CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: CAG 09-171— 2009 Earlington Water and Sewer Improvements Project C.OX 7
CONTRACTOR: Laser Underground and Earthworks, Inc.
SUMMARY OF PROPOSED CHANGE=:
Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra
work as outlined below:
ITEM AAAI+Innnl ntinnfiflac IlnriprThic rhnnap nrder Unit Ouantitv _ Unit - Total Price
C07 A no cost change order for time extension only. LS 1 NC NC
Additional time needed for pavement repair, painting
hydrants, and minor site restoration.
Original contract completion date: October 20, 2010
Current contract completion date: June 20, 2011
Subtotal 'p'u.uu
9.5% Sales Tax $0.00
Total $0.00
ORIGINAL CONTRACT
AMOUNT
CURRENT CONTRACT
AMOUNT
ESTIMATED NET
CHANGETHISORDER
ESTIMATED CONTRACT
TOTAL AFTER CHANGE
$2,162,511.12
$2,451,547.73
$0.00
$2,451,547.73
Cost Allocation
Water Utility
425.455170.018.595.34.63.000
$0.00
Sewer Utility
426.465405.018.595:35.63.000
$0.00
SIGNATURES: � r •
Contractor: te, Date: 3 3d 1 J
Project Engineer: Date: 36 fid!%
Approved By: Date: �6 t
(Water. Utility'Supervisor)