d
_
O
.�
_
�L
4a
N
d
a
J
cm
_
C
co
Q co
U
c.i O
N
in N
O
E =
uc•Q as
j .
i
k
1 -
k
R
t
r -,
1.
a 0
V
O
L
a
0
V
d
_
O
.�
_
�L
4a
N
d
a
J
cm
_
C
co
Q co
U
c.i O
N
in N
O
E =
uc•Q as
n
.
o
-
aA
8
\
/ §
§
a
$
§2
$
§
IL
)
C
\k
Qz
w
L)
i S
..
J
¥
`
/
8
4
& b
CD
E
J
\
-
/
ac
0
24�
7
0
%
t
°
2
\
U- j ®
a)
®
°M:
wk
E
.2
2
za
C14
§
2°
&
k
/0
j
/ a
E
°
m
a
®
�E
0
3
±
7
«
m
2
§
§2
/2
t
u
c@
2
@
°
$§o
�2
«
§
p
/
§ a z
M
x
0
2
a
\
z§ t
t\
5
§
\
%
§LOq
7E
�7 w
�c
/
LL
§
Q
o U)
E
_
§
z
\
_
k 0
..
) k
/
(
I LL J
L
\
k\
§
f
§
■
�t
om
7
j�
aƒ
/
§
z
m
a)
}§
a
)
f/
k�
§\
2S
ca
��B
]
°
�I
ca :t,
°
��
^
0/k
\
c
\_
C14
0
(D :3
CL
�f <
k
J §
k
@00
\
n
2
t g
\ §§
)
E
J
0
f k
0§
E
�
a
e
2 .
2
z
° _
0
$
a
J
ƒ
2
/
\
@
£
2��
k
0 o
2
2
0
c
CD
■ £ ®
3
£ ®§
B
�
Qƒ&
E
\gym
%
-
\
) )
w
p
a) m/
E
2 2 3
°
2
%/
'
7
. §
CD
k
_
0 M
IL
0
& --
a) 0)
U
k�
LL
LL\
g
k
//\
k
k
,\
\
/
CL
<
/
\
\
_�
COST ESTIMATE
City of Renton
Highlands to Boeing /Landing Pedestrian Connection
No. Section Description
Quantity
Unit
LS
Unit Price
68 000.00
Amount
BASE BID
PREPARATION
Modified Single Slope Concrete Barrier
161
LF
$
200.00
$
1 -09
Mobilization
1
LS
$
146,000
$
146,000
1 -05
Structure Surveying
1
LS
$
8,000.00
$
8,000
1 -05
Roadway Surveying
1
LS
$
10,000.00
$
10,000
1 -07
SPCC Plan
1
LS
$
2,000.00
$
2,000
1 -07
Utility Potholing
1
EST
$
5,000.00
$
5,000
1 -07
Resolution of Utility Conflicts
1
EST
$
1,000.00
$
1,000
2 -01
Clearing and Grubbing
0.30
AC
$
35,000.00
$
10,500
2 -02
Removal of Structure and Obstruction
1
LS
$
9,000
$
9,000
2 -02
Sawcutting
1,500
LF
$
3.00
$
4,500
GRADING
2 -03
Roadway Excavation Including Haul
1
LS
$
30,000
$
30,000
2 -03
Common Borrow Including Haul
650
TN
$
18.00
$
11,700
STORM DRAINAGE
7 -04
Corrugated Polyethylene Storm Sewer Pipe 12 In. Dia
165
LF
$
50.00
$
8,250
7 -05
Adjust Existing Manhole
9
EA
$
600.00
$
5,400
7 -05
Adjust Existing Catch Basin
4
EA
$
600.00
$
2,400
7 -05
Replace Grate with Solid Rectangular Cover
4
EA
$
500.00
$
2,000
7 -05
Catch Basin Type 1
6
EA
$
1,500.00
$
9,000
7 -05
Connect to Existing Catch Basin
3
EA
$
750.00
$
2,250
7 -05
Connect Structure to Existing Pipe
2
EA
$
750.00
$
1,500
2 -09
Shoring or Extra Excavation Class B
1
LS
$
9,000.00
$
9,000
SURFACING AND PAVEMENT
4 -04
Crushed Surfacing Top Course
130
TN
$
30.00
$
3,900
4 -04
Crushed Surfacing Base Course
600:
TN
$
30.00
$
18,000
5 -04
HMA for Patching CI. 1/2" PG 64 -22
130
TN
$
160.00
$
20,800
5 -04
HMA for Overlay CI. 1/2" PG 64 -22
300
TN
$
100.00
$
30,000
5 -04
Planing Bituminous Pavement
1,900
SY
$
8.00
$
15,200
SIDEWALK AND CURB
8 -04
Cement Concrete Traffic Curb and Gutter
1,240
LF
$
35.00
$
43,400
8 -04
Cement Concrete Pedestrian Curb
100
LF
$
50.00
$
5,000
8 -06
Cement Concrete Driveway Entrance Type 3
25
SY
$
50.00
$
1,250
8 -14
Cement Concrete Sidewalk
1,330
SY
$
36.00
$
47,880
8 -14
Cement Concrete Curb Ramp Type Perpendicular B
2
EA
$
1,500.00
$
3,000
8 -14
Cement Concrete Curb Ramp Type Cut - Through
1
EA
$
2,500.00
$
2,500
TRAFFIC
1 -10
Project Temporary Traffic Control
l
LS
$
68 000.00
$
68,000
6 -10
Modified Single Slope Concrete Barrier
161
LF
$
200.00
$
32,200
8 -09
Raised Pavement Marker Type 1
12.3
HUND
$
450.00
$
5,535
8 -09
Raised Pavement Marker Type 2
1.6
HUND
$
600.00
$
960
8 -11
Beam Guardrail Transition Section Type 20
2
EA
$
1,000.00
$
2,000
8 -11
Beam Guardrail Type 31 Non - Flared Terminal
2
EA
$
4,000.00
$
8 000
H:\ Division. s \TRANSPOR.TAT\PLANNING\Juliana \Highlands to Landing\2013 \Highlands to Boeing_WSDOT.xIs
• 0
Highlands to Boeing /Landing Pedestrian Connection
No. Section Description
Quantity
Unit
Unit Price
Amount
8 -11
Beam Guardrail Anchor Type 10
1
EA
$
2,000.00
$
2,000
8 -21
Permanent Signing
1
LS
$
3,000.00
$
3,000
8 -22
Plastic Stop Line
16
LF
$
5.00
$
80
8 -22
Plastic Crosswalk Line
60
SF
$
3.00
$
180
8 -22
Paint Line
1,830
LF
$
1.00
$
1,830
8 -23
Temporary Pavement Marking
4,100
LF
$
1.50
$
6,150
8 -23
Removing Temporary Pavement Marking
4,100
LF
$
1.00
$
4,100
TESC
8 -01
Inlet Protection
14
EA
$
100.00
$
1,400
8 -01
High Visibility Fence
1,800
LF
$
3.00
$
5,400
8 -01
Wattles
1,300
LF
$
4.00
$
5,200
8 -01
ESC Lead
60
DAY
$
100.00
$
6,000
8 -20
PLANTING
1
LS
$
16,000.00
$
16,000
8 -02
Seeded Lawn Installation
2,000
SY
$
5.00
$
10,000
8 -02
Fine Bark Mulch
75
CY
$
40.00
$
3,000
RETAINING WALLS
8 -24
Rock Wall
610
SF
$
30.00
$
18,300
8 -24
Gabion Wall
1,540
SF
$
25.00
$
38.500
H:\ Division .s \TRANSPOR.TAT\PLANNINGWuliana \Highlands to Landing\2013 \Highlands to Boeing_WSDOT.xIs
STRUCTURES
2 -02
Removing Portion of Existing Bridge 900/23
1
LS
$ 165,000.00
$
165,000
6 -02
Concrete Class 4000D for Bridge
35
CY
$
1,100.00
$
38,500
6 -02
Epoxy Coated St. Reinf. Bar for Bride
7,200
LB
$
1.50
$
10,800
6 -02
Concrete Class 3000 for Bridge Sidewalk
30
CY
$
300.00
$
9,000
6 -02
St. Reinf. Bar for Bridge Sidewalk
1,800
LB
$
1.20
$
2,160
6 -10
Pedestrian Barrier
239
LF
$
185.00
$
44,215
6 -06
Bride Railing Type BP
239
LF
$
125.00
$
29,875
OTHER ITEMS
8 -12
Chain Link Fence Type 4
710
LF
$
40.00
$
28,400
8 -12
Handrail
140
LF
$
80.00
$
11,200
8 -20
WSDOT Roadway Illumination System
1
LS
$
38,000.00
$
38,000
8 -20
City Pedestrian Illum % ITS System - Underground Or
1
LS
$
105,000.00
$
105,000
8 -20
Signal Modifications
1
LS
$
16,000.00
$
16,000
8 -31
Field Office
1
LS
$
16,000.00
$
16,000
.Subtotal Construction Cost - Base Bid
$
1,204,415
Alternate Al
8 -20
City Pedestrian Illum - Poles Fndtns Cabinets and W
1
LS
$ 171,000.00
$
171,000
Subtotal Construction Cost - Alternate Al
$
171,000
Alternate A2
8 -03
Irrigation System
1
LS
$
28,000.00
$
28,000
Subtotal Construction Cost - Alternate A2
$
28,000
Alternate Al
8 -02
PSIPE Deodorus Ceder, 5 gallon
3
EA
$
60.00
$
180
8 -02
PSIPE New Zealand Sedge, 1 gallon
70
EA
$
9.50
$
665
8 -02
PSIPE Forest Pansy Redbud 2 -1/2" Cal.
10
EA
$
300.00
$
3,000
8 -02
PSIPE Isanti Red Osier Dogwood, 5 gallon
103
EA
$
35.00
$
3,605
H:\ Division .s \TRANSPOR.TAT\PLANNINGWuliana \Highlands to Landing\2013 \Highlands to Boeing_WSDOT.xIs
Highlands to Boeing /Landing Pedestrian Connection
No. Section Description
Quantity
Unit
Sales Tax (9.5 %)
Unit Price
138,584
Amount
8 -02
PSIPE Venus Dogwood, 2 -1/2" Cal.
14
EA
$
300.00
$
4,200
8 -02
PSIPE Anouk French Lavender, 1 gallon
46
EA
$
8.00
$
368
8 -02
PSIPE Japanese Spurge, 4" pot
2,900
EA
$
1.50
$
4,350
8 -02
PSIPE Dwarf Mt. Vernon Laurel, 2 gallon
180
EA
$
18.00
$
3,240
8 -02
PSIPE Japanese Spirea, 2 gallon
170
EA
$
18.00
$
3,060
8 -02
PSIPE Snowcone Japanese Snowbell, 2 -1/2" Cal.
9
EA
$
300.00
$
2,700
8 -02
Topsoil Type A
440
CY
$
42.00
$
18,480
8 -02
Fine Bark Mulch
50
CY
$
40.00
$
2,000
8 -02
Fine Compost
45
CY
$
40.00
$
1,800
8 -02
Root Barrier
760
LF
$
6.00
$
4,560
8 -02
Landscape Rock
9
EA
$
350.00
$
3,150
Subtotal Construction Cost - Alternate A3
$
55,358
Construction Cost =
$
1,458,773
Sales Tax (9.5 %)
$
138,584
BNSF (Inspection and Flagging)
$
85,000
Total Construction Cost =
$
1,682,357
Construction Management ( -13 %)
$
212,960
Agency (City of Renton Staff)*
$
60,000
State (WSDOT)
$
10,000
Total Cost =
$
1,965,317
*Estimate for Agency Services
Item
Discipline
p
L
Man
hours
Average Rate
of Pay
Estimated Cost
1
Project Management
961
$ 50
$ 4,800
2
Public Works Inspection
560
$ 45
$ 25,200
Totals
656
$ 30,000
Overhead Cost
100% $ 30,000
Total Agency $ 60,000
H:\ Division. s \TRANSPOR.TAT\PLANNING\Juliana \Highlands to Landing\2013 \Highlands to Boeing_WSDOT.xIs