Loading...
HomeMy WebLinkAboutAdden 6 NOW CAG —09-170, Adden #6-14 AShk Washingto State W1/ Departnvent� of Transportation Supplemental Agreement Organization and Address KPG,P.S. Number 6 753 9th Ave North Original Agreement Number Seattle,WA 98109 CAG 09-170 Phone: 206-286-1640 Project Number Execution Date Completion Date 0655E 10/5/2009 3/31/2015 Project Title New Maximum Amount Payable Rainier Ave S(SR 167)-S Grady Way to S 2nd St $ 4,238,427.44 Description of Work See attached Scope of Work-Exhibit A-1 The Local Agency of City of Renton desires to supplement the agreement entered into with KPG, Inc and executed on 10/5/2009 and identified as Agreement No, CAG 09-170 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: 1 Section 1, SCOPE OF WORK, is hereby changed to read: , Attgtr.hed Fxhihij AJ for Supplement 06--, p Section IV,TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: L&rcil z Ig ')AI C III Section V, PAYMENT,shall be amended as follows: as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above ase sign in the appropriate spaces below and return to this office for final action. By: n itzier X By: �- Denis Law, Mayor Consultant Signature Approving Authority Signature ATTEST: DOT Form 140-053EF Jason A. Set , acting City Clerk Revised 912005 Exhibit A-1 City of Renton Rainier Ave S(SR 167)—S Grady Way to S 2"d St Supplement No.6(CAG 09-170) Construction Services—Project Oversight and Close-Out KPG Inc Scope of Work A. Project Description The purpose of this supplement is to perform project close-out activities for the Rainier Avenue S Project. These activities include the following: • Continued project oversight and construction documentation support for the remainder of the construction contract. • Preparation, filing, and archiving of the required project paperwork generated during the project oversight effort. • Assistance in project filing and archiving of previously generated construction documents. Change Order support. This scope and fee will serve as Supplement No. 6 of CAG-09-170. The Consultant Fee Determination is attached to this scope of work and is labeled Exhibit E-1. B. Deliverables Consultant deliverables are described in Task 14 of the Scope of Work. C. Proposed Schedule This supplement will extend the current contract completion date of December 3111,2014 to March 311C, 2015. D. Scope of Work Task 14—Construction Services This task covers the effort required to manage the contract and assure that the project meets the City's expectations for schedule,budget and quality of product. Effort included under this task is as follows: City of Renton 1 of 2 KPG Rainier Avenue S Supplement#6 6/18/2014 14.7 Project Oversight—The consultant shall continue project oversight duties that include, but are not limited to: the preparation of DBE Paperwork, Contractor Payrolls, Weekly Statement of Working Days, Pay Estimates, Environmental Permitting Closeout and other Project Closeout Paperwork. This task also covers any field walkthroughs required during the remainder of Plant Establishment Phase of the contract. 14.8 Project Filing and Archiving—As directed by the City,the consultant shall provide support to the City in organizing project files for archiving. This includes the remainder of the ROW flies and the paperwork identified in Tasks 14.7 and 14.9. 14.9 Change Order Support—As directed by the City,the consultant shall provide support during the discussions, negotiations, and preparation of a Change Order currently under review with the City and JEL Deliverables: • Construction Documents generated through the project close-out effort and Filed. City of Renton 2 of 2 KPG Rainier Avenue S Supplement X16 611812014 *40,01 EXHIBIT E-1-Supplement No.6 CONSULTANT FEE DETERMINATION SUMMARY SHEET PROJECT:Rainier Ave 5(SR 167)-S Grady Way to S 2nd St DIRECT SALARY COST(DSC): Classification Est.Hours Est Rates Est.Cost Project Manager 16 x $ 57.00 = $ 912.00 Senior CM Engineer 240 x $ 44.95 - $ 10,788.00 Documentation Engineer 160 x $ 40.87 $ 6,539.20 DSC Subtotal 416 $ 18,239.20 OVERHEAD(OH COST-including Salary Additives) DSC x OH of 131.49% x $ 18,239.20 - $ 23,982.72 FIXED FEE(FF) DSC(only)x FF Rate of 30.00% x $ 18,239.20 = $ S,471.76 DSC TOTAL = $ 47,693.68 REIMBURSABLES: Widener and Associates $ 5,224.60 GRAND TOTAL-Supplement No.6 $ 52,918.28 Cl) A N LM r r !11 w< � 4Wtf 69 40 H 1!3 N f9 U1 N U g.; N +Pw O O ♦�♦ j!j � r r r r y 40 co OD r r r °p tD co O v t9 ti CD 40 � ►� r N m N O O O O O O O U +i9 W 4 � o a co flo o o r K W W � H soro o o g w vs 4 G d CL CL � � W r C qr Cia ro, To tFA fn W ;1.% C o m u m '- G t _ w 0 CC N E m t � m U. CLQ CL V ~ i6cN Qaawo 0 V "c 12? N >..— C O �0 r v cc v LL cc = CL F H F 1-