HomeMy WebLinkAboutCO 6CITY OF RENTON FEB 13 2012 CITY OF RENTON Public Works Department RECEIVED CITY CLERK'S OFFICE CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 09-171— 2009 Earlington Water and Sewer Improvements Project C.O.tt 6 CONTRACTOR: Laser Underground and -Earthworks, Inc. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, Insurance for the complete work required forthe extra work as outlined below: TFM Additional Ouantitles Under This Chanee Order Unit Quantity Unit Total Price C06 Additlonal work for Sewer Utility: Additional potholing LS and saddle installation resulting from new main alignment due to poor soll conditions. _ Additional work for Water Utllity: Additional fittings and LS revised connection to existing mains, additional 6" cut and cap, 2" water service installation for Earlington Park, and additional air vac. Additional costs due to delay of work from crossing LS mislocated/missing utilities and duct banks. 1 $8,756.95 $8,756.951 $22,523.95 $22,523.951 1 $12,821.51 $12,821.511 I Subtotal $44,102.41 9.5% Sales Tax $4,189.73 Total $48,292.14 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE THiS ORDER ESTIMATED CONTRACT TOTAL AFTER CHANGE $2,162,511.12 $2,403,255.59 $48,292.14 $2,451,547.73 Cost Allocation Water Utility 425.455170.018.595.34.63.000 $31,683.50 Sewer Utillty• 426.465405.018.595.35.53.000 $16,608.64 SIGNATURES: Contractor: Project Engineer: Approved By: _ Date: Date: Date: (f /—(Water Utility Sup visor) CAUsc \Dral I:meV+ppUaRill.DenilMlemsolilN�iudowsl'rentpcirnry Interncl Files\GnnlodLOutioak�2f'Y13QQIt9\ChnngcOrclerG_12-141(l.UOC/AWnti