HomeMy WebLinkAboutCO 2 CITY OF RENTON CAG-10-120, Co #2-11 Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 10-120 C.O.# 2 LAKE WASHINGTON BEACH LIFT STATION REPLACEMENT CONTRACTOR: Kamins Construction. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: Additional Items Under This Change Order Working Days NEW ITEM:Additional working days due to revision of the approved 165 motor control panel. The need to send the motor control panel back to PumpTech for modifications caused a delay in the project. This caused the project to extend past key dates when use of the park significantly increases. The City and the Contractor determined that it was in the best interest of both parties to extend the working days of the project to allow the scheduling of work to minimize impacts to the users of the park. Additional Items Under This Change Order Unit Quantity Unit Price Total Price NEW ITEM:Additional work to remobilize due to revision of the LS 1 $2,300.00 $2,300.00 approved motor control panel. As part of the extension of the working days,it was understood that there would be a point where the contractor would move off-site and remobilize back in after the Labor Day Weekend when use of the park lessens. Sub Total $2,300.00 Sales Tax(9.5%) $218.50 Total Additional Work $2,518.50 I ORIGINAL CONTRACT CURRENT CONTRACT ADDITIONAL CONTRACT TOTAL WORKING WORKING DAYS WORKING DAYS WORKING DAYS DAYS AFTER CHANGE 100 100 165 265 ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET CHANGE ESTIMATED CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE $293,060.11 $298,400.24 $2,518.50 $300,918.74 SIGNATURES: Contractor: Date: t I b q 1 it Project Engineer: Date: K —7J r Approved By: Date: ( 'ies ystem Director) H:FileSys\WWP-Wastewater\WWP-27-3557\CO-2-Lk Wash Bch Lift Station Replacement/MB