Loading...
HomeMy WebLinkAboutAdden 2 CAG-09-170, Adden #2-11 Washington State VIA# Department of Transportation Supplemental Agreement organization and Address pp g KPG,Inc. Number 2 753 9th Ave North Seattle,WA 98109 Original Agreement Number Phone: 206-286-1640 Project Number Execution bate Completion Date CAG-09-170 10/5/2009 12/31/2014 Project Title New Maximum Amount Payable Rainier Avenue S.(SR 167)Final PS&E $ 3,870,005.00 Description of Work Design changes to modify the scope of the project between Sunset/S.3rd Street and S.2nd Street. The Local Agency of City of Renton desires to supplement the agreement entered into with KPG,Inc. and executed on 10/5/2009 and identified as Agreement No. CAG-09-170 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: ,Se ached Sn .pe of Work I I Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: Cnmpletion' ate of December 31, 2014 remains unchanged- Section V, PAYMENT, shall be amended as follows: The nriginal enntrart aC supplamented hvgn»temc ntal Agreement Wtimhnr t in the.amnunt n# S1771,049.00 %hall he increwwrl h!4128,956_00 to $3,870,005.00, as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. Denis Law, Mayor, City of Renton By: D r aGo � By _ su n lgrsaiu g # Approving Authority Signature �- as DOT Form 1 A0 063 - ` .: .'`_;,' Date Revised 9/20 • l�Q� � e?it k..c♦ Bomtie L Walton,City Clerk EXHITBIT A City of Renton Rainier Avenue Grady Way to S 2"d Street Supplement No. 2 Budget Adjustment for.Design of the.Reduction of Improvements North of SW SunsetBIvd/S 3 rd.Street (SR 900) KPG Scope of Work July 20th,2011 Purpose Due to budget constraints for the project,the City has elected to reduce the scope of the project, north of Sunset/S 3rd Street to S 2nd Street. While the project limits remain the same, a .number of design elements have been eliminated from this segment of the project. Therefore; he plans need to be modified to reflect these changes. This will require additional design work on the drawings and utility coordination. The design elements to remain within this segment of the project include new channelization,signing and ADA wheelchair ramps:: Changes to the plans, estimates and specifications have become necessary as,follows:' Task 7-Utility Coordination. 7.3 The Consultant shall coordinate with franchise utilities to incorporate the necessary relocations, adjustments,or upgrades into the project design. Design of franchise utility relocations,adjustments,or upgrades will be completed by the utility owner and is not included in this scope of work. Additional coordination'with the franchise utilities will be required to adjust their utility relocation plans based on the revised project limits. City of Renton 1 KPG Roinier Avenue=supplement 2 712012011 Task 10—Prepare Final Plans, Specifications and Estimates 10.5 The consultant shall incorporate City review comments and finalize the contract documents including preparation of engineer's.construction cast.. estimate ready for bid advertisement. Changes to the plans that will occur with the deletion of most of the work north of Sunset Blvd/S 2"d Street are as follows: Revise the following sheets: Cover Sheet, Index Sheet, 3 Right of Way Plans, 5 Typical Section.Sheets, 2 Detail Sheets, 2 Wall Plans, 3 Construction Channelization Plans, 1 Temporary Signal Plan, 9 Site Preparation Plans,9.Alignment Plans, 1 Alignment Profile Plan, 1 Drainage Plan,2 Drainage Profile.Plans, 1 Water Plan, 2 Water Profile Plans, 1 Temporary Water Plan,>1 Joint Trench Plan, 2 Joint Trench Profile Plans, 2 Joint Trench Section Sheets, 2 Island Detail Sheets, 1 Property. Restoration Plan,4 Driveway Plans, 1 Channelization Plan; 2-Illumination Plans,8 Signal Plans, 6 Urban Design Plans, 2 Irrigation:Plans and.3 Landscape Plans. Thiistotals 78 plan sheets that will require modifications. In addition, 38 plan.sheets will need to be deleted from the plan set; City of Renton 2 KPG Rainier Avenue-Supplement 2 712012011 Hour Summary • KPG . EXHIBIT E Hour and Fee Estimate City of Renton Rainier Avenue S(SR 167) SW Grady Way to S 2nd Street Supplement#2 July 20,2011 CATEGORY&HOURS TOTAL COSTS rot Senlor I Praj. Des 15urveyl CADD Aomin 1.00 2.9363 Task Description Mgr En r Engr En r Tech. Direct Direct $62.50 $48.08$40.87 $38.46 $48.48 $31.06 $21.63 Hours Cost Cost 1 PROJECT MANAGEMENT I COORDINATION I ADMINISTRATION General Project Management 16 months (Additional 9 Months 0 0 0 0 0 0 0 0 $0 . $0 Prepare and maintain project schedule Additional 9 Months 0 0 0 0 0 0 0 0 s0 $0 Prepare monthly Progress re ons and Invoices Additional 9 Months 0 0 _ 0 _ - 0 �0 0 0 0 � $0 $0 N12Mernent and administration of subconsultants Additional 9 Months) 0 0 0 0 0 0 0 0 $0 $0 . City staff c000rdination meetings estimate 36)(Additional 9 Months) 0 0 0 0 0 0 0 0 $0 $0 Subtotal: 0 0. 0 0 0 0 0 0. _ $0. $0 2 QUALITY CONTROL I QUALITY ASSURANCE 60%OA/QC 0 0 0 0 o 0 0 0 $0 so 90%QA(QC 0 0 0 0 0 0 0 0 $0 $0 Comructabll Claim Avoidance 0 0 0 0 0 0 0 0 $0 $0 Subtotal: a 0 . 0 0 0 0 0 0 so $0. 3 ISURVEY AND BASE MAPS lernental sine - - a 0 0 0 0 0 0 - o $o $0 Right g(+ua staking 0 0 0 0 0 0 0 0 so $o Survey of up to 40 pothole locations 0 0 0 0 0 0 0, 0 $0 $o Subtotal; 0 0 0 0. 0 0 0 0 $0 so 4 PUBLIC INVOLVEMENT re for and attend one t community meeting 0 0 0 0 0. 0 0 0 _ $0 $0 Attend one-on-one-property owner meetings lest 50) 0 0 0 0 0 0 0 0 so s0 Prepare project newsletters fast 2 O 0 0 0 0 O 0 0 $0 s0 re ics and monthty updatas ford web site os! 0 0 0 0 0 0 0 0 $0 s0 Prepare for and attend two 2)City council meetiM 0 0 0 0 0 0 0 0 $0 $0 Subtotat ._0-.- 0 .- 0 0 0 0 0 0 $0 $0 S WSDOT COORDINATION DOT coordination est 4 0 0 —5-7 0 0 0 0 0 $a $0 Document bee notes and phone correspondence with WSDOT 0 0 0 1 0 . .0 o. 0 0 so _ s0 Subtotal: 0 0 0 1 0 0 0, 0 0 so $0 6 SOUND TRANSIT COORDINATION Sound Transit Coordination meetings last,6 0 0 0 1 0 a 0 0 0 s0 _ $0 Prepare.submR and respand to ST comments 0 0 0 0 0. 0 0 0 $0 $0 Document meatino notes and ohone correspondence wllh ST 0 _ -0 1 0 0 0 0 0 0.- $0 s0 Subtotal: 0 0 1 0 0 1 0 Q 0 0 $0 $0 7 UTILITY COORDINATION Distribute plan Wormatton to uWas 0 0 2 2 0 -0 0 4 $159 $466 Coordination for rekmaltons,a usimernst of franchise utilities(Ufflr&y Undergrounding Coord 0 0 8 6 0 0 0 16 $635 $1,863 Franchise uffity coordination meetings ast 41(Utillty Undergroundling 2 4 4 0 0 0 0 10 $481 $1.412. . Subtotal: 2 4 14 10 0 0 0 30 $1.274 $3.741 8 GEOTECHNICAL INVESTIGATION Coordinate geotachnicall exploration plan for Phase II ESA 0 0 0 0 1 0 0 0 0 $0 $0 SubtoW!l 0 0 0 0 1 0 0 0 0 $0. $0 City of Renton KPG Roinler Avenue-Supplement 2 712012011 Hour Summary KPG EXHIBIT E Hour and Fee Estimate City of Renton Rainier Avenue S(SR 167) SW Grady Way to S 2nd Street Supplement#2 July 20,2011 CATEGORY&HOURS TOTAL COSTS rot Senior P.J. es survey CADD Admin 1.00 2.9363 Task Description Mgr Engr Engr I Engr Tech. Direct. Drect $62.50 .08 $40.87 $38.46 $48.46 $31.08 $21.63 Hours Cost Cosh 9 JENVIRONMENTAL DOCUMENTATION Coots nate Em*onmental Documentation rPhass It ESA.Phase III,and cultural resources 0 0 0 0, 0 1 =0 =O 0 $0 SO Subtotal;' 0 0 0 0 0 0 0 0 $0 $0 10 PREPARE P. S.,&E Calculate Quantities and Cost Estimate 2 4 24 24 0 0 0 54 $2221 $6.522 Prepare Bid Documents(M2&78 Shests and Delete 38 Sheets 4 32 210 230 1 0 326 32 836 $30.103 $86.393 Subtotal: 6 36 234 254 1, 0 328 32 830 $32.325 S94,915 11 RIGHT OF WAY Coordinate apWalsaWnegotlatlons Re-Do Right of Way Plans} 0 0 0 0 0 6 0 0 $0 $0 Subtotal: 0. 0 0 0. 0 0 0.. 0 $0 $0 12 IGRANT FUNDING ASSISTANCE Grant a hcatlonstcoord nation 0 0 0 D 0 0. 0 0 $O $0 Subtotal:. 0 0 0 0 a 0 0 0 $0 $0 13 ISID PHASE SUPPORT Duestlonsladdendumlbid tabulation 0 0 0 0 0 0 0 0 $0 $0 Subtotal: 0 0 0 0 0 0. 0 0 $0 $0 14 .CONSTRUCTION SERVICES tiro nt.coordhadon,and adn*tstration 0 0 0 0 0 0 0 0 so $0 Opp construction support 0 0 0 0 0 0 0 0 $0 $0 On-call construction survey support 0 0 0 0 75 0 0 0 $0 $0 Prepare record drawhm 0 0 0 0 0 0 0 0 $0 Subtotal: 0 0 0 0 0. 0. 0, 0 S $0 15 Structural Engineering( New Task Prepare Structural Plans 0 0 0 0 0 1 0 - 0 0 $0 $0 Subtotal: 0 0 . 0 0 0 1 0. 0 0_ $0 . SO Torats: II�SSa€ �8656: � City of Renton KPG Rainier Avenue-Supplement 2 712012011 KPG Exhibit E CONSULTANT FEE DETERMINATION SUMMARY OF COST City of Renton Rainier Avenue S (SR 167) SW Grady Way to S 2nd Street Supplement#2 Direct Salary Direct:.Salary Classification Cost Total Hours Total.Cost Senior Engineer $62.50 8 $500.00 Project Manager $48..018:1 40 $1,923.20 Project Engineer $40.87 248 $10,135.76' Design Engineer $38.46 264 $10,153.44 Surveyor, $48.46 0 CADD Technician $31.08 328 $10,194.24 Administration $21.63 32 $692.16 DSC Subtotal 920 $33,598.8.0: Overhead(OH) Cost (Include Salary Additives) OH Rate x DSC of 163.630o: $33,598.80 $54,977.72. Fixed.Fee (FF) FF Rate 30.00% $33,598.80 $1,0,079.64 DSC Total $98,656.16 Direct Reimbursables Mileage $0.00 Reproduction $300.00 APS $0.00 Reimbursable Total $300.00 Subconsultants Fehr& Peers $0:00 GeoEngneers $0.00 Pharos/HDR $0.00 Jacobs $0.00 Widener Associates GHD/Rosewater $0.00 Bright Engineers, Inc. $0.00 Subconsultant Total $0.00 Total.Agreement Amount $98,956 City of Renton KPG Rainier Avenue-Supplement 2 712012011