HomeMy WebLinkAboutAdden 4 f • CAG-09-170, Adden #4-12 I A 0 FWashington State Department of Transportation Supplemental Agreement Organization and Address KPG, Inc. Number 4 753 9th Ave North Original Agreement Number Seattle, WA 98109 CAG-09-170 Phone: 206-286-1640 Project Number Execution Date Completion Date 0655E 10/05/2009 1 12/31/2014 Project Title Rainier Ave S(SR 167)-S Grady Way New Maximum Amount Payable to S 2nd St $ 4,185,509.16 Description of Work Add scope of work and budget for additional environmental services,sampling,testing and monitoring due to contamination conditions encountered during construction.Add scope of work and budget for design revisions to relocate facilities (JUT,storm system,etc.)to minimize excavation in areas with contaminated soil and groundwater. The Local Agency of City of Renton desires to supplement the agreement entered into with KPG, Inc. and executed on 10/05/2009 and identified as Agreement No. CAG-09-170 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby revised to include: Attached Exhibit A-1 for Supplement No. 4. I II ve Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: No change. III Section V, PAYMENT,shall be amended as follows: Authorize maximum amount payable shall increase by$243,000.16 to a new maximum amount payable of $ 4,185,509.16,as set forth in the attached Exhibit E-1 for Supplement No. 4. kibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. By: Jason Fritzler, KPG gy. Denis Law, Mayor Date l3 'z' Consultant Signature Approving Authority Signature,.�- Attest: DOT Form 140-063 EF Bonnie I.Walton,City Clerk Revised 912005 i Exhibit A-1 City of Renton Rainier Avenue S(SR 167)-S Grady Way to S 2nd Street Supplement No.4(CAG 09-170) Construction Services—Environmental Monitoring During Construction KPG Inc Scope of Work A. Project Description The purpose of this supplement is to add scope of work and budget to the contract, for additional environmental services, due to conditions encountered during construction of the Rainier Ave S project. The extent of contamination encountered on the corridor thus far, is beyond the levels and areas anticipated for the project. Therefore, additional sampling,testing and monitoring is required,to determine the extents of the contamination and concentration levels. This is required in order to secure approval from the Department of Ecology to remove and properly dispose.of these contaminated materials as part of the project construction. Included with this supplement is budget for design revisions to relocate facilities(JUT, storm system, etc.)to minimize excavation in areas with contaminated soil and groundwater. This scope and fee will serve as Supplement#4 of CAG#09-170. The Consultant Fee Determination is attached to this scope of work and is labeled Exhibit E-1. B. Deliverables Consultant deliverables are described in Task 14 of the Scope of Work. C. Proposed Schedule The proposed work as defined in this scope shall continue until December 31St, 2014. E. Scope of Work Task 14—Construction Services This task covers the effort required to manage the contract and to assure that the project meets the City's expectations for schedule, budget, and quality of product. Effort included.under this task is as follows: 14.1 Management and Support—The Consultant shall manage, provide progress reports, and support Widener&Associates and GeoEngineers with providing City of Renton 1 of 2 KPG Rainier Avenue-Supplement#4 911712012 Exhibit A-1 material quantities and exhibits to the environmental team during the monitoring and testing activities during construction until December 2014. 14.2 The Consultant shall provide design revisions to the City and Construction Management Team where deemed appropriate by the City. These revisions will be based on the location,type, and concentrations of contaminated material found. These design revision may include the following: • Relocation of the joint utility trench alignment • Revise stormwater pipe connections, structure types, and backfill material • Revise depth of excavation in areas where possible and exposed to contaminates 14.3 Environmental Services (Widener&Associates)—The Consultant shall provide the services and deliverable outlined in Exhibit G-1 attached to this scope of services. The Fee under this task in outlined in detail in Exhibit G-1. 14.4 Construction Observation and Chemical Analysis(GeoEngineers)—The Consultant shall provide observation of the excavation of contaminated soil activities and obtain samples for chemical analytical testing per the original contract. This task expands the area of which these activities are occurring as well as amends the original scope and is defined in Exhibit G-1. The Fee under this task in outlined in detail in Exhibit G-1. Deliverables: • Project schedule and necessary updates • Monthly progress reports and invoicing • Provide exhibits and quantities to support environmental monitoring efforts • Additional deliverables are outlined in Exhibit G-1 City of Renton 2 of 2 KPG Rainier Avenue-Supplement#4 911712012 Exhibit E-1 Summary of Payments-CPFF City of Renton Rainier Avenue S (SR 167)-S Grady Way to S 2nd Street CAG 09-170 Basic Agreement Supplement#1' Supplement#2 Supplement#3 Suppiemenf#4 Total Direct Salary Cost $ 654,844 $ 147,461 $ 33,599 $ 24,386 $ 8,641 $ 868,931 Overhead (Including Payroll Additives) $ 1,071,522 $ 241,291 $ 54,978 $ 39,903 $ 14,140 $ 1,421,832 Direct Non-Salary Costs $ 1,073,043 $ 286,435 $ 300 $ 900 $ 216,627 $ 1,577,305 _ (Including subconsultants) Fixed fee $ 196,453 $ $ 10,079 $ 7,316 $ 2,592 $ 216,440 Management Reserve $ 100,000 $ $ - $ $ - $ 100,000 TOTAL $ 3,095,862 $ 675,187 $ 98,956 $ 72,504 $ 242,000 $ 4,184,509 s City of Renton KPG Rafnfer AvenueSupplement 4 9/17/2012 • Exhibit E-1 Hour and Fee Estimate City of Renton Rainier Avenue S(SR 167)-S Grady Way to S 2nd Street Supplement#4(CAG 09-170) Construction Services-Environmental Monitoring During Construction CATEGORY&HOURS W170 $ AL COSTS rol error roi. es Survey CADD Admin 0 2.9363 Task Description Mgr En r En r En r Tech. d Direct $62.50 $48.08 $40.87 $38.46 $48.46 $31.08. $21.63 t Cost 14 PREPARE P. S. &E 14.1 Management and Support 0 0 36 0 0 0 16 7.40 $ 5,336.43 14.2 Design Revisions 0 30 60 60 0 20 0 3.80 $ 20 036.72 14.3 Environmental Services(Widener&Associates See Attached Summary Sheet for Subconsultant Fee 0 $ $ 14.4 Construction Observation and Chem Analysts GeoEn inears See Attached Sum ary Sheet for Subconsultant Fee 0 $ $ Subtotal: 0 30 1 96 1 60 1 0 1 20 16 222 $ 8,64120 $ 25j373.16 O LS .0.. 30? 96 60, 0_ . .`:'.20 16. ` '222 City of Renton KPG Rainier Avenue-Supplement 4 911712012 - i Exhibit E-1 ,Consultant Fee Determination - Summary Sheet City of Renton Rainier Avenue S (SR 167) - S Grady Way to S 2nd St Supplement#4 (CAG 09-170) Construction Services - Environmental Monitoring During Construction Direct Salary . Direct Salary Classification Cost Total Hours Total Cost Senior Engineer $ 62.50 _ 0 $ - Project Manager $ 48.08 30 $ 1,442.40 Project Engineer $ 40.87 96 $ 3,923.52 Design Engineer $ 38.46 60 $ 2,307.60 Surveyor $ 48.46 0 $ - CADD Technician $ 31,08 20 $ 621.60 Administration $ 21.63 16 $ 346.08 DSC Subtotal 222 $ 8,641.20 Overhead (OH) Cost(Include Salary Additives) OH Rate x DSC of 163.63% $8,641.20 $ 14,139.60 Fixed Fee (FF) FF Rate 30.00% $8,641.20 $ 2,592.36 DSC Total $ 25,373.16 Direct Reimbursables Mileage $ 500.00 Reproduction $ 500.00 APS $ - Reimbursable Total $ . 1,000.00 Subconsultants Fehr & Peers $ - GeoEngineers $ 35,617.00 Pharos/HDR $ - Jacobs $ - Widener &Associates $ 181,010.00 GHD/Rosewater $ - Bright Engineers, Inc. $ - Subconsultant Total $ 216,627.00 Total Agreement Amount $ 243,000.16 � City of Renton KPG Rainier Avenue-Supplement 4 911712012 • • Exhibit G-1 Subconsultant Scope of Work City of Renton Rainier Ave S(SR 167)—S Grady Way to S 2"d St Supplement No.4(CAG-09-170) Widener&Associates Task 14.3—Environmental Services CONSULTANT will perform the following Construction Support and Permit Compliance for the Project as follows: 1. Project Management a. Monthly Reporting and Invoicing. 2. Permit Compliance a. Monitor SWPPP for compliance with Construction Stormwater General Permit for duration of Project. b. Deliver electronic link to Biological Assessment updates every six months,as required for duration of Project. c. Monitor noise for compliance with noise variance requirements and assist with analysis if determined to be out of compliance. 3. Construction Support a. Construction Outreach Planning Meeting-Present and discuss the Public Outreach Plan at a meeting with City, KPG and Construction Management Consultant. CONSULTANT will refine and prepare a final document describing the outreach plan for use by the City, Construction Management Consultant and Contractor. b. Property Survey/Assessment of Needs—CONSULTANT.will prepare and deliver a preconstruction survey to property owners(up to 45 businesses)along the construction corridor to inquire about special needs and access, business hours and deliveries, residents with disabilities, medical problems,construction sensitivities,power and water interruptions for utility changeovers,and other concerns.The survey will help identify potential construction mitigation options.The survey will be conducted by CONSULTANT,and may be accompanied by the City, KPG and Construction Management Consultant. c. Survey Matrix—CONSULTANT will create a matrix indicating all affected properties along the corridor, showing site access and contact information that can be updated with information from the preconstruction survey, property owner commitments, easement restrictions, utility adjustment,and property restoration needs,and used to track any as-built information for each property owner. City of Renton 1 of 2 Widener and Associates Rainier Ave—Supplement#4 911712012 Exhibit G-1 Subconsultant Scope of Work City of Renton Rainier Ave S(SR 167)-S Grady Way to S 2"d St Supplement No.4(CAG-09-170) Widener&Associates Deliverables: • Property Owner Survey • Property Owner Survey Matrix • Construction Hotline—CONSULTANT will set up and maintain a dedicated community hotline,24 hours a day,7 days a week,for construction concerns. 4. Hazardous Materials Identification-Provide the City with assistance to quantify the contamination level in the soils and the drainage system in and around the former Scott's Dry Cleaner site. a. Take water samples from existing drainage system and test pits. b. Send water samples to testing lab for analysis. Compile results. c. Dig test pits for water and soil samples.Soil samples to be taken and analyzed by others. See Task 14.4. d. Develop Worker Safety Plan based on sampling and testing results. Deliverables: • Summary of test results • Worker Safety Plan City of Renton 2 of 2 Widener and Associates Rainier Ave—Supplement#4 911712012 EXHIBIT G-1 Subconsultant Fee Determination-Summary Sheet City of Renton Rainier Ave S(SR 167)-S Grady Way to S 2nd St. Supplement No.4(CAG-09-170) Widener and Associates Project Senior Biologist/ Task Description Manager Planner Hours Hours 14.3 Project Management 160 0 Permit Compliance Monitor SWPPP 368 0 Update Biological Assessment 180 35 Monitor Noise 80 0 Construction Support Public Outreach Plan 30 40 Property Survey/Assess Needs 60 60 Survey Matrix 30 40 Hazardous Materials Identification Testing Water Samples 58 30 Analysis of Results 60 Test Pits 40 Work Safety Plan 16 40 Total hours 1,082 225 Summary Hours Hourly Rate Labor Project Manager 1,082 $ 50.00 $ 54,100.00 Project Biologist 225 $ 31.00 $ 6,975.00 Total Labor= $ 61,075.00 Overhead= 150% $ 91,612.50 Profit= 30% $ 18,322.50 Total= $ 171,010.00 Reimbursables: Testing-Analytical Resources $ 10,000.00 Total= $ 181,010.00 GEOENGINEER� 84101541^Avenue NE Redmond,Washington 98052 425.861.6000 EXHIBIT G4 CITY OF RENTON RAINIER AVENUE S(SR 167)-S GRADY WAY TO S 2ND STREET SUPPLEMENT NO.4(CAG 09-170) CONSTRUCTION SERVICES- ENVIRONMENTAL MONITORING DURING CONSTRUCTION GEOENGINEERS SCOPE OF WORK SEPTEMBER 5,2012 Task 14-Construction Services Subtask 14.4 Construction Observation and Chemical Analysis(GeoEngineers) The Consultant shall provide observation of the excavation of contaminated soil and obtain samples for chemical analytical testing per the original contract. Scope includes excavation of approximately 15 test pits in the vicinity of the former Scott Dry Cleaner and subcontracted chemical analysis of soil samples on a RUSH (24-hour)turn around basis,reviewing catch basin water sample data and attending meetings to identify remedies and solutions,and waste designation and coordination support. DeUverables: ® Health and Safety Plan Template. s Data transmittal of all sampling performed for the City in the ROW adjacent to the former dry cleaner. a Revised Request for Contained Out Determination to Ecology. ® Construction observation final report. U q _ mtNOm mNm ONl T N t'm3 tN N O V NOO fNDr a W N O O O t` n m M f�h O NtAO m C�t0 C Z 69 G !n e» t»ui tr! en eA � W a p 03 8 l7 Ao 0 0o � c _ N V V_N C_ E F sg f� c E� U C N N N N N N m m m sr l0 Nf,� 0 m m v C O m m a 0) N N N OpD d MM V is c Z 4 (n N O N 7 O d N �-m N .p C', I W 77 .'k N.-N N lO m W Z C m K a W r 0 G L A N CW7 r E y W ° N tN O paj 0 m. LL C m m O m 0 m O m p m^ W O O 01 N ��» 2 w . F- C '- .� fyj c y o U)w 2 LL d G N zf a J r N a v N N ° c �- E N U C 7 N N O m m N N �Ny N _ m Z C'O a N•^W N Ei2 'a J > F rn CL CL m ,`m w y (n C c x Z M LD U o d m F` O H ;x ul U ws m U a co v aymn':Sr n 2 a � m c m m n (nn C. m ° O c a v E 0 4 N E em mfn° mm u) 0 d « �� OU c O o 2D'� «c2mc `o o dN aN moc mq m e U E m c€"•j m aU'amc C° pE 0 'tl0m °•mv oN o ) cn p- m _ ya urea c c vim:,,' vm 2dvF-O'ccur mEul E d o C UO m >° > O m D d t EM m 0 O O nu oL EO j m >ULL U _ E Y a ��b ° o o- roo m y Exhibit G-1 City of Renton Rainier Avenue Improvments Construction Observation Consultant Fee Estimate- GeoEngineers, Inc. Hourly Estimated Classification Hours Rate Cost Principal 24 $63.46 $1,523 Senior PM1 38 $38.46 $1,461 Project Scientist 1 26 $30.53 $794 Staff Eng3 0 $32.69 $0 Staff Sci3 128 $25.48 $3,261 Senior Tech 8 $24.76 $198 Admnstrtr 3 20 $20.97 $419 Admnstrtr 2 7 $19.23 $135 Total Hours 251 Total Direct Salary Cost(DSC) $7,792 Overhead Cost(OH) 213.37% $16,625 Fixed Fee(FF) 30.00% $2,338 Total Labor Cost $26,755 DIRECT EXPENSES Vehicle($.505 per mile) $242 Communication ($0.50 per minute for 30 minutes) $20 Field Supplies $2,000 Copies($0.12 per copy) $600 Subtotal Direct Expenses $2,862 SUBCONSULTANT/SUBCONTRACTOR EXPENSES Chemical Analytical Laboratory $6,000 Total Subconsultant/Subcontractor Expenses $6,000 Total Estimated Fee $35,617 File em No. era,2009 GEoENGINEER September 3,2009