Loading...
HomeMy WebLinkAboutCO 5CITY OF RENTON rr+ VOW FEB 1' 2012 RECEIVED CITY OF RENTON CITY CLERK'S OFFICE Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 09-171— 2009 Earlington Water and Sewer Improvements Project . C.O.# 5 CONTRACTOR: 'Laser Underground.and Earthworks, Inc. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: .ITEM Additinnal Quantities Under This Chanee Order Unit Quantity Unit Total Price COS Additional work for Sewer Utility Change in site LS 1 $31,276.55 $31,276.55 conditions due to poor soils and excessive groundwater, causing trench collapse. Additional work for Water Utility: Installing 1" water LS 1 $4,692.00 $4,692.00 service at one address on SW 3rd Pi, and four addresses on Earlington Ave. SW. Additional costs due to delay of work from crossing LS 1 $19,077.02 $19,077.02 mislocated/missing utilities. Subtotal 9.5% Sales Tax $5,229.33 Total $60,274.90 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE THIS ORDER ESTIMATED CONTRACT TOTAL AFTER CHANGE $2,162,511.12 $2,342,980.69 $60,274.90 $2,403,255.59 Cost Allocation Water Utility 425.455170,018.595,34.63.000 $15,582.41 Sewer Utility 426.465405.018.595.35.63.000 $44,692.49 SIGNATURES: Contractor: Project Engineer: -Approved By: Date: Date: / bate: l� C AUsetABrcl I111cinc1 1:11cslCunlcnl,OiiQonk�21'YBQQR91C'hungeDi-der5 12-14-10.DOC/AWA