Supplemental Agreement Organization and Address
KPG,P.S.
Number 6 753 9th Ave North
Original Agreement Number Seattle,WA 98109
CAG 09-170 Phone: 206-286-1640
Project Number Execution Date Completion Date
0655E 10/5/2009 3/31/2015
Project Title New Maximum Amount Payable
Rainier Ave S(SR 167)-S Grady Way to S 2nd St $ 4,238,427.44
Description of Work
See attached Scope of Work-Exhibit A-1
The Local Agency of City of Renton
desires to supplement the agreement entered into with KPG, Inc
and executed on 10/5/2009 and identified as Agreement No, CAG 09-170
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
1
Section 1, SCOPE OF WORK, is hereby changed to read: ,
Attgtr.hed Fxhihij AJ for Supplement 06--,
p
Section IV,TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for
completion of the work to read: L&rcil z Ig ')AI C
III
Section V, PAYMENT,shall be amended as follows:
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above ase sign in the appropriate spaces
below and return to this office for final action.
By: n itzier X By:
�- Denis Law, Mayor
Consultant Signature Approving Authority Signature
ATTEST:
DOT Form 140-053EF Jason A. Set , acting City Clerk
Revised 912005
Exhibit A-1
City of Renton
Rainier Ave S(SR 167)—S Grady Way to S 2"d St
Supplement No.6(CAG 09-170)
Construction Services—Project Oversight and Close-Out
KPG Inc
Scope of Work
A. Project Description
The purpose of this supplement is to perform project close-out activities for the Rainier Avenue S
Project. These activities include the following:
• Continued project oversight and construction documentation support for the remainder of the
construction contract.
• Preparation, filing, and archiving of the required project paperwork generated during the
project oversight effort.
• Assistance in project filing and archiving of previously generated construction documents.
Change Order support.
This scope and fee will serve as Supplement No. 6 of CAG-09-170. The Consultant Fee Determination is
attached to this scope of work and is labeled Exhibit E-1.
B. Deliverables
Consultant deliverables are described in Task 14 of the Scope of Work.
C. Proposed Schedule
This supplement will extend the current contract completion date of December 3111,2014 to March 311C,
2015.
D. Scope of Work
Task 14—Construction Services
This task covers the effort required to manage the contract and assure that the project meets the City's
expectations for schedule,budget and quality of product. Effort included under this task is as follows:
City of Renton 1 of 2 KPG
Rainier Avenue S
Supplement#6 6/18/2014
14.7 Project Oversight—The consultant shall continue project oversight duties that include, but are
not limited to: the preparation of DBE Paperwork, Contractor Payrolls, Weekly Statement of
Working Days, Pay Estimates, Environmental Permitting Closeout and other Project Closeout
Paperwork. This task also covers any field walkthroughs required during the remainder of Plant
Establishment Phase of the contract.
14.8 Project Filing and Archiving—As directed by the City,the consultant shall provide support to the
City in organizing project files for archiving. This includes the remainder of the ROW flies and
the paperwork identified in Tasks 14.7 and 14.9.
14.9 Change Order Support—As directed by the City,the consultant shall provide support during the
discussions, negotiations, and preparation of a Change Order currently under review with the
City and JEL
Deliverables:
• Construction Documents generated through the project close-out effort and Filed.
City of Renton 2 of 2 KPG
Rainier Avenue S
Supplement X16 611812014
*40,01
EXHIBIT E-1-Supplement No.6
CONSULTANT FEE DETERMINATION SUMMARY SHEET
PROJECT:Rainier Ave 5(SR 167)-S Grady Way to S 2nd St
DIRECT SALARY COST(DSC):
Classification Est.Hours Est Rates Est.Cost
Project Manager 16 x $ 57.00 = $ 912.00
Senior CM Engineer 240 x $ 44.95 - $ 10,788.00
Documentation Engineer 160 x $ 40.87 $ 6,539.20
DSC Subtotal 416 $ 18,239.20
OVERHEAD(OH COST-including Salary Additives)
DSC x OH of 131.49% x $ 18,239.20 - $ 23,982.72
FIXED FEE(FF)
DSC(only)x FF Rate of 30.00% x $ 18,239.20 = $ S,471.76
DSC TOTAL = $ 47,693.68
REIMBURSABLES:
Widener and Associates $ 5,224.60
GRAND TOTAL-Supplement No.6 $ 52,918.28
Cl) A
N LM r r !11
w< � 4Wtf
69 40 H 1!3 N f9 U1 N
U g.; N +Pw O O
♦�♦ j!j � r r r r y
40 co
OD
r r
r
°p tD co O v t9
ti CD 40
� ►� r
N
m N O O O O O O O
U
+i9
W
4
� o a co flo o o
r
K W
W � H
soro o o g
w
vs
4
G
d
CL
CL
� � W
r
C
qr
Cia
ro, To tFA
fn
W ;1.%
C o m u m
'- G t _
w 0 CC N E
m
t � m
U.
CLQ CL V ~ i6cN
Qaawo
0
V "c
12? N >..—
C O �0 r v cc v LL cc
= CL F H F 1-