HomeMy WebLinkAboutCO 4 *4%W CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 10-087 STONEGATE LIFT STATION REPLACEMENT C.O.# 4 CONTRACTOR: SHORELINE CONSTRUCTION CO. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: ITEM Additional Quantities Under This Change Order Unit Quantity Unit Price Total Price 071. NEW ITEM:Additional Materials and Work by Advance Power, Inc(electrical LS 1 $3,841.15 $3,841.15 subcontractor)and Systems Interface to reprogram the Motor Control Center and modify the City-supplied telemetry panel to work with the new radio antenna. (Shoreline Construction Co. Invoice dated 2/28/2012) 072, NEW ITEM:Additional Work and materials to upgrade the flexible coupling LS 1 $2,795.43 $2,795.43 adapters in the valve vault. (Shoreline Construction Co. Invoice dated 3/5/2012) Sub Total $6,636.58 Sales Tax (9.5%) $630.48 Total $7,267.06 ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET CHANGE ESTIMATED CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE $1,213,270.95 $1,259,948.96 $7,267.06 $1,267,216.02 SIGNATURES: Contractor: Date: Project E (neer: Date: 3 Z-7 Approved By: Date: (U ie stem rector) H:FileSys\WWP-Wastewater\WWP-27-3473\CO-4-Stonegate Lift Station Replacement/JDH