HomeMy WebLinkAboutCO 4 CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 10-040 STONEGATE LIFT STATION CONVEYANCE C.O.# 4 IMPROVEMENTS CONTRACTOR: SHORELINE CONSTRUCTION CO. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: ITEM Additional Quantities Under This Change Order Unit Quantity Unit Price Total Price 050. NEW ITEM:Additional Potholing to located existing Summerwind Force Main LS 1 $1,355.20 $1,355.20 prior to Directional Drill of new Gravity main(Shoreline EWO#1257, 6-2-10). 051. NEW ITEM:Additional work to mud manhole SSMH 218 due to City initiated LS 1 $1,061.11 $1,061.11 design change.(Shoreline EWO dated 6-15-10). 052. NEW ITEM:Additional work to remove all trees, bushes and other vegetation LS 1 $3,795.13 $3,795.13 from the shoulders of the Stonegate neighborhood secondary fire access road and place compacted crushed rock(Shoreline EWO's dated 6-24-10 for $2,321.66 and 8-2-10 for$$1,473.47). 053. NEW ITEM:Additional work and an additional 55 If of 10" HDPE pipe to LS 1 $18,246.26 $18,246.26 compete the directional drill gravity main from the existing Summerwind Lift Station to the existing sanitary sewer main between City of Renton manholes 5303-317 and 5303-318. (Shoreline EWO dated 9-13-10). 054. NEW ITEM:Additional work to repair failed water valve box.(Shoreline EWO LS 1 $1,473.92 $1,473.92 #1363, 9-13-10). Sub Total $25,931.62 Sales Tax (9.5%) $2,463.50 Total $28,395.12 ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET CHANGE ESTIMATED CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE $875,888.86 $1,114,464.16 $28,395.12 $1,142,859.28 SIGNATURES: Contractor: Date: Project En ' eer: Date: a a Approved By: t Dater, (Utilities(ystem irector) H:FileSys\WWP-Wastewater\WWP-27-3473\CO-4-Stonegate Force Main/JDH