Loading...
HomeMy WebLinkAboutCO 3 „,N,,, CITY OF RENTON `,,,,,,r Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 10-087 STONEGATE LIFT STATION REPLACEMENT C.O.# 3 CONTRACTOR: SHORELINE CONSTRUCTION CO. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: ITEM Additional Quantities Under This Change Order Unit Quantity Unit Price Total Price 060. NEW ITEM:Additional Work required to install new gravity sewer between LS 1 $8,272.84 $8,272.84 the existing Stonegate wetwell and the new Stonegate Lift Station due to unmarked utilities near the existing Stonegate Lift Station. (Shoreline Construction Co.EWO 1366 at$2,108.56 dated 12/21/2010 and EW01367 at$6,164.28 dated 12/21/2010) 061. NEW ITEM:Additional Work and materials to enlarge the Emergency Generator LS 1 $3,124.80 $3,124.80 Pad to accept the required sound enclosure. (Shoreline Construction Co. Invoice dated 3/26/2011) 062. NEW ITEM:Additional Work and materials to repair the power cable to the LS 1 $572.47 $572.47 Stonegate neighborhood which was not shown on the plans or marked in the field. Shoreline Construction Co.Invoice dated 5/12/2011) 063. NEW ITEM:Additional Work and materials to upgrade 5 bollards for the LS 1 $1,952.09 $1,952.09 Emergency Generator from embedded to removable. Shoreline Construction Co.Invoice dated 6/28/2011 064. NEW ITEM:Additional Work and materials to modify the wetwell handrail due to LS 1 $261.36 $261.36 clearance conflicts with the pumps. (Shoreline Construction Co. Invoice dated 7/01/2011) 065. NEW ITEM:Additional Work and materials to increase the length of the LS 1 $162.18 $162.18 designed French drain system to control groundwater near existing Stonegate Lift Station. (Shoreline Construction Co. Invoice dated 7/01/2011) 066. NEW ITEM:Additional Work and materials to"ground”new chain link fence as LS 1 $2,867.20 $2,867.20 required by Puget Sound Energy. (Shoreline Construction Co.Invoice dated 7/12/2011) 067. NEW ITEM:Additional Work and materials to install new Hot Box with Reduced LS 1 $4,704.36 $4,704.36 Pressure Backflow Assembly. (Shoreline Construction Co. Invoice dated 11/23/2011) 068. NEW ITEM:Additional Work and materials to increase width the of the LS 1 $791.70 $791.70 walkway around the emergency access road gates between the Stonegate and Summerwind neighborhoods. (Shoreline Construction Co. Invoice dated 11/23/2011) 069. NEW ITEM:Additional Work and materials to add additional safety features to LS 1 $2,814.55 $2,814.55 the new Stonegate Lift Station unground structures(safety chains on all hatches and grating at the top of all ladders). (Shoreline Construction Co. Invoice dated 12/06/2011) 070. NEW ITEM:Additional Work req to remove,transport to Systems LS 1 $2,259.12 $2,259.12 Interface Inc.,pick-uovd reinstall existing Rugid panel. Panel needed additional intrinsically safe switches install.Also includes two additional days of coordination with City and Consultant staff. Shoreline Construction Co. Invoice dated 12/08/2011 Sub Total $27,78P.67 Sales Tax (9.5%) $2,639.35 Total $30,422.02 ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET CHANGE ESTIMATED CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE $1,213,270.95 $1,229,526.94 $30,422.02 $1,259,948.96 SIGNATURES: Contractor: Date: Project E reer Date: !2 Z / Approved By: UAl Date: �Z�Z�f r t (Utilities System Director) H:FileSys\WWP-Wastewater\WWP-27-3473\CO-3-Stonegate Lift Station Replacement/JDH