HomeMy WebLinkAboutCO 1 CITY OF RENTON CAG-10-120, Co #1-11 Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 10-120 C.O.# 1 LAKE WASHINGTON BEACH LIFT STATION REPLACEMENT CONTRACTOR: Kamins Construction. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: Additional Items Under This Change Order Unit Quantity Unit Price Total Price NEW ITEM:Additional cost to upgrade Hot Box HB.75 to Hot Box HB 1 LS 1 $257.43 $257.43 NEW ITEM:Remove and dispose of additional asphalt outside scope of LS 1 $223.00 $223.00 work. Additional removal was to clean up failing asphalt adjacent to the work zone to provide for proper restoration of the parking lot. NEW ITEM:remove existing base and replace with recycled concrete. LS 1 $1,006.69 $1,006.69 The site was prepared for paving. The old utility leaked into an area creating a soft spot that needed to be removed and replaced in order to get the parking lot paved to allow reopening for public access. NEW ITEM:Additional asphalt paving outside scope of work. Additional LS 1 $616.00 $616.00 asphalt paving adjacent to the work zone to provide for proper restoration of the parking lot. NEW ITEM:Additional work to revise approved motor control panel. LS 1 $2,773.71 $2,773.71 Additional work to send motor control panel back to Pump-rech for modifications including costs associated with the time delay while waiting for the return of the panel. Sub Total $4,876.83 Sales Tax(9.5%) $463.30 Total Additional Work $5,340.13 ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET CHANGE ESTIMATED CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE $293,060.11 $293,060.11 $5,340.13 $298,400.24 SIGNATURES: Contractor: Date: Project Engineer: ``'�� Date: Approved By: Date: L/ tem irector) H:FileSys\WWP-Wastewater\WWP-27-3557\CO-1-Lk Wash Bch Lift Station Replacement/MB